BLD-Final | 3/27/2015 | 3/27/2015 | 3/30/2015 | P | NR |
Dave Hannah
|
|
|
Matt Phone #: ###-#### needs elec final
|
BLD-Concrete | 9/5/2012 | 9/6/2012 | 9/7/2012 | P | PASS |
Dave Hannah
|
|
|
Matt Mundy Phone #: ###-####
|
BLD-Footing | 9/5/2012 | 9/6/2012 | 9/7/2012 | A | PASS |
Dave Hannah
|
|
|
Matt Mundy Phone #: ###-####
|
PubWorks Subgrade Approval | 9/6/2012 | 9/6/2012 | 9/6/2012 | | DONE |
Terry Records
|
|
|
Footing subgrade approved by the geotechnical engineer
|
Routing Walk-In (PW Hillside) | 7/3/2012 | 7/3/2012 | 7/3/2012 | P | PASS |
Terry Records
|
|
|
FOOTINGS SUBGRADE TO BE INSPECTED BEFORE FOUNDATION IS POURED BY A GEOTECH
|
Routing Walk-In (Zoning) | 7/3/2012 | 7/3/2012 | 7/3/2012 | P | PASS |
Colleen T Carroll
|
|
|
|
Routing Walk-In (BLD) | 7/3/2012 | 7/3/2012 | 7/3/2012 | P | DONE |
Perry Paine
|
|
|
|
Plan assigned to (PEP) | 7/3/2012 | 7/3/2012 | 7/3/2012 | | PASS |
Perry Paine
|
|
|
|
Case Summary (BLD) | | | 7/3/2012 | | |
|
|
|
|
Inspection Record Card- Bld | | | 7/3/2012 | | |
|
|
|
|
1st review completed | | | 7/3/2012 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/3/2012 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 7/3/2012 | | DONE |
Tisha Gallop
|
|
|
|
Issue PAID IN FULL permit | | | 7/3/2012 | | DONE |
Tisha Gallop
|
|
|
|
Inspection Record Card- Bld | | | 7/3/2012 | | DONE |
Tisha Gallop
|
|
|
|
Application received | | 7/3/2012 | | | |
|
|
|
|