Third Notice | | 3/5/2014 | 3/18/2014 | | DONE |
|
|
|
This permit finaled on the web by Curtis Weedop
|
Third Notice | | 2/8/2014 | 2/28/2014 | | DONE |
|
|
|
e-mailed to curtis
|
Third Notice | | 1/4/2014 | 2/3/2014 | | DONE |
|
|
|
e-mailed to Curtis
|
Second Notice | | 12/7/2013 | 12/30/2013 | | DONE |
|
|
|
e-mailed Curtis Weedop
|
First Notice | | 11/8/2013 | 11/27/2013 | | DONE |
Christina Prado
|
|
|
Emailed Curtis final value certs for completion
|
Permanent Occupancy | | | 10/29/2013 | | DONE |
Barbara Stitt
|
|
|
|
BLD-Final | 10/21/2013 | 10/22/2013 | 10/22/2013 | A | PASS |
Dave Hannah
|
|
|
Daryl Phone #: ###-####
|
FIRE-Final Inspection | 10/18/2013 | 10/18/2013 | 10/18/2013 | P | PASS |
Forrest France
|
|
|
Fire life safety passed final inspection. Exit sign at the SE access repaired while on site.
|
BLD-Ceiling Grid Inspection | 9/26/2013 | 9/27/2013 | 9/27/2013 | A | PASS |
Dave Hannah
|
|
|
Daryl Phone #: ###-####
|
BLD-Framing/Rough-in | 7/26/2013 | 7/29/2013 | 7/30/2013 | A | PASS |
Dave Hannah
|
|
|
final framing phase - daryl Phone #: ###-####9
|
BLD-Final | 6/6/2013 | 6/7/2013 | 6/7/2013 | A | PART |
Tony Young
|
|
|
daryl Phone #: ###-####,, temp occupancy on phase 2 ok
|
FIRE-Final Inspection | 6/3/2013 | 6/4/2013 | 6/4/2013 | A | PART |
Forrest France
|
|
|
"Phase two" partial fire life safety inspection completed. Provide ceiling tile at the soiled utility room.
|
BLD-Ceiling Grid Inspection | 5/1/2013 | 5/3/2013 | 5/3/2013 | A | PASS |
Dave Hannah
|
|
|
daryl Phone #: ###-####
|
BLD-Framing/Rough-in | 3/5/2013 | 3/6/2013 | 3/6/2013 | A | PASS |
Dave Hannah
|
|
|
daryl Phone #: ###-#### ok to cover walls phase two
|
BLD-Final | 1/22/2013 | 1/23/2013 | 1/23/2013 | A | PART |
Tom Arcoraci
|
|
|
daryl Phone #: ###-#### phase one ok
|
FIRE-Final Inspection | 1/18/2013 | 1/22/2013 | 1/22/2013 | A | PART |
Forrest France
|
|
|
Project "phase one" area fire life safety okayed.
|
FIRE-Final Inspection | 1/15/2013 | 1/16/2013 | 1/16/2013 | A | NR |
Forrest France
|
|
|
Missing fire life safety provisions at the east exit/entryway.
|
FIRE-Conference | 1/15/2013 | 1/15/2013 | 1/15/2013 | P | DONE |
Forrest France
|
|
|
Regarding project phases.
|
FIRE-Sprinkler Rough-in | 12/11/2012 | 12/11/2012 | 12/11/2012 | A | PART |
Forrest France
|
|
|
Ref. approved fire sprinkler plans for locations okayed to date.
|
BLD-Ceiling Grid Inspection | 11/29/2012 | 11/30/2012 | 11/30/2012 | A | PART |
Dave Hannah
|
|
|
Daryl Phone #: ###-#### ok to cover ceiling in first phase
|
BLD-Framing/Rough-in | 10/3/2012 | 10/4/2012 | 10/4/2012 | A | PART |
Dave Hannah
|
|
|
Daryl Phone #: ###-#### phase one ok to cover walls
|
Permit Ready to Issue | | | 8/30/2012 | | DONE |
Tisha Gallop
|
|
|
|
Issue PAID IN FULL permit | | | 8/30/2012 | | DONE |
Tisha Gallop
|
|
|
|
Print Occupancy Form | | | 8/30/2012 | | DONE |
Tisha Gallop
|
|
|
|
Plan assigned to (CJW) | 7/10/2012 | 7/10/2012 | 8/13/2012 | | PASS |
Carl Westfall
|
|
|
MSTI PEDS - 1ST STORY CCI ClINIC (20 days - Aug 3) ePlanReview case
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/13/2012 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 8/9/2012 | | 8/13/2012 | | PASS |
Carl Westfall
|
|
|
The drawings were approved, with "red lines" after the resubmittal review.
|
Plan resubmittals received | | | 8/8/2012 | | |
|
|
|
|
1st review completed | | | 8/2/2012 | | FAIL |
|
|
|
Failed building
|
Routing - PLAN CHECK | 7/10/2012 | | 8/2/2012 | | FAIL |
Carl Westfall
|
|
|
The IBC plan review was started on July 30 and was finished on Aug 2. Revised drawings were required. See the plan review report.
|
Routing - FIRE | 7/10/2012 | | 7/13/2012 | | PASS |
Scott Arellano
|
|
|
Attached Plan Review report to plans.
|
Routing - Addressing | 7/10/2012 | | 7/11/2012 | | PASS |
April Wing
|
|
|
Ste# was taken out to reflect the correct flr # on the plans. Applicant called back and said thier are no ste # on 1 flr.
|
Routing - Design Review | 7/10/2012 | | 7/11/2012 | | PASS |
Sarah Schafer
|
|
|
Sarah Schafer - One exterior door to be removed and infilled
Approved through building permit application.,
|
Routing PW Sewer Rating | 7/10/2012 | | 7/11/2012 | | PASS |
Connie Baumgartner
|
|
|
|
Routing PW Environmental | 7/10/2012 | | 7/10/2012 | | PASS |
Walt Baumgartner
|
|
|
|
Pending Assignment by JCB | 7/10/2012 | | 7/10/2012 | | DONE |
Jason Blais
|
|
|
|
Routing - PUBLIC WORKS | 7/10/2012 | | 7/10/2012 | | PASS |
Beverly Mountain
|
|
|
|
Routing - PLUMBING | 7/10/2012 | | 7/10/2012 | | PASS |
Bill VanDegrift
|
|
|
|
Intake Approval | | | 7/9/2012 | | PASS |
Jason Blais
|
|
|
Carl Madsen completed prescreen on 7/6/12. Plan Review Fees paid on 7/9/12.
|
Application received | | | 7/2/2012 | | DONE |
|
|
|
Application submitted via PDS Online on Jul 2 2012 9:06AM
|