BLD-Framing/Rough-in | 11/2/2012 | 11/2/2012 | 11/2/2012 | P | PASS |
Tony Young
|
|
|
Rodney-Please call at least 30 mins prior to inspection Phone #: ###-####
|
BLD-Framing/Rough-in | 10/23/2012 | 10/24/2012 | 10/24/2012 | P | NR |
Tony Young
|
|
|
call before//Rodney Phone #: ###-####.,, needs a mech permit and rough in inspection,, conf only
|
Routing Walk-In (Zoning) | 7/5/2012 | 7/5/2012 | 7/5/2012 | P | PASS |
Colleen T Carroll
|
|
|
|
Routing Walk-In (BLD) | 7/5/2012 | 7/5/2012 | 7/5/2012 | P | DONE |
Christina Prado
|
|
|
|
Plan assigned to (PEP) | 7/5/2012 | 7/5/2012 | 7/5/2012 | | PASS |
Christina Prado
|
|
|
|
Case Summary (BLD) | | | 7/5/2012 | | |
|
|
|
|
Inspection Record Card- Bld | | | 7/5/2012 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/5/2012 | | DONE |
Perry Paine
|
|
|
|
Permit Ready to Issue | | | 7/5/2012 | | DONE |
Christina Prado
|
|
|
|
Issue PAID IN FULL permit | | | 7/5/2012 | | DONE |
Christina Prado
|
|
|
|
Application received | | 7/5/2012 | | | |
|
|
|
|