Print Statement | | | 6/18/2015 | | DONE |
Rita DeYoung
|
|
|
|
(F) Reprint permit | | | 6/18/2015 | | DONE |
|
|
|
|
Print Statement | | | 12/15/2014 | | DONE |
Candy A. Nichols
|
|
|
|
Telephone call | | | 12/11/2014 | | DONE |
Candy A. Nichols
|
|
|
called Brian about 2nd value, he will resend correct values. He thinks he added to fees together so will send the correction
|
Second Notice | | 11/13/2014 | 12/1/2014 | | DONE |
Christina Prado
|
|
|
|
First Notice | | 10/13/2014 | 11/3/2014 | | DONE |
|
|
|
|
Permanent Occupancy | | | 10/3/2014 | | DONE |
Candy A. Nichols
|
|
|
|
BLD-Final | 9/30/2014 | 10/1/2014 | 10/1/2014 | A | PASS |
Mike Jordan
|
|
|
Brad Turk. Around 10:00am would be great. Phone #: ###-#### Inspection requested via web by Brad Turk. Ok for perm occ.
|
FIRE-Final Inspection | 9/29/2014 | 9/30/2014 | 9/30/2014 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
Zoning Approval | 9/29/2014 | 9/29/2014 | 9/29/2014 | | PASS |
Josh Wilson
|
|
|
|
FIRE-Final Inspection | 9/25/2014 | 9/25/2014 | 9/25/2014 | P | FAIL |
Troy Cobbley
|
|
|
Inspection was actually a conference with Brad Turk to go over the remaining life safety items prior to a final sign off on this permit. Looks like we just need fire alarm as-builts and an RFI for deletion of the exits out of the north side of the emergency rooms.
|
PubWorks Occupancy Approval | 9/25/2014 | 9/25/2014 | 9/25/2014 | | DONE |
Lori Flook
|
|
|
Brian Murphy inspected. Grades only. Occupancy cards signed.
|
BLD-Final | 6/30/2014 | 7/2/2014 | 7/2/2014 | A | PART |
Mike Jordan
|
|
|
Jim Martin Phone #: ###-#### Inspection requested via web by Brad Turk. Phase 3 ok to occupy.
|
FIRE-Final Inspection | 7/2/2014 | 7/2/2014 | 7/2/2014 | A | PART |
Troy Cobbley
|
|
|
Phase III (Med. Room/Lab) Life safety passed.
|
FIRE-Final Inspection | 6/30/2014 | 7/1/2014 | 7/1/2014 | A | CANC |
Troy Cobbley
|
|
|
Not ready for life safety
|
BLD-Ceiling Grid Inspection | 6/23/2014 | 6/23/2014 | 6/23/2014 | P | PASS |
Tom Arcoraci
|
|
|
emerg phase 3 ok
|
BLD-Final | 6/19/2014 | 6/23/2014 | 6/23/2014 | A | CANC |
Tom Arcoraci
|
|
|
Jim Martin. After 10:00am would be great. Phone #: ###-#### >> Inspection requested via web by Brad Turk
|
FIRE-Final Inspection | 5/14/2014 | 5/14/2014 | 5/14/2014 | P | PART |
Troy Cobbley
|
|
|
Life safety passed in the temporary corridor and trauma area of the remodeled ER.
|
BLD-Final | 5/12/2014 | 5/12/2014 | 5/12/2014 | A | PART |
Tom Arcoraci
|
|
|
Jim Martin Phone #: ###-#### >> Inspection requested via web by Brad Turk trauma area wip ok
|
BLD-Conference | 4/9/2014 | 4/9/2014 | 4/9/2014 | P | PASS |
Tom Arcoraci
|
|
|
Jim Martin Phone #: ###-#### >> Inspection requested via web by Brad Turk wip ok
|
FIRE-Conference | 4/8/2014 | 4/8/2014 | 4/9/2014 | P | DONE |
Troy Cobbley
|
|
|
Spoke about fire/smoke dampers and door hardware.
|
FIRE-Conference | 3/27/2014 | 3/27/2014 | 3/27/2014 | P | DONE |
Troy Cobbley
|
|
|
brad turk and I discussed existing
|
BLD-Framing/Rough-in | 3/13/2014 | 3/17/2014 | 3/17/2014 | A | PASS |
Tom Arcoraci
|
|
|
Jim Martin Phone #: ###-#### >> Inspection requested via web by Brad Turk wip ok for temp corridor
|
FIRE-Final Inspection | 2/4/2014 | 2/5/2014 | 2/5/2014 | P | PART |
Forrest France
|
|
|
Fire life safety at the temporary storage room and soiled holding room passed inspection.
