Third Notice | | 11/21/2012 | 11/28/2012 | | DONE |
|
|
|
|
Third Notice | | 10/20/2012 | 11/16/2012 | | DONE |
|
|
|
mailed to GC
|
Second Notice | | 9/30/2012 | 10/15/2012 | | DONE |
|
|
|
|
First Notice | | 9/3/2012 | 9/20/2012 | | DONE |
|
|
|
|
Print Occupancy Form | | | 8/24/2012 | | DONE |
Tisha Gallop
|
|
|
|
Permanent Occupancy | | | 8/24/2012 | | DONE |
Tisha Gallop
|
|
|
e-mailed to Nate at Legacy Homes.
|
BLD-Final | 8/21/2012 | 8/22/2012 | 8/22/2012 | P | PASS |
Jim Sly
|
|
|
DOUG after 3 if possible Phone #: ###-#### OK for Perm Occ.
|
FIRE-Final Inspection | 8/22/2012 | 8/22/2012 | 8/22/2012 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
FIRE-Final Inspection | 7/27/2012 | 7/30/2012 | 7/30/2012 | A | FAIL |
Troy Cobbley
|
|
|
No approved plan modification on site and no fire sprinkler work has been performed.
|
Plan resubmittals received | | | 7/30/2012 | | PASS |
|
|
|
New plan sheet 2 provided reducing scope of work. Original plan showing new glass wall around a conferenceroom was deleted and three existing office doors on offices were removed to leave offices open to tenant space.
|
BLD-Final | 7/25/2012 | 7/27/2012 | 7/27/2012 | P | NR |
Jim Sly
|
|
|
request after 3pm//Nate Phone #: ###-#### Called Nate at 2:30pm.......No return call. Went to site. No one there. Need fire final insp. 1st.
|
FIRE-Final Inspection | 7/25/2012 | 7/26/2012 | 7/27/2012 | P | NH |
Forrest France
|
|
|
request after 3pm//Nate Phone #: ###-#### *NOTE* Arrived on site at 5:30 PM on 7/26- no access available to complete inspection. Phoned contact regarding schedule.
|
Print Occupancy Form | | | 7/25/2012 | | DONE |
Tisha Gallop
|
|
|
|
FIRE-Final Inspection | 7/12/2012 | 7/13/2012 | 7/13/2012 | P | FAIL |
Troy Cobbley
|
|
|
Build the Conference Room and provide sprinkler modifications for the overspaced head in the Break Room.
|
Plan assigned to (DRS) | 7/12/2012 | 7/12/2012 | 7/12/2012 | | PASS |
Dan Stuart
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/12/2012 | | PASS |
Dan Stuart
|
|
|
|
Print Occupancy Form | | | 7/12/2012 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 7/12/2012 | | DONE |
Tisha Gallop
|
|
|
|
Telephone call | | | 7/12/2012 | | |
|
|
|
called Nate and told him permit is ready, fees and need GC/from
|
Issue PAID IN FULL permit | | | 7/12/2012 | | DONE |
Christina Prado
|
|
|
|
1st review completed | | | 7/12/2012 | | PASS |
Dan Stuart
|
|
|
|
Plan assigned to (TLW) | 6/28/2012 | | 7/12/2012 | | PASS |
Tim L. Woodard
|
|
|
|
Routing - PLAN CHECK | 6/29/2012 | | 7/12/2012 | | PASS |
Dan Stuart
|
|
|
Deferred from Tim due to vacation.
|
Application received | | 6/28/2012 | 6/28/2012 | | DONE |
Barbara Stitt
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 6/28/2012 | | DONE |
Barbara Stitt
|
|
|
|
Intake Approval | | | 6/28/2012 | | PASS |
Tim L. Woodard
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 6/28/2012 | | DONE |
Barbara Stitt
|
|
|
|