Information based on query as of Saturday, June 29, 2024.
Permit Information
Permit NumberBLD12-01699
StatusFinaled
Name FALASH & ROSS CONSTRUCTION
Site Address 1750 W FRONT ST
Project NameGROVE PARK
Customer Number 
ePlanReviewYes
Description
(NO TENANT - 2ND FLOOR)(INTERIOR DEMO & NEW WINDOWS) Remodel on existing 16,298 sq. ft. second floor to demolish many interior non-bearing walls and create (10) new exterior openings with new windows per structural engineering and approved plans. Special Inspection required for welding and epoxy/adhesive anchors. There is no approved tenant under this permit. This is a Scope of Work Permit. A separate permit will need to be obtained for a tenant to occupy this space. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. Planning approval done under CZC12-00132. (JCB)
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
First Notice12/30/201512/30/20151/12/2016 DONE
DetailsCandy A. Nichols
mailed 1-13-16
BLD-Final12/29/201512/30/201512/30/2015APASS
DetailsDave Hannah
Call 30 minutes before to meet // Gil Phone #: ###-####
DOC - Permit Finaled12/30/201512/30/201512/30/2015PPASS
DetailsDave Hannah
Telephone call  12/28/2015 DONE
Left a message for Gill about a final inspection to be scheduled
FIRE-Final Inspection2/6/20132/6/20132/6/2013PPASS
DetailsForrest France
Plan assigned to (JCB)7/11/2012 7/12/2012 PASS
DetailsJason Blais
Routing - PLAN CHECK7/11/2012 7/12/2012 PASS
DetailsJason Blais
PLANS/APPL TAKEN TO FRONT DESK  7/12/2012 DONE
DetailsJason Blais
1st review completed  7/12/2012 PASS
DetailsJason Blais
Permit Ready to Issue  7/12/2012 DONE
Issue PAID IN FULL permit  7/12/2012 DONE
DetailsAlexandra L. DeYoung
Telephone call  7/11/2012 DONE
DetailsChristina Prado
sent email giving fees due to architect
Intake Approval  7/11/2012 PASS
DetailsJason Blais
Prescreen approved by Jason 7/10/12. Plan Review Fees paid on 7/11/12.
Pending Assignment by JCB7/11/2012 7/11/2012 DONE
DetailsJason Blais
Routing - Design Review7/11/2012 7/11/2012 PASS
DetailsJosh Wilson
Intake Approval  7/6/2012 FAIL
DetailsTim L. Woodard
Doug,

Sheets A0.0 and A1.0 do not have the architectural stamp. Please provide that stamp and reupload those two sheets. All other submittal requirements are met with drawings.

Tim Woodard
###-####
Application received  6/27/2012 DONE
Application submitted via PDS Online on Jun 27 2012 9:48AM