|
BLD-Final | 2/4/2014 | 2/4/2014 | 2/4/2014 | P | PASS |
Tom Arcoraci
|
|
|
Final for Temp Soiled/ Storage. Jim MArtin Phone #: ###-#### >> Inspection requested via web by Brad Turk
|
BLD-Framing/Rough-in | 1/17/2014 | 1/21/2014 | 1/21/2014 | A | PASS |
Tom Arcoraci
|
|
|
Jim Martin Phone #: ###-#### >> Inspection requested via web by Brad Turk
|
Print Occupancy Form | | | 1/16/2014 | | DONE |
Tisha Gallop
|
|
|
|
CHANGE STATUS TO (ISS) | | | 1/16/2014 | | DONE |
Tisha Gallop
|
|
|
paid for plan mod
|
Routing - FIRE | 1/6/2014 | 1/6/2014 | 1/9/2014 | | PASS |
Scott Arellano
|
|
|
Mod pass with no corections. 1 hr review time
|
Plan assigned to (CJW) | 1/6/2014 | 1/6/2014 | 1/9/2014 | | PASS |
Carl Westfall
|
|
|
ST ALPHONSUS EMERGENCY DEPARTMENT - Plan Mod - ePlanReview
|
Routing - PLAN CHECK | 1/6/2014 | | 1/9/2014 | | PASS |
Carl Westfall
|
|
|
Plan mod approved. 3 hrs review time.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/9/2014 | | DONE |
|
|
|
|
Pending Assignment by JCB | 1/3/2014 | | 1/6/2014 | | DONE |
Jason Blais
|
|
|
Submitted on a Friday. Assigned on a Monday.
|
Plan resubmittals received | | | 1/3/2014 | | DONE |
|
|
|
Jake Salinas uploaded revised drawings.
|
Plan Modification Accepted | | | 12/30/2013 | | DONE |
|
|
|
started workflow
|
FIRE-Final Inspection | 12/26/2013 | 12/27/2013 | 12/27/2013 | A | PART |
Troy Cobbley
|
|
|
Life safety in 2B and Staff Lounge passed.
|
BLD-Final | 12/26/2013 | 12/27/2013 | 12/27/2013 | P | PASS |
Tom Arcoraci
|
|
|
Jim Martin Phone #: ###-#### >> Inspection requested via web by Brad Turk 2b and staff room ok
|
BLD-Ceiling Grid Inspection | 12/19/2013 | 12/20/2013 | 12/20/2013 | A | DONE |
Tom Arcoraci
|
|
|
|
BLD-Ceiling Grid Inspection | 12/18/2013 | 12/19/2013 | 12/19/2013 | P | PASS |
Tom Arcoraci
|
|
|
Jim Martin. Phase 2B and ER staff lounge. Phone #: ###-#### >> Inspection requested via web by Brad Turk
|
BLD-Conference | 12/13/2013 | 12/13/2013 | 12/13/2013 | P | PASS |
Tom Arcoraci
|
|
|
Jim Martin Phone #: ###-#### >> Inspection requested via web by Brad Turk
|
BLD-Wall cover | 11/18/2013 | 11/18/2013 | 11/18/2013 | P | PASS |
Tom Arcoraci
|
|
|
Jim Martin Phone #: ###-#### >> Inspection requested via web by Brad Turk
|
BLD-Framing/Rough-in | 11/5/2013 | 11/6/2013 | 11/6/2013 | A | PASS |
Tom Arcoraci
|
|
|
Jim Martin Phone #: ###-#### >> Inspection requested via web by Brad Turk
|
BLD-Final | 9/20/2013 | 9/23/2013 | 9/23/2013 | A | PASS |
Tom Arcoraci
|
|
|
Tom. Fire Final will be completed at 8:00am on Monday,9/23/13. Any time after that would be great. Brad Turk. ###-#### Phone #: ###-#### >> Inspection requested via web by Brad Turk PHASE 2A OK
|
FIRE-Final Inspection | 9/20/2013 | 9/23/2013 | 9/23/2013 | A | PASS |
Troy Cobbley
|
|
|
Area 2A life safety passed.
