Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD12-01747
StatusFinaled
Name J & B CONSTRUCTION LLC
Site Address 350 N MILWAUKEE ST
Project NameBTS-EXTERIOR REMODEL
Customer Number 
ePlanReviewNo
Description
(BTS-EXTERIOR FACADE REMODEL) Perform select structural demolition of beams, columns, walls and roof joist / roofing systems at west face of tenant space located between the lower level main mall entry and mall to the North, Penny's to the East and The Cheese Cake Factory to the South. Add new structural footings / foundation, steel columns, beams; non-combustible high parapet wall framing, high wall bracing, exterior EIFS and metal wall panel system on furring over weather barrier over Dens Glass sheathing on the steel frame; maintain and add to height of existing 2-hour fire wall between the future H&M retail and existing Cheese Cake Factory tenant spaces; with limited, site, electrical and sprinkler system work, all in preparation for new tenant, H & M retail. Tenant improvement for H&M retail will be under separate permits currently submitted for review. Special inspection required for concrete, welding, steel, epoxy anchor systems for concrete and masonry. drs
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 2/26/20133/25/2013 DONE
mailed with letter
Third Follow up  3/25/2013 DONE
DetailsTisha Gallop
company on hold 4/22/13
Third Notice 2/3/20132/21/2013 DONE
mailed to J & B
Third Notice 1/8/20131/29/2013 DONE
mailed to J & B Const
Second Notice 12/13/20121/3/2013 DONE
First Notice11/19/201211/19/201212/3/2012 DONE
DetailsMike Jordan
mailed 12-4-12
BLD-Final11/19/201211/19/201211/19/2012PPASS
DetailsMike Jordan
Jeremy Phone #: ###-####
DOC - Permit Finaled11/19/201211/19/201211/19/2012PPASS
DetailsMike Jordan
FIRE-Final Inspection11/16/201211/19/201211/19/2012APASS
DetailsTroy Cobbley
Life safety passed
FIRE-Final Inspection11/16/201211/16/201211/16/2012PCANC
DetailsTroy Cobbley
Overbooked. Jeremy is going to reschedule for monday morning. Phone #: ###-####
BLD-Framing/Rough-in8/29/20128/30/20128/30/2012APASS
DetailsMike Jordan
Jeremy Phone #: ###-####. Exterior steel studs for storefront, west elevation only.
Issue PAID IN FULL permit  8/3/2012 DONE
DetailsTisha Gallop
Inspection Record Card- Bld  7/31/2012 DONE
Permit Ready to Issue  7/31/2012 DONE
DetailsBarbara Stitt
Telephone call  7/31/2012 DONE
DetailsBarbara Stitt
Called Greg and told him that permit is ready, fees due, need GC & RP info on 7/31/12 @ 3:11pm///BAS
Plan assigned to (DRS)7/3/20127/3/20127/30/2012 PASS
DetailsDan Stuart
Routing - PLAN CHECK7/26/2012 7/30/2012 PASS
DetailsDan Stuart
Plan resubmittals received  7/30/2012 DONE
DetailsTisha Gallop
received response letter, two copies of form 310, ES Report masonry, ES Report thermal and moisture protection, two copies of plan sheets A-0.1 and A-6.2; inserted by permit tech. and taken back to Dan Stuart.
PLANS/APPL TAKEN TO FRONT DESK  7/30/2012 PASS
1st review completed  7/26/2012 FAIL
Failed Plan Check
Routing - FIRE7/25/2012 7/26/2012 PASS
DetailsScott Arellano
No separate review comments attached. A fire sprinkler permit will be required for the necessary fire sprinkler modifications.
Plan resubmittals requested  7/25/2012 DONE
Routing - PLAN CHECK7/5/2012 7/25/2012 FAIL
DetailsDan Stuart
Resubmittals required. Copy of plan review report e-mailed to design professional. Plans routing to fire code analyst for review.
Routing - Erosion and Sediment7/5/2012 7/5/2012 PASS
DetailsClint A Smith
ESC12-00687 plan waiver approved with conditions attached to the permit.
Routing - PUBLIC WORKS7/5/2012 7/5/2012 PASS
DetailsConnie Baumgartner
Routing - Design Review7/5/2012 7/5/2012 PASS
DetailsAndrea Tuning
Andrea Tuning - DRH12-00163
Routing PW Drainage7/5/2012 7/5/2012 PASS
DetailsTerry Records
Approved-no new impermeable surface.
Routing PW Sewer Rating7/5/2012 7/5/2012 PASS
DetailsConnie Baumgartner
Pending Assignment by JCB7/2/2012 7/3/2012 DONE
DetailsJason Blais
Routing - Addressing7/3/2012 7/3/2012 PASS
DetailsApril Wing
May require new address, will look at issue when TI comes thru.
Application received 7/2/20127/2/2012 DONE
DetailsBarbara Stitt
Intake Approval  7/2/2012 PASS
DetailsSam Zahorka
Plans ACCEPTED BY PLAN TECH  7/2/2012 DONE
DetailsBarbara Stitt
Recd Pcfee & Taken To Pln CK  7/2/2012 DONE
DetailsBarbara Stitt