Permit Information
Permit NumberBLD12-01914
StatusFinaled
Name ANDERSEN CONSTRUCTION CO
Site Address 1055 N CURTIS RD
Project NameSARMC - ED RENOVATION / EXPANS
Customer Number 
ePlanReviewYes
Description
(ST. ALPHONSUS EMERGENCY DEPARTMENT RENOVATION AND EXPANSION) (1-9-14 PLAN MODIFICATION TO CONSTRUCT A TEMPORARY 242 SQUARE FOOT STORAGE ROOM AND A TEMPORARY 94 SQUARE FOOT SOILED HOLDING ROOM. THE SOILED HOLDING ROOM WILL HAVE DIRECT ACCESS TO AN EXISTING EXIT PASSAGEWAY THAT FUNCTIONS AS THE EXTENSION OF A STAIRWAY ENCLOSURE. THE 90 MINUTE DOOR IS REQUIRED TO BE AUTOMATIC CLOSING BY THE ACTUATION OF SMOKE DETECTORS. THE DOOR TO THE EXIT PASSAGEWAY WILL BE REMOVED AND THE EXIT PASSAGEWAY WALL RESTORED TO ITS FORMER CONDITION WITHIN 60 DAYS AFTER COMPLETION OF THE EMERGENCY DEPARTMENT RENOVATION AND EXPANSION. THE STORAGE ROOM AND THE SOILED HOLDING ROOM WILL THEN BE COMBINED TO BECOME A 336 SQUARE FOOT STORAGE ROOM WITHOUT DIRECT ACCESS TO THE EXIT PASSAGEWAY.) The fire sprinkler system is required for occupancy and high-rise. To enlarge the existing Emergency Department at St. Alphonsus Hospital by constructing a 652 square foot building addition, a 106 square foot building addition, a 522 square foot building addition, and by expanding into adjacent 3,336 square foot areas within the existing building or below the roof of the existing building. After the expansions, the Emergency Department will have a total floor area of about 19,986 square feet. In conjunction with the expansion, the entire Emergency Department will also be renovated. The renovation includes exam rooms, staff lounges, staff work areas, and a public waiting area. Two ER staff toilet/shower rooms, two ER Physicians toilet rooms, one ER Physician shower room, one ER toilet/shower room, five ER patient toilet rooms, and two ER public waiting area toilet rooms all accessible to the disabled will be provided. Work includes interior nonbearing walls, interior sliding doors, curtains, suspended acoustical ceilings, bullet-resistant fiberglass panels, millwork, equipment, finishes, smoke barrier walls and doors, smoke partitions and doors, exterior walls, exterior windows, and exterior screens for roof top mechanical equipment. Structural work includes concrete footings, concrete foundations, concrete slabs on grade, steel columns, steel beams, steel moment frames, metal pan deck, steel headers and jambs at new openings in concrete and masonry walls, etc. Special Inspection is required for steel, steel fabrication, bolting, welding, concrete, soils, epoxy anchors, Exterior Insulation and Finish Systems, and spray applied fire-proofing. The work is required to comply with the approved drawings, with the plan review report, with the structural design, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13 as regulated by the Fire Department. The fire alarm system is required to comply with NFPA 72 as regulated by the Fire Department. Analysis of the medical gas system is required before issuance of a Certificate of Occupancy. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Print Statement  6/18/2015 DONE
DetailsRita DeYoung
(F) Reprint permit  6/18/2015 DONE
Print Statement  12/15/2014 DONE
DetailsCandy A. Nichols
Telephone call  12/11/2014 DONE
DetailsCandy A. Nichols
called Brian about 2nd value, he will resend correct values. He thinks he added to fees together so will send the correction
Second Notice 11/13/201412/1/2014 DONE
DetailsChristina Prado
First Notice 10/13/201411/3/2014 DONE
Permanent Occupancy  10/3/2014 DONE
DetailsCandy A. Nichols
BLD-Final9/30/201410/1/201410/1/2014APASS
DetailsMike Jordan
Brad Turk. Around 10:00am would be great. Phone #: ###-#### Inspection requested via web by Brad Turk. Ok for perm occ.
FIRE-Final Inspection9/29/20149/30/20149/30/2014APASS
DetailsTroy Cobbley
Life safety passed
Zoning Approval9/29/20149/29/20149/29/2014 PASS
DetailsJosh Wilson
FIRE-Final Inspection9/25/20149/25/20149/25/2014PFAIL
DetailsTroy Cobbley
Inspection was actually a conference with Brad Turk to go over the remaining life safety items prior to a final sign off on this permit. Looks like we just need fire alarm as-builts and an RFI for deletion of the exits out of the north side of the emergency rooms.
PubWorks Occupancy Approval9/25/20149/25/20149/25/2014 DONE
DetailsLori Flook
Brian Murphy inspected. Grades only. Occupancy cards signed.
BLD-Final6/30/20147/2/20147/2/2014APART
DetailsMike Jordan
Jim Martin Phone #: ###-#### Inspection requested via web by Brad Turk. Phase 3 ok to occupy.
FIRE-Final Inspection7/2/20147/2/20147/2/2014APART
DetailsTroy Cobbley
Phase III (Med. Room/Lab) Life safety passed.
