First Notice | | 5/3/2013 | 7/2/2015 | | DONE |
|
|
|
This permit finaled on the web by Jeremy Amar
|
Zoning Approval | 4/23/2013 | 4/23/2013 | 4/23/2013 | | PASS |
Josh Wilson
|
|
|
|
Permanent Occupancy | | | 4/23/2013 | | DONE |
Barbara Stitt
|
|
|
|
Telephone call | | | 2/25/2013 | | DONE |
Tisha Gallop
|
|
|
Per phone call from Kristi Heller at ACHD inspection completed and ok for perm occupancy//2/25/13 leg
|
FIRE-Final Inspection | 2/22/2013 | 2/22/2013 | 2/22/2013 | P | PASS |
Jim Sly
|
|
|
*Re-assigned by Scott Arellano due to personnel absence*
Pat Phone #: ###-#### Knox box installed.
|
BLD-Final | 2/14/2013 | 2/15/2013 | 2/15/2013 | A | PART |
Jim Sly
|
|
|
Pat please call 30 min before going out so he can unlock the door Phone #: ###-#### OK for Temp Occ. OK for Perm Occ. when Zoning perms.
|
Print Occupancy Form | | | 2/15/2013 | | DONE |
Tisha Gallop
|
|
|
|
Zoning Approval Temp | 2/14/2013 | 2/14/2013 | 2/14/2013 | | PASS |
Josh Wilson
|
|
|
180 day temp occ for completion of landscaping and parking lot striping. Bond received 2-14-13.
|
FIRE-Final Inspection | 2/12/2013 | 2/12/2013 | 2/12/2013 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed. Pat is waiting for the uniformed fire inspector to locate the knox box for him and is not currently mounted.
|
FIRE-Conference | 1/15/2013 | 1/15/2013 | 1/15/2013 | P | DONE |
Troy Cobbley
|
|
|
Sprinkler piping is ok to cover. Tag on window
|
BLD-Other | 12/28/2012 | 12/28/2012 | 12/28/2012 | P | PASS |
Jim Sly
|
|
|
pat late as possible Phone #: ###-#### 1st layer of rock and R C channel on Lid.......OK.
|
Override - Parcel Holds | 12/28/2012 | 1/1/1900 | 12/28/2012 | | |
|
|
|
this is for a building inspection only
|
BLD-Energy code compliance | 12/27/2012 | 12/27/2012 | 12/27/2012 | P | PASS |
Jim Sly
|
|
|
pat Phone #: ###-####
|
BLD-Framing/Rough-in | 12/21/2012 | 12/21/2012 | 12/24/2012 | P | PART |
Jim Sly
|
|
|
Pat Phone #: ###-#### OK to cover 1st layer Rock.........
|
Override - Parcel Holds | 12/21/2012 | 1/1/1900 | 12/21/2012 | | |
|
|
|
This is for the building permit
|
FIRE-Conference | 12/5/2012 | 12/5/2012 | 12/5/2012 | P | DONE |
Troy Cobbley
|
|
|
I posted a stop work order due to the installation of a fire alarm system without a permit. Electrician verified wire is fire alarm. There is no attached FIR or one to be found under a parcel search. I verified with plan review as well. I left message for the builder, Pat, at ###-####. Pictures of the work including the posted stop work order to the fire alarm plans examiner.
|
BLD-Wall Bracing | 11/27/2012 | 11/27/2012 | 11/27/2012 | P | PASS |
Jim Sly
|
|
|
Pat please call 1 hr before going out Phone #: ###-####
|
BLD-Framing/Rough-in | 11/21/2012 | 11/23/2012 | 11/23/2012 | A | NR |
Jim Sly
|
|
|
SHear inspection-Pat Phone #: ###-#### C/N .....Contractor to acertain that shear insp is ready before calling. Missed nailing, blocking, straps, Etc.
|
CHANGE STATUS TO (ISS) | | | 11/21/2012 | | DONE |
Barbara Stitt
|
|
|
|
(F) Reprint permit | | | 11/21/2012 | | DONE |
Barbara Stitt
|
|
|
|
Plan assigned to (SRZ) | 11/14/2012 | 11/14/2012 | 11/19/2012 | | PASS |
Sam Zahorka
|
|
|
|
Routing - PLAN CHECK | 11/14/2012 | | 11/19/2012 | | PASS |
Sam Zahorka
|
|
|
|
Inspection Record Card- Bld | | | 11/19/2012 | | DONE |
Christina Prado
|
|
|
|
Telephone call | | | 11/19/2012 | | DONE |
Christina Prado
|
|
|
left message with Angie at Biltmore giving fees due
|
Plan Modification Accepted | | | 11/14/2012 | | DONE |
Christina Prado
|
|
|
Plan Modification for the removal of sheetrock from corridor along with the front door ratings and to change the downstairs patio door from a single door to a glass slider. Sheets affected are S-1.8 & A-106. For inspections related to these changes see Sam Z.
|
BLD-Foundation | 10/18/2012 | 10/19/2012 | 10/20/2012 | P | PASS |
Jim Sly
|
|
|
found wall//Pat Phone #: ###-####
|
BLD-Footing | 10/18/2012 | 10/18/2012 | 10/18/2012 | P | PART |
Jim Sly
|
|
|
Pat Phone #: ###-#### Appears OK. Unable to determine exact setbacks....No string lines pulled.
