Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD12-01742
StatusFinaled
Name BILTMORE COMPANY
Site Address 1521 W ALEXANDRA LN
Project NameLloyd Subdivision
Customer Number 
ePlanReviewNo
Description
Lloyd Subdivision Four-Plex - (Lot 7) To construct a new 3,963 sq. ft., two story, Four unit, apartment building. Each unit has a total of 990 square feet, two bedrooms, and two bathrooms. The 1st story units are required to be Type 'B' units. All four units share a common path of egress into and through a 1-hour exit corridor with 60 minute fire-resistive, listed, labeled, self-closing door assemblies from the dwelling units into the corridor. All construction per the approved plans, attached plan review report, and all other reviewing agencies approvals. One hour fire-partitions and one hour horizontal assemblies are required between dwelling units. This building is required to be fire sprinklered. The fire sprinkler system shall be per NFPA 13R as regulated by the fire department. Separate Fire Sprinkler and Fire Alarm permits will be required. CUP12-00003 & DRH12-00118 Per Planning and Zoning. **SRZ**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
First Notice3/18/20133/18/20137/2/2015 DONE
DetailsJim Storey
This permit finaled on the web by Jeremy Amar
BLD-Aging Inspection3/18/20133/18/20133/18/2013 PASS
DetailsJim Storey
DOC - Permit Finaled3/18/20133/18/20133/18/2013PPASS
DetailsJim Storey
pw ok final ok
Temporary Occupancy1/15/20134/15/20131/15/2013 DONE
DetailsDarla L Downs
BLD-Final1/14/20131/14/20131/14/2013PPASS
DetailsJim Storey
Pat Phone #: ###-####
BLD-Final1/11/20131/14/20131/14/2013ANR
DetailsJim Storey
Pat Phone #: ###-####
FIRE-Final Inspection1/11/20131/11/20131/11/2013APASS
DetailsForrest France
Fire life safety finaled.
Zoning Approval Temp1/11/20131/11/20131/11/2013 PASS
DetailsJosh Wilson
Bonding in place for playground equipment. 180-day max
FIRE-Final Inspection1/7/20131/8/20131/8/2013ANR
DetailsForrest France
Pending project related FIR permits.
FIRE-Sprinkler Rough-in1/2/20131/2/20131/2/2013PPART
DetailsForrest France
Overhead fire sprinkler work approved for cover.
FIRE-Conference11/19/201211/19/201211/19/2012PDONE
DetailsForrest France
Regarding fire alarm permit work.
BLD-Energy code compliance11/16/201211/16/201211/16/2012PPASS
DetailsJim Storey
Pat Phone #: ###-####
BLD-Framing/Rough-in11/13/201211/13/201211/13/2012PPART
DetailsJim Storey
pat Phone #: ###-#### ok to insulate upon ele aproval.
BLD-Wall Bracing10/18/201210/18/201210/18/2012PPASS
DetailsJim Storey
Pat Phone #: ###-####
Plan resubmittals received  10/16/2012 DONE
new acca reports
Routing - MECHANICAL10/16/2012 10/16/2012 PASS
DetailsTroy James
resubmitted acca reports
BLD-Foundation9/20/20129/20/20129/20/2012PPASS
DetailsJim Storey
pat Phone #: ###-####
BLD-Footing9/19/20129/19/20129/19/2012PPASS
DetailsJim Storey
pat Phone #: ###-####
Issue PAID IN FULL permit  8/24/2012 DONE
DetailsBarbara Stitt
Route to Impact Fee Review8/22/20128/27/20128/23/2012 PASS
DetailsCindy M. Gould
Telephone call  8/23/2012 DONE
DetailsChristina Prado
called Greg to advise permit is ready and Rp is needed
Permit Ready to Issue  8/23/2012 DONE
DetailsChristina Prado
Print Occupancy Form  8/21/2012 DONE
DetailsBarbara Stitt
PLANS/APPL TAKEN TO FRONT DESK  8/17/2012 DONE
DetailsSam Zahorka
Plan assigned to (SRZ)7/3/2012 8/17/2012 PASS
DetailsSam Zahorka
1st review completed. Waiting for corrections.
Routing - MECHANICAL8/15/2012 8/16/2012 PASS
DetailsTroy James
Routing - PLAN CHECK8/7/2012 8/15/2012 PASS
DetailsSam Zahorka
Routing - FIRE7/31/2012 8/7/2012 PASS
DetailsScott Arellano
Attached Comments to plans.
1st review completed  8/7/2012 FAIL
Failed Plan Check and Mechanical.
Routing - PLAN CHECK7/19/2012 7/30/2012 FAIL
DetailsSam Zahorka
Routing - MECHANICAL7/11/2012 7/19/2012 FAIL
DetailsTroy James
emailed corrections to Alley
Routing - PLUMBING7/9/2012 7/11/2012 PASS
DetailsDaryl Spivey
Install a dcva on water service and per plans and 2003 UPC.
Routing - Erosion and Sediment7/6/2012 7/9/2012 PASS
DetailsClint A Smith
ESC12-00683 plan approved with additional conditions attached to the permit.
Routing - PUBLIC WORKS7/5/2012 7/6/2012 PASS
DetailsConnie Baumgartner
Routing - PLANNING7/6/2012 7/6/2012 PASS
DetailsJosh Wilson
Routing - Addressing7/5/2012 7/5/2012 PASS
DetailsApril Wing
For Ste numbers see PW documents
Routing - PLANNING Land Div7/2/2012 7/3/2012 PASS
DetailsTodd Tucker
Pending Assignment by JCM7/2/2012 7/3/2012 DONE
DetailsJohn Menard
Plans ACCEPTED BY PLAN TECH  7/2/2012 DONE
DetailsChristina Prado
Intake Approval  7/2/2012 PASS
DetailsChristina Prado
Recd Pcfee & Taken To Pln CK  7/2/2012 DONE
DetailsChristina Prado
Application received 7/2/2012