Permit Information
Permit NumberBLD12-01772
StatusFinaled
Name SUN VALLEY MARBLE
Site Address 15 N ALLUMBAUGH ST
Project NameSUN VALLEY MARBLE
Customer Number 
ePlanReviewNo
Description
(SUN VALLEY MARBLE) Permit is to repair an existing 22,200 square foot building to bring its area and roof structure into compliance. NOTE: Upgrade Agreement on file for this building as is attached to this case. PLAN MODIFICATION 12-20-13 – Modification submitted to add two (2) hour rooms to store flammable materials. These rooms were required to comply with Fire Barrier requirements needed to separate control areas.**TLW** Work will be completed in two phases (west side and then east side). Work is to include: upgrade existing separation wall to comply as a Fire Wall, construct crickets to adequately slope drainage to existing roof drains, repair existing trusses that are in disrepair due to water infiltration, installation of new fire rated doors in existing CMU wall openings, and provide new roofing where needed. . This building is not fire sprinklered. **TLW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Print Statement  4/8/2014 DONE
DetailsBarbara Stitt
First Notice 3/7/20144/1/2014 DONE
Faxed 4-1-14
Agreement of Future work8/1/20128/1/20133/6/2014  
DetailsJason Blais
Upgrade Agreement attached to this case. Permit BLD12-01772.

3/6/14 - Work under the Upgrade Agreement has been completed. A copy of the recoreded Notice of Compliance is attached to this case.
Case Summary (BLD)  2/25/2014  
Permanent Occupancy  2/25/2014 DONE
DetailsChristina Prado
BLD-Final2/11/20142/12/20142/12/2014APASS
DetailsTom Arcoraci
Terry or Dorian Phone #: ###-#### ok after zoning signs off
Zoning Approval2/12/20142/12/20142/12/2014 DONE
DetailsSarah Schafer
FIRE-Final Inspection2/10/20142/11/20142/11/2014APASS
DetailsTroy Cobbley
life safety passed
Plan Reviewer's activity  1/2/2014  
Must re-review this project as it was originalyy reviewed as a sprinkled and alarmed build which it is not. CDH
(F) Reprint permit  12/31/2013 DONE
CHANGE STATUS TO (ISS)  12/31/2013 DONE
Plan assigned to (TLW)12/16/2013 12/24/2013 PASS
DetailsTim L. Woodard
Routing - PLAN CHECK12/23/2013 12/24/2013 PASS
DetailsTim L. Woodard
Print Occupancy Form  12/24/2013 DONE
Telephone call  12/24/2013 DONE
DetailsChristina Prado
called Dorian to advise permit is ready for pick up and gave fees due
Routing - FIRE12/20/2013 12/23/2013 PASS
DetailsCraig D. Hanson
See Fire Plan Review for Hazmat requirements
Case Summary (BLD)  12/20/2013 DONE
DetailsTim L. Woodard
Routing - PLAN CHECK12/16/2013 12/20/2013 PASS
DetailsTim L. Woodard
Plan Modification Accepted  12/16/2013 DONE
DetailsChristina Prado
Received plan modification application for changes made to "Warehouse 11". Received two sets of revised plan sheets marked A2.0, A2.2, A2.3 & A2.4; Taken to Tim for review
FIRE-Final Inspection10/18/201310/21/201310/21/2013PFAIL
DetailsTroy Cobbley
Repaair the two exit sign/emergency lights as noted and discuss with plan review if there is a need to resubmit plans showing the two small rooms, one of which cntains two 50 gallon drums of flammable liquids.
BLD-Final10/16/201310/17/201310/17/2013APASS
DetailsTom Arcoraci
Terry Phone #: ###-####
Plan Reviewer's activity  7/29/2013 DONE
DetailsJason Blais
Dorian called indicating work is still occurring and will be completed fairly soon but not quite by the date of the Upgrade Agreement. Maybe a month longer or so. This is acceptable as work has progressed nicely and is almost completed. No need to modify the agreement at this point.
