DOC - Permit Finaled | | | 3/8/2013 | | DONE |
|
|
|
|
BLD-Final | 11/29/2012 | 11/29/2012 | 11/29/2012 | P | PASS |
Tom Arcoraci
|
|
|
|
BLD-Final | 11/28/2012 | 11/29/2012 | 11/29/2012 | A | NR |
Tom Arcoraci
|
|
|
Check for final .
|
FIRE-Final Inspection | 11/5/2012 | 11/6/2012 | 11/6/2012 | A | PASS |
Forrest France
|
|
|
Items on the correction notice have been finished with the exception of door hardware at the second exit. Tenant to repair prior to structural final as agreed. Life safety passed.
|
BLD-Other | 10/29/2012 | 10/30/2012 | 10/30/2012 | A | DONE |
Jim Storey
|
|
|
Issue CN if corrections not made to have completed within 5 days. posted c/n to complet fir c/n and get fire and building finals by 11/6/12
|
FIRE-Final Inspection | 8/22/2012 | 8/23/2012 | 8/23/2012 | P | FAIL |
Forrest France
|
|
|
Noted items include door hardware in need of revision at both main level exit doors and the restroom door, post fire extinguishers- one at each level with a min. rated 2A10BC and current certification tag. See general list of requirements items #2 and 4.
|
Issue PAID IN FULL permit | | | 8/22/2012 | | DONE |
Barbara Stitt
|
|
|
|
Plan assigned to (TLW) | 7/10/2012 | | 7/16/2012 | | PASS |
Tim L. Woodard
|
|
|
|
Routing - PLAN CHECK | 7/10/2012 | | 7/16/2012 | | PASS |
Tim L. Woodard
|
|
|
|
1st review completed | | | 7/16/2012 | | DONE |
Tim L. Woodard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/16/2012 | | DONE |
Tim L. Woodard
|
|
|
|
Case Summary (BLD) | | | 7/16/2012 | | DONE |
Tim L. Woodard
|
|
|
|
Print Occupancy Form | | | 7/16/2012 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 7/16/2012 | | |
|
|
|
|
Telephone call | | | 7/16/2012 | | |
|
|
|
7-16-12 called Michael permit ready for pick up ///dld
|
Application received | | 7/10/2012 | 7/10/2012 | | DONE |
|
|
|
|