Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD12-01838
StatusFinaled
Name BARROW DESIGN & CONSTRUCTION
Site Address 905 N 19TH ST
Project Name 
Customer Number 
ePlanReviewNo
Description
This project is for the addition of a new 860s.f. upper level to an existing 2664s.f. 1-story single family dwelling. R-1CH ok per DRH12-00122 by Matt Halitsky. Separate electrical, plumbing, mechanical permits are required. The project will include fully engineered steel beams and connections to allow for the construction of the new roof structure to be within the R-1CH design reqquirements. All per the approved plans as marked energy prescriptive componant method, Engineer's calculations and details along with the plan review notes. pep
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final8/16/20138/16/20138/16/2013PDONE
DetailsTony Young
DOC - Permit Finaled8/16/20138/16/20138/16/2013PPASS
DetailsTony Young
done
Zoning Approval8/15/20138/15/20138/15/2013 DONE
DetailsMatthew A Halitsky
BLD-Final8/14/20138/14/20138/14/2013PPART
DetailsTom Arcoraci
call is into Matt for historic approval - Bob Phone #: ###-#### ok for lc after zoning
BLD-Energy code compliance2/25/20132/26/20132/26/2013APASS
DetailsTony Young
Steve Phone #: ###-####
BLD-Framing/Rough-in2/22/20132/25/20132/25/2013APASS
DetailsTony Young
Steve Phone #: ###-####
BLD-Framing/Rough-in2/20/20132/21/20132/21/2013APASS
DetailsTony Young
Bob Phone #: ###-####
Routing - MECHANICAL2/19/2013 2/19/2013 PASS
DetailsTroy James
BLD-Framing/Rough-in2/13/20132/14/20132/14/2013ANR
DetailsTony Young
Steve Phone #: ###-####,, walk through only
Routing Walk-In (BLD)2/14/20132/14/20132/14/2013PPASS
DetailsPerry Paine
use window replacement policy....egress window ok with Matt...just do it.
BLD-Conference11/28/201211/29/201211/29/2012APART
DetailsTony Young
STEVE Phone #: ###-####,, frame conf.. up stairs
BLD-Other9/20/20129/21/20129/21/2012PPASS
DetailsJim Sly
sub floor insp//Steve Phone #: ###-####
Framing for 2nd story .....floor OK.
Routing Walk-In (BLD)7/16/20127/16/20127/16/2012PDONE
DetailsPerry Paine
Plan assigned to (PEP)7/16/20127/16/20127/16/2012 PASS
DetailsPerry Paine
1st review completed  7/16/2012 DONE
PLANS/APPL TAKEN TO FRONT DESK  7/16/2012 DONE
Case Summary (BLD)  7/16/2012  
Inspection Record Card- Bld  7/16/2012  
Permit Ready to Issue  7/16/2012 DONE
Issue PAID IN FULL permit  7/16/2012 DONE
DetailsAlexandra L. DeYoung
Routing Walk-In (Zoning)7/13/20127/13/20127/13/2012PPASS
DetailsMatthew A Halitsky
Application received 7/13/2012