|
BLD-Ceiling Grid Inspection | 9/3/2013 | 9/4/2013 | 9/4/2013 | P | PASS |
Tom Arcoraci
|
|
|
Jim Martin ###-#### Phone #: ###-#### >> Inspection requested via web by Brad Turk
|
BLD-Framing/Rough-in | 7/9/2013 | 7/10/2013 | 7/10/2013 | A | PART |
Tom Arcoraci
|
|
|
Jim Martin ###-#### Phone #: ###-#### >> Inspection requested via web by Brad Turk phase 2 ok
|
BLD-Framing/Rough-in | 6/28/2013 | 7/1/2013 | 7/1/2013 | A | PASS |
Jim Storey
|
|
|
Jim Martin ###-#### Phone #: ###-#### >> Inspection requested via web by Brad Turk t line north framing ok
|
BLD-Conference | 6/24/2013 | 6/24/2013 | 6/24/2013 | P | PASS |
Tom Arcoraci
|
|
|
Wall cover for Phase 2A. Jim Martin ###-####. Phone #: ###-#### >> Inspection requested via web by Brad Turk
|
BLD-Foundation | 5/6/2013 | 5/6/2013 | 5/6/2013 | P | PASS |
Tom Arcoraci
|
|
|
We would like to have a 1:30 inspection. St Al''s ED Expansion. Jim Martin. ###-#### Phone #: ###-#### >> Inspection requested via web by Brad Turk si on site
|
FIRE-Conference | 3/18/2013 | 3/18/2013 | 3/18/2013 | P | DONE |
Troy Cobbley
|
|
|
Brad and I went over fire alarm in phase two waiting area.
|
FIRE-Final Inspection | 3/8/2013 | 3/8/2013 | 3/8/2013 | A | PART |
Troy Cobbley
|
|
|
Phase one life safety passed.
|
BLD-Final | 3/6/2013 | 3/7/2013 | 3/7/2013 | P | PART |
Tom Arcoraci
|
|
|
Jim Martin ###-#### >> Inspection requested via web by Brad Turk phase one ok for final
|
FIRE-Final Inspection | 3/6/2013 | 3/7/2013 | 3/7/2013 | A | FAIL |
Troy Cobbley
|
|
|
Inspection was for a conference not a final inspection. Building confrence on fire life satety Phase 1. Jim Martin ###-#### >> Inspection requested via web by Brad Turk
|
FIRE-Final Inspection | 3/6/2013 | 3/7/2013 | 3/6/2013 | P | CANC |
Troy Cobbley
|
|
|
Building confrence for phasing structure of building permit and Life Safety. Contact Jim Martin ###-#### >> Inspection requested via web by Brad Turk Inspection cancelled from web by: Brad Turk
|
BLD-Conference | 2/25/2013 | 2/25/2013 | 2/25/2013 | P | PASS |
Tom Arcoraci
|
|
|
If we could have you come out at 12:45 or 1:00 today, we would like to do a walk through of existing corridor and new addition. Please contact Jim Martin. ###-####. Phone #: ###-#### >> Inspection requested via web by Brad Turk
|
BLD-Wall cover | 1/24/2013 | 1/25/2013 | 1/25/2013 | P | PASS |
Tom Arcoraci
|
|
|
This will be for the North side of St.Al''s ED expansion. Friday at 1:00pm would work great. Thanks Jim Martin ###-#### Phone #: ###-#### >> Inspection requested via web by Brad Turk
|
BLD-Framing/Rough-in | 1/9/2013 | 1/10/2013 | 1/10/2013 | A | PASS |
Tom Arcoraci
|
|
|
Please contact Jim Martin with question or concerns: ###-#### Phone #: ###-#### >> Inspection requested via web by Brad Turk wip ok for cover
|
BLD-Framing/Rough-in | 1/4/2013 | 1/4/2013 | 1/4/2013 | P | CANC |
Tom Arcoraci
|
|
|
|
BLD-Framing/Rough-in | 1/2/2013 | 1/2/2013 | 1/2/2013 | A | PART |
Tom Arcoraci
|
|
|
Jim Martin Phone #: ###-#### >> Inspection requested via web by Brad Turk wip ok
|
BLD-Conference | 12/14/2012 | 12/17/2012 | 12/24/2012 | A | PASS |
Tony Young
|
|
|
We would like this to be around 11:00am if possible. This will be a walk through of the project as to where we are at and direction we are going. Thanks Jim Martin ###-#### Phone #: ###-#### >> Inspection requested via web by Brad Turk upper areas on walls ok to cover,, ok to put on 2nd layers in other areas as needed
|
BLD-Concrete | 11/15/2012 | 11/16/2012 | 11/16/2012 | P | PASS |
Tom Arcoraci
|
|
|
Pouring at 2 Rebar - Micah Phone #: ###-####
|
BLD-Conference | 10/26/2012 | 10/26/2012 | 10/26/2012 | P | PASS |
Tom Arcoraci
|
|
|
|
BLD-Wall cover | 10/24/2012 | 10/25/2012 | 10/25/2012 | A | PASS |
Tom Arcoraci
|
|
|
Phone #: 2085735147 >> Inspection requested via mobile web by Jim Martin 2 hr wall wip ok
|
Issue PAID IN FULL permit | | | 10/15/2012 | | DONE |
Tisha Gallop
|
|
|
|
Print Occupancy Form | | | 10/15/2012 | | DONE |
Tisha Gallop
|
|
|
|
Permit Ready to Issue | | | 10/2/2012 | | DONE |
Barbara Stitt
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/1/2012 | | DONE |
|
|
|
|
Routing Off Site - STRUCTURAL | 9/24/2012 | | 10/1/2012 | | PASS |
Carl Westfall
|
|
|
Consultant Structural Engineer
|
Plan assigned to (CJW) | 7/27/2012 | | 10/1/2012 | | PASS |
Carl Westfall
|
|
|
ST ALPHONSUS EMERGENCY DEPARTMENT RENOVATION AND EXPANSION (20 days - Aug. 21) ePlanReview
|
Routing - PLAN CHECK | 9/24/2012 | | 10/1/2012 | | PASS |
Carl Westfall
|
|
|
All other agencies have approved.
