Print Statement | | | 1/23/2013 | | DONE |
|
|
|
|
First Notice | | 11/29/2012 | 12/3/2012 | | DONE |
Christina Prado
|
|
|
mailed 12-4-12
|
BLD-Final | 11/19/2012 | 11/19/2012 | 11/19/2012 | P | PASS |
Jim Storey
|
|
|
301 ok for final 425 signed card
|
Change Expiration Date Only | | | 11/19/2012 | | DONE |
Barbara Stitt
|
|
|
|
Permanent Occupancy | | | 11/19/2012 | | DONE |
Barbara Stitt
|
|
|
|
Temporary Occupancy | 10/26/2012 | 1/24/2013 | 10/26/2012 | | DONE |
Barbara Stitt
|
|
|
|
BLD-Final | 10/25/2012 | 10/25/2012 | 10/25/2012 | P | PART |
Dave Hannah
|
|
|
joe Phone #: ###-#### ok for temp occ needs a perm noslipe surface final spec report and passage door hardware on office door
|
BLD-Final | 10/23/2012 | 10/24/2012 | 10/24/2012 | A | NR |
Jim Storey
|
|
|
Joe Phone #: ###-####
|
Zoning Approval | 10/24/2012 | 10/24/2012 | 10/24/2012 | | PASS |
Josh Wilson
|
|
|
|
BLD-Final | 10/22/2012 | 10/23/2012 | 10/23/2012 | P | FAIL |
Jim Storey
|
|
|
Joe Phone #: ###-#### si close out letter/ door hardware 2nd floor// sign on main exit/zoning sign off.
|
FIRE-Final Inspection | 10/22/2012 | 10/23/2012 | 10/23/2012 | A | PASS |
Forrest France
|
|
|
Fire life safety approved pending correct door hardware is installed at both mezzanine rooms and the fire sprinkler riser room- to be finished prior to structural final as discussed.
|
BLD-Footing | 10/11/2012 | 10/11/2012 | 10/12/2012 | P | PASS |
Dave Hannah
|
|
|
joe Phone #: ###-####
|
CHANGE STATUS TO (ISS) | | | 10/10/2012 | | DONE |
Tisha Gallop
|
|
|
picked up and paid for plan mod
|
OVERRIDE | | | 10/9/2012 | | |
|
|
|
|
Plan assigned to (CJW) | 9/25/2012 | 9/25/2012 | 10/9/2012 | | PASS |
Carl Westfall
|
|
|
JUMP TIME BOISE - Plan modification for ext. ramp
|
Routing - Design Review | 10/5/2012 | | 10/9/2012 | | PASS |
Josh Wilson
|
|
|
OK- adequate parking lot dimensions remian with enlarged access ramp JGW 10-9-12
|
Routing - PLAN CHECK | 10/9/2012 | | 10/9/2012 | | DONE |
Carl Westfall
|
|
|
Routing completed.
|
Print Occupancy Form | | | 10/9/2012 | | DONE |
Tisha Gallop
|
|
|
|
Telephone call | | | 10/9/2012 | | DONE |
Christina Prado
|
|
|
called Eric to advise permit is ready and gave fees due
|
BLD-Framing/Rough-in | 10/5/2012 | 10/5/2012 | 10/8/2012 | P | PASS |
Dave Hannah
|
|
|
late pm//Joe Kennedy ###-#### (plan mod in for ADA ramp, not approved yet)
|
Override - Parcel Holds | | | 10/5/2012 | | |
|
|
|
|
Routing - PLAN CHECK | 10/2/2012 | | 10/5/2012 | | PASS |
Carl Westfall
|
|
|
2nd version of modified drawings approved
|
Plan resubmittals received | | | 10/4/2012 | | DONE |
Christina Prado
|
|
|
Received one set of engineering calcs for a ramp deck as well as two sets of plans marked A7.1; gave to Carl Westfall for further review
|
Routing - PLAN CHECK | 9/25/2012 | | 10/2/2012 | | FAIL |
Carl Westfall
|
|
|
Revisions required.