|
Issue PAID IN FULL permit | | | 9/17/2012 | | DONE |
Barbara Stitt
|
|
|
|
Route to Impact Fee Review | 9/14/2012 | 9/19/2012 | 9/14/2012 | | PASS |
Shauna Surgeon
|
|
|
|
Inspection Record Card- Bld | | | 9/14/2012 | | DONE |
Christina Prado
|
|
|
|
Permit Ready to Issue | | | 9/14/2012 | | |
|
|
|
|
Telephone call | | | 9/14/2012 | | |
|
|
|
9-14-12 called Kevin permit ready and fee given ///dld
|
Routing - PUBLIC WORKS | 9/11/2012 | | 9/13/2012 | | PASS |
Connie Baumgartner
|
|
|
|
Routing PW Sewer Design | 9/12/2012 | | 9/13/2012 | | PASS |
Mike Sheppard
|
|
|
|
Routing - PLAN CHECK | 9/13/2012 | | 9/13/2012 | | PASS |
Sam Zahorka
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/13/2012 | | DONE |
Sam Zahorka
|
|
|
|
Plan assigned to (SRZ) | 7/19/2012 | | 9/13/2012 | | PASS |
Sam Zahorka
|
|
|
Pending Public Works to PASS.
|
Routing - PLAN CHECK | 8/28/2012 | | 9/11/2012 | | PEND |
Sam Zahorka
|
|
|
Pending PW to pass.
|
Plan resubmittals received | | | 8/28/2012 | | DONE |
Tisha Gallop
|
|
|
received two copies of plan sheet A102; inserted by GC and taken back to Sam Z.
|
Routing - PUBLIC WORKS | 8/24/2012 | | 8/28/2012 | | FAIL |
Connie Baumgartner
|
|
|
Failed by Mike Sheppard for sewer design issues.
|
Routing PW Sewer Design | 8/24/2012 | | 8/27/2012 | | FAIL |
Mike Sheppard
|
|
|
Revise sewer service connections
|
Routing PW Solid Waste | 8/24/2012 | | 8/24/2012 | | PASS |
Peter J. McCullough
|
|
|
|
Routing - PLAN CHECK | 8/22/2012 | | 8/24/2012 | | PASS |
Sam Zahorka
|
|
|
|
1st review completed | | | 8/22/2012 | | FAIL |
|
|
|
Failed Pulblic Works
|
Routing - FIRE | 8/20/2012 | | 8/22/2012 | | PASS |
Scott Arellano
|
|
|
Attached review comments to plans.
|
Routing - PLAN CHECK | 8/1/2012 | | 8/20/2012 | | PASS |
Sam Zahorka
|
|
|
Sam Zahorka
|
Routing - MECHANICAL | 8/6/2012 | | 8/6/2012 | | PASS |
Troy James
|
|
|
|
Routing - MECHANICAL | 7/31/2012 | | 8/1/2012 | | FAIL |
Troy James
|
|
|
talked to alley air about corrections
|
Routing - PLANNING | 7/27/2012 | | 7/30/2012 | | PASS |
Josh Wilson
|
|
|
Ok with redlines sheets A104, A104., A104.2, A201, A202
|
Routing - PLUMBING | 7/26/2012 | | 7/27/2012 | | PASS |
Daryl Spivey
|
|
|
Each building is required to have a DVVA backflow instaleed on water service line.
Per 2003 UPC.
|
Routing - Erosion and Sediment | 7/25/2012 | | 7/26/2012 | | PASS |
Clint A Smith
|
|
|
Approved per conditions and redlines
|
Routing - PUBLIC WORKS | 7/24/2012 | | 7/25/2012 | | FAIL |
Connie Baumgartner
|
|
|
Failed by Pamella Williams for trash enclosure issues
|
Routing PW Solid Waste | 7/24/2012 | | 7/25/2012 | | FAIL |
Pam Baldwin
|
|
|
Trash enclosure detail is required, including dimensions, orientation, wind stops, gate opening.
|
Routing PW Drainage | 7/24/2012 | | 7/24/2012 | | PASS |
Brian Murphy
|
|
|
|
Routing - Addressing | 7/23/2012 | | 7/23/2012 | | PASS |
April Wing
|
|
|
Ste# per bldgs see documents
|
Routing - PLANNING Land Div | 7/19/2012 | | 7/20/2012 | | PASS |
Dave Abo
|
|
|
Lot 25 of Clover Leaf Subdivision.
|
Application received | | 7/19/2012 | 7/19/2012 | | DONE |
Barbara Stitt
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 7/19/2012 | | DONE |
Barbara Stitt
|
|
|
|
Intake Approval | | | 7/19/2012 | | PASS |
Sam Zahorka
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 7/19/2012 | | DONE |
Barbara Stitt
|
|
|
|
Pending Assignment by JCM | 7/19/2012 | | 7/19/2012 | | DONE |
John Menard
|
|
|
|
Temporary Occupancy | 2/15/2013 | 11/16/2013 | | | |
|
|
|
180 day temp per Josh Wilson
|