FIRE-Final Inspection5/16/20135/20/20135/20/2013APART
DetailsTroy Cobbley
A temporary for the life safety is approved for the east half of the building per letter from Jason.
Plan Reviewer's activity  5/16/2013 DONE
DetailsJason Blais
East side of building upgraded. Temporary occupancy can be granted on this side. If leased to another tenant, that tenant shall apply for a permit to obtain their own Certificate of Occupancy.
BLD-Final5/14/20135/15/20135/15/2013ACANC
DetailsTom Arcoraci
BLD-Final5/13/20135/14/20135/14/2013PPART
DetailsTom Arcoraci
east side ok for occupancy
BLD-Final5/10/20135/13/20135/13/2013PDEFR
DetailsTom Arcoraci
terry Phone #: ###-####
FIRE-Final Inspection5/10/20135/13/20135/13/2013APART
DetailsTroy Cobbley
Life safety for the east half of the building is passed. The work for the west half is not yet complete.
FIRE-Conference3/25/20133/26/20133/26/2013ADONE
DetailsForrest France
On site conference with contractors regarding plan review red-line comments, fire extinguisher placement, premise identification, entrance gate, etc. A plan modification shoud be done to include the removal of one door between the east side offices and affected exiting.
FIRE-Conference3/19/20133/25/20133/25/2013ADONE
DetailsForrest France
Regarding conditions for fire life safety approvals, scope of work, schedule, etc.
Zoning Approval3/21/20133/21/20133/21/2013 DONE
DetailsSarah Schafer
BLD-Framing/Rough-in3/11/20133/12/20133/12/2013APASS
DetailsTom Arcoraci
terry Phone #: ###-####
BLD-Framing/Rough-in11/26/201211/28/201211/28/2012APASS
DetailsTom Arcoraci
Terry Phone #: ###-#### ok to cover
BLD-Conference10/30/201210/30/201210/30/2012PPASS
DetailsTom Arcoraci
Issue PAID IN FULL permit  10/16/2012 DONE
Plan assigned to (TLW)8/27/2012 10/15/2012 PASS
DetailsTim L. Woodard
Sun Valley Marble - Reassigned to Tim Woodard
Routing - PLAN CHECK8/31/2012 10/15/2012 PASS
DetailsTim L. Woodard
Approved with Redlines and a Plan Review Report. TLW
PLANS/APPL TAKEN TO FRONT DESK  10/15/2012 DONE
DetailsTim L. Woodard
Case Summary (BLD)  10/15/2012 DONE
DetailsTim L. Woodard
Print Occupancy Form  10/15/2012 DONE
DetailsChristina Prado
Permit Ready to Issue  10/15/2012 DONE
DetailsTisha Gallop
Telephone call  10/15/2012 DONE
DetailsTisha Gallop
called Dorian and told him permit is ready and fee.
Plan resubmittals received  9/25/2012  
9-25-12 received response and 2 copies of sheets A0.0,A0.1,A2.0,A2.1,A4.0 sent to Tim W
1st review completed  8/31/2012 DONE
DetailsTim L. Woodard
Routing - FIRE8/30/2012 8/31/2012 PASS
DetailsScott Arellano
No comments attached.
Routing - PLAN CHECK8/27/2012 8/30/2012 FAIL
DetailsTim L. Woodard
Refer to plan review report. TLW
Plan assigned to (DRS)8/1/20128/1/20128/27/2012 DEFR
DetailsDan Stuart
Plans reassigned to Tim Woodard.
Routing - PLAN CHECK8/3/2012 8/27/2012 DEFR
DetailsDan Stuart
Reassigned to Tim Woodard.
Routing - Design Review8/1/2012 8/3/2012 PASS
DetailsSarah Schafer
Sarah Schafer
Pending Assignment by JCB7/31/2012 8/1/2012 DONE
DetailsJason Blais
Plans ACCEPTED BY PLAN TECH  7/31/2012 DONE
Recd Pcfee & Taken To Pln CK  7/31/2012 DONE
Intake Approval  7/31/2012 PASS
DetailsTim L. Woodard
Application received 7/5/2012