|
Plan Modification Accepted | | | 9/25/2012 | | |
|
|
|
Plan modification accepted to revise ADA ramp layout and construction materials. Sheet A7.1 and structural calcs were submitted with plan mod app and no change in value.
|
OVERRIDE | | | 9/11/2012 | | |
|
|
|
|
Route to Impact Fee Review | 8/31/2012 | 9/6/2012 | 9/11/2012 | | PASS |
Shauna Surgeon
|
|
|
Interior changes only, no external new square footage.
|
Plan assigned to (CJW) | 8/3/2012 | 8/3/2012 | 9/11/2012 | | PASS |
Carl Westfall
|
|
|
JUMP TIME BOISE (20 days - Aug. 28)
|
Telephone call | | | 9/11/2012 | | DONE |
Tisha Gallop
|
|
|
called David Glancy and told him permit is ready, fee, need GC/rce/form and RP.
|
Issue PAID IN FULL permit | | | 9/11/2012 | | DONE |
Barbara Stitt
|
|
|
|
Routing - PLAN CHECK | 9/8/2012 | | 9/11/2012 | | PASS |
Carl Westfall
|
|
|
Drawings approved after 3rd review.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/11/2012 | | DONE |
|
|
|
|
Print Occupancy Form | | | 9/11/2012 | | DONE |
Christina Prado
|
|
|
|
Permit Ready to Issue | | | 9/11/2012 | | DONE |
Tisha Gallop
|
|
|
|
Routing - PLAN CHECK | 9/5/2012 | | 9/8/2012 | | FAIL |
Carl Westfall
|
|
|
Completed the 2nd review. One item not resolved.
|
Plan resubmittals received | | | 9/6/2012 | | DONE |
Christina Prado
|
|
|
Received two sets of plans marked S1.1. Routed to Carl Westfall for further review
|
Routing - FIRE | 8/31/2012 | 8/31/2012 | 9/5/2012 | | PASS |
Scott Arellano
|
|
|
Attached comments to plans.
|
1st review completed | | | 9/5/2012 | | FAIL |
|
|
|
Failed plan check.
|
Plan resubmittals received | | | 9/4/2012 | | |
|
|
|
9-4-12 received 1 comment,1 response letter and 2 copies of sheets A0.1,A0.4,A1.1,A1.2,A3.1,S1.1 sent to Carl W.
|
Routing - PLAN CHECK | 8/9/2012 | | 8/31/2012 | | FAIL |
Carl Westfall
|
|
|
The IBC plan review was started on Aug 28 and was finished on Aug 31. Revised drawings and more information was required. See the plan review report.
|
Routing - Design Review | 8/8/2012 | | 8/9/2012 | | PASS |
Josh Wilson
|
|
|
Josh Wilson - CZC12-00152
|
Routing - PLUMBING | 8/7/2012 | | 8/8/2012 | | PASS |
Bill VanDegrift
|
|
|
Per plans and 2003 UPC.
|
Routing - Erosion and Sediment | 8/6/2012 | | 8/7/2012 | | PASS |
Kimberly M. Johnson
|
|
|
Waiver Request approved per conditions
|
Routing - PUBLIC WORKS | | | 8/6/2012 | | PASS |
|
|
|
|
Plan Reviewer's activity | | | 8/3/2012 | | DONE |
Jason Blais
|
|
|
Emailed architect representative to contact ACHD for evaluation of any impact fees due. Written verification from ACHD needs to be provided to our Permit Counter prior to the building permit being issued.
|
Routing - Addressing | 8/3/2012 | | 8/3/2012 | | PASS |
April Wing
|
|
|
|
Pending Assignment by JCB | 8/2/2012 | | 8/3/2012 | | DONE |
Jason Blais
|
|
|
|
Application received | | 7/12/2012 | 8/2/2012 | | DONE |
|
|
|
|
Intake Approval | | | 8/2/2012 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN CHECK | | | 8/2/2012 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 8/2/2012 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 8/2/2012 | | DONE |
|
|
|
|
Intake Approval | | | 7/16/2012 | | FAIL |
|
|
|
|