|
Route to Impact Fee Review | 9/24/2012 | 9/27/2012 | 9/28/2012 | | PASS |
Cindy M. Gould
|
|
|
|
Routing - PLUMBING | 9/24/2012 | | 9/27/2012 | | PASS |
Bill VanDegrift
|
|
|
|
Routing - Erosion and Sediment | 9/24/2012 | | 9/26/2012 | | PASS |
Kimberly M. Johnson
|
|
|
|
Routing PW Sewer Rating | 9/24/2012 | | 9/25/2012 | | PASS |
|
|
|
Drinking fountains provided
|
Routing - PLAN CHECK | 9/14/2012 | | 9/24/2012 | | PASS |
Carl Westfall
|
|
|
Took more than 10 hours to do the resubmittal review. Several new sheets had to be renamed so that they would "version" properly. Several sheets had to be re-oriented so that they could be compared with earlier versions. This had to be done before routing to other agencies so that they could view and compare the sheets properly. Did not want to risk other agencies adding notes to sheets that were not oritented properly. CJW
|
Routing PW Environmental | 9/24/2012 | | 9/24/2012 | | PASS |
Walt Baumgartner
|
|
|
Decon station routes to underground 1500 blind vault for containment. St Als sanitary sewer serviced by Bench Sewer District.
|
Plan resubmittals received | | | 9/14/2012 | | DONE |
|
|
|
|
1st review completed | | | 8/29/2012 | | FAIL |
|
|
|
Did not pass Building, structural, ESC, and plumbing
|
Routing - PLAN CHECK | 7/27/2012 | | 8/29/2012 | | FAIL |
Carl Westfall
|
|
|
The IBC plan review was started on Aug 18 and was finished on Aug 29. Revised drawings were required. See the plan review report.
|
Routing Off Site - STRUCTURAL | 7/27/2012 | | 8/8/2012 | | FAIL |
|
|
|
Jan Welch
|
Routing - FIRE | 7/27/2012 | | 8/7/2012 | | PASS |
Scott Arellano
|
|
|
Attached review comments to plans.
|
Telephone call | | | 8/7/2012 | | DONE |
Kimberly M. Johnson
|
|
|
Spoke with PD about resubmittal requirements
|
Routing - PLUMBING | 7/27/2012 | | 8/6/2012 | | FAIL |
Bill VanDegrift
|
|
|
1)show loading on the medical gas and vacuum system, existing and new
2)additional cross connection protection may be required.
|
Routing - Erosion and Sediment | 7/27/2012 | | 7/30/2012 | | FAIL |
Kimberly M. Johnson
|
|
|
Narrative redlines. Requested updates to ESC drawings via E-Plan review
|
Routing PW Sewer Rating | 7/27/2012 | | 7/30/2012 | | PASS |
Beverly Mountain
|
|
|
|
Routing PW Drainage | 7/27/2012 | | 7/30/2012 | | PASS |
Brian Murphy
|
|
|
|
Routing - PUBLIC WORKS | 7/30/2012 | | 7/30/2012 | | PASS |
Beverly Mountain
|
|
|
|
Routing - Addressing | 7/27/2012 | | 7/27/2012 | | PASS |
April Wing
|
|
|
|
Plan Reviewer's activity | | | 7/27/2012 | | DONE |
|
|
|
Assigned reviewers. Starte routing in ePlan.
|
Routing - Design Review | 7/27/2012 | | 7/27/2012 | | PASS |
Andrea Tuning
|
|
|
|
Intake Approval | | | 7/25/2012 | | PASS |
|
|
|
|
Application received | | | 7/19/2012 | | DONE |
|
|
|
Application submitted via PDS Online on Jul 19 2012 2:32PM
|