First Notice | 12/30/2015 | 12/30/2015 | 1/12/2016 | | DONE |
Candy A. Nichols
|
|
|
mailed 1-13-16
|
BLD-Final | 12/29/2015 | 12/30/2015 | 12/30/2015 | A | PASS |
Dave Hannah
|
|
|
Call 30 minutes before to meet // Gil Phone #: ###-####
|
DOC - Permit Finaled | 12/30/2015 | 12/30/2015 | 12/30/2015 | P | PASS |
Dave Hannah
|
|
|
|
Telephone call | | | 12/28/2015 | | DONE |
|
|
|
Left a message for Gill about a final inspection to be scheduled
|
FIRE-Final Inspection | 2/6/2013 | 2/6/2013 | 2/6/2013 | P | PASS |
Forrest France
|
|
|
|
Plan assigned to (JCB) | 7/11/2012 | | 7/12/2012 | | PASS |
Jason Blais
|
|
|
|
Routing - PLAN CHECK | 7/11/2012 | | 7/12/2012 | | PASS |
Jason Blais
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/12/2012 | | DONE |
Jason Blais
|
|
|
|
1st review completed | | | 7/12/2012 | | PASS |
Jason Blais
|
|
|
|
Permit Ready to Issue | | | 7/12/2012 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 7/12/2012 | | DONE |
Alexandra L. DeYoung
|
|
|
|
Telephone call | | | 7/11/2012 | | DONE |
Christina Prado
|
|
|
sent email giving fees due to architect
|
Intake Approval | | | 7/11/2012 | | PASS |
Jason Blais
|
|
|
Prescreen approved by Jason 7/10/12. Plan Review Fees paid on 7/11/12.
|
Pending Assignment by JCB | 7/11/2012 | | 7/11/2012 | | DONE |
Jason Blais
|
|
|
|
Routing - Design Review | 7/11/2012 | | 7/11/2012 | | PASS |
Josh Wilson
|
|
|
|
Intake Approval | | | 7/6/2012 | | FAIL |
Tim L. Woodard
|
|
|
Doug,
Sheets A0.0 and A1.0 do not have the architectural stamp. Please provide that stamp and reupload those two sheets. All other submittal requirements are met with drawings.
Tim Woodard
###-####
|
Application received | | | 6/27/2012 | | DONE |
|
|
|
Application submitted via PDS Online on Jun 27 2012 9:48AM
|