BLD-Final | 4/19/2013 | 4/19/2013 | 4/22/2013 | P | PASS |
Tony Young
|
|
|
|
DOC - Permit Finaled | 4/22/2013 | 4/22/2013 | 4/22/2013 | P | PASS |
Tony Young
|
|
|
|
BLD-Conference | 4/18/2013 | 4/19/2013 | 4/19/2013 | A | PART |
Tony Young
|
|
|
sean Phone #: ###-####
|
BLD-Final | 4/18/2013 | 4/18/2013 | 4/19/2013 | P | NR |
Tony Young
|
|
|
sean Phone #: ###-####
|
PubWorks Occupancy Approval | 4/19/2013 | 4/19/2013 | 4/19/2013 | | DONE |
Jason C. Taylor
|
|
|
Received engineers aproval for grading. Occupancy is approved for Pubilc Works. Jason Taylor ###-####
|
BLD-Energy code compliance | 1/9/2013 | 1/10/2013 | 1/11/2013 | A | PASS |
Tony Young
|
|
|
Bert Phone #: ###-####
|
BLD-Energy code compliance | 1/9/2013 | 1/9/2013 | 1/9/2013 | P | NH |
Tony Young
|
|
|
Bert Phone #: ###-####
|
BLD-Framing/Rough-in | 1/7/2013 | 1/7/2013 | 1/7/2013 | P | PASS |
Tony Young
|
|
|
Burt Phone #: ###-####
|
BLD-Wall Bracing | 12/17/2012 | 12/18/2012 | 12/18/2012 | A | PASS |
Tony Young
|
|
|
bob Phone #: ###-####,, exterior ok
|
BLD-Foundation | 9/20/2012 | 9/20/2012 | 9/20/2012 | P | PASS |
Jim Storey
|
|
|
SEAN Phone #: ###-####
|
BLD-Footing | 9/11/2012 | 9/11/2012 | 9/11/2012 | P | PASS |
Tony Young
|
|
|
Burt Phone #: ###-####,, house ftgs ok
|
BLD-Footing | 9/10/2012 | 9/11/2012 | 9/11/2012 | A | PASS |
Tony Young
|
|
|
Sean Phone #: ###-####,,, house footings ok
|
PubWorks Subgrade Approval | 9/10/2012 | 9/10/2012 | 9/10/2012 | | DONE |
Terry Records
|
|
|
Footing subgrade approved
|
Issue PAID IN FULL permit | | | 8/7/2012 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 7/24/2012 | | DONE |
Tisha Gallop
|
|
|
|
Telephone call | | | 7/24/2012 | | DONE |
Tisha Gallop
|
|
|
called Sean and left vm permit is ready and fees
|
Plan assigned to (CDM) | 7/5/2012 | 7/5/2012 | 7/23/2012 | | PASS |
Carl D Madsen
|
|
|
|
Routing - PLAN CHECK | 7/18/2012 | | 7/23/2012 | | PASS |
Carl D Madsen
|
|
|
|
Routing - PLAN CHECK | 7/19/2012 | | 7/23/2012 | | PASS |
Carl D Madsen
|
|
|
|
1st review completed | | | 7/23/2012 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 7/23/2012 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/23/2012 | | |
|
|
|
|
Inspection Record Card- Bld | | | 7/23/2012 | | DONE |
|
|
|
|
Plan resubmittals received | | | 7/19/2012 | | DONE |
|
|
|
rec'd two copies of sheet A1.1 and 8.5x11 site plan - taken to Carl M
|
Routing - FIRE | 7/19/2012 | | 7/19/2012 | | PASS |
Tim Frost
|
|
|
|
Plan Reviewer's activity | | | 7/18/2012 | | DONE |
|
|
|
Emailed RP the project failed fire code review. Cited IFC reference
|
Routing - MECHANICAL | 7/18/2012 | | 7/18/2012 | | PASS |
Troy James
|
|
|
|
Routing - FIRE | 7/17/2012 | | 7/18/2012 | | FAIL |
Tim Frost
|
|
|
The project failed the fire code review. Please, see below:
The building does not comply with IFC: 503.1.1.. As an alternative, fire sprinklers could be utilized to increase the 150' distance. Please, see below.
503.1.1 Buildings and facilities.
Approved fire apparatus access roads shall be provided for every facility, building or portion of a building hereafter constructed or moved into or within the jurisdiction. The fire apparatus access road shall comply with the requirements of this section and shall extend to within 150 feet (45 720 mm) of all portions of the facility and all portions of the exterior walls of the first story of the building as measured by an approved route around the exterior of the building or facility.
Exception: The fire code official is authorized to increase the dimension of 150 feet (45 720 mm) where:
1. The building is equipped throughout with an approved automatic sprinkler system installed in accordance with Section 903.3.1.1, 903.3.1.2 or 903.3.1.3.
|
Routing - Erosion and Sediment | 7/16/2012 | | 7/17/2012 | | PASS |
Clint A Smith
|
|
|
ESC12-00700 plan approved with additional conditions attached to the permit.
|
Route to Impact Fee Review | 7/5/2012 | 7/10/2012 | 7/16/2012 | | PASS |
Cindy M. Gould
|
|
|
|
Routing - MECHANICAL | 7/12/2012 | | 7/16/2012 | | FAIL |
Troy James
|
|
|
emailed corrections to HVAC technologies
|
Routing - PLANNING | 7/11/2012 | | 7/12/2012 | | PASS |
David Moser
|
|
|
Note: Multiple retaining walls within the rear setback with a cumlative height greater than 6 feet must be separated by 5 feet horiziontally; as per condition #4 - CFH12-00015
|
Routing PW Grading-Hillside | 7/6/2012 | | 7/11/2012 | | PASS |
Terry Records
|
|
|
|
Routing - PUBLIC WORKS | 7/11/2012 | | 7/11/2012 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - Addressing | 7/6/2012 | | 7/9/2012 | | PASS |
Terry Records
|
|
|
|
Application received | | 7/5/2012 | 7/6/2012 | | DONE |
Tisha Gallop
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 7/5/2012 | | |
Tisha Gallop
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 7/5/2012 | | DONE |
Tisha Gallop
|
|
|
|
Intake Approval | | | 7/5/2012 | | PASS |
Tisha Gallop
|
|
|
|