FIRE-Final Inspection6/30/20147/1/20147/1/2014ACANC
DetailsTroy Cobbley
Not ready for life safety
BLD-Ceiling Grid Inspection6/23/20146/23/20146/23/2014PPASS
DetailsTom Arcoraci
emerg phase 3 ok
BLD-Final6/19/20146/23/20146/23/2014ACANC
DetailsTom Arcoraci
Jim Martin. After 10:00am would be great. Phone #: ###-#### >> Inspection requested via web by Brad Turk
FIRE-Final Inspection5/14/20145/14/20145/14/2014PPART
DetailsTroy Cobbley
Life safety passed in the temporary corridor and trauma area of the remodeled ER.
BLD-Final5/12/20145/12/20145/12/2014APART
DetailsTom Arcoraci
Jim Martin Phone #: ###-#### >> Inspection requested via web by Brad Turk trauma area wip ok
BLD-Conference4/9/20144/9/20144/9/2014PPASS
DetailsTom Arcoraci
Jim Martin Phone #: ###-#### >> Inspection requested via web by Brad Turk wip ok
FIRE-Conference4/8/20144/8/20144/9/2014PDONE
DetailsTroy Cobbley
Spoke about fire/smoke dampers and door hardware.
FIRE-Conference3/27/20143/27/20143/27/2014PDONE
DetailsTroy Cobbley
brad turk and I discussed existing
BLD-Framing/Rough-in3/13/20143/17/20143/17/2014APASS
DetailsTom Arcoraci
Jim Martin Phone #: ###-#### >> Inspection requested via web by Brad Turk wip ok for temp corridor
FIRE-Final Inspection2/4/20142/5/20142/5/2014PPART
DetailsForrest France
Fire life safety at the temporary storage room and soiled holding room passed inspection.
BLD-Final2/4/20142/4/20142/4/2014PPASS
DetailsTom Arcoraci
Final for Temp Soiled/ Storage.
Jim MArtin Phone #: ###-#### >> Inspection requested via web by Brad Turk
BLD-Framing/Rough-in1/17/20141/21/20141/21/2014APASS
DetailsTom Arcoraci
Jim Martin Phone #: ###-#### >> Inspection requested via web by Brad Turk
Print Occupancy Form  1/16/2014 DONE
DetailsTisha Gallop
CHANGE STATUS TO (ISS)  1/16/2014 DONE
DetailsTisha Gallop
paid for plan mod
Routing - FIRE1/6/20141/6/20141/9/2014 PASS
DetailsScott Arellano
Mod pass with no corections. 1 hr review time
Plan assigned to (CJW)1/6/20141/6/20141/9/2014 PASS
DetailsCarl Westfall
ST ALPHONSUS EMERGENCY DEPARTMENT - Plan Mod - ePlanReview
Routing - PLAN CHECK1/6/2014 1/9/2014 PASS
DetailsCarl Westfall
Plan mod approved. 3 hrs review time.
PLANS/APPL TAKEN TO FRONT DESK  1/9/2014 DONE
Pending Assignment by JCB1/3/2014 1/6/2014 DONE
DetailsJason Blais
Submitted on a Friday. Assigned on a Monday.
Plan resubmittals received  1/3/2014 DONE
Jake Salinas uploaded revised drawings.
Plan Modification Accepted  12/30/2013 DONE
started workflow
FIRE-Final Inspection12/26/201312/27/201312/27/2013APART
DetailsTroy Cobbley
Life safety in 2B and Staff Lounge passed.
BLD-Final12/26/201312/27/201312/27/2013PPASS
DetailsTom Arcoraci
Jim Martin Phone #: ###-#### >> Inspection requested via web by Brad Turk 2b and staff room ok
BLD-Ceiling Grid Inspection12/19/201312/20/201312/20/2013ADONE
DetailsTom Arcoraci
BLD-Ceiling Grid Inspection12/18/201312/19/201312/19/2013PPASS
DetailsTom Arcoraci
Jim Martin. Phase 2B and ER staff lounge. Phone #: ###-#### >> Inspection requested via web by Brad Turk
BLD-Conference12/13/201312/13/201312/13/2013PPASS
DetailsTom Arcoraci
Jim Martin Phone #: ###-#### >> Inspection requested via web by Brad Turk
BLD-Wall cover11/18/201311/18/201311/18/2013PPASS
DetailsTom Arcoraci
Jim Martin Phone #: ###-#### >> Inspection requested via web by Brad Turk
BLD-Framing/Rough-in11/5/201311/6/201311/6/2013APASS
DetailsTom Arcoraci
Jim Martin Phone #: ###-#### >> Inspection requested via web by Brad Turk
BLD-Final9/20/20139/23/20139/23/2013APASS
DetailsTom Arcoraci
Tom. Fire Final will be completed at 8:00am on Monday,9/23/13. Any time after that would be great. Brad Turk. ###-#### Phone #: ###-#### >> Inspection requested via web by Brad Turk PHASE 2A OK
FIRE-Final Inspection9/20/20139/23/20139/23/2013APASS
DetailsTroy Cobbley
Area 2A life safety passed.
BLD-Ceiling Grid Inspection9/3/20139/4/20139/4/2013PPASS
DetailsTom Arcoraci
Jim Martin ###-#### Phone #: ###-#### >> Inspection requested via web by Brad Turk
BLD-Framing/Rough-in7/9/20137/10/20137/10/2013APART
DetailsTom Arcoraci
Jim Martin ###-#### Phone #: ###-#### >> Inspection requested via web by Brad Turk phase 2 ok
BLD-Framing/Rough-in6/28/20137/1/20137/1/2013APASS
DetailsJim Storey
Jim Martin ###-#### Phone #: ###-#### >> Inspection requested via web by Brad Turk t line north framing ok
BLD-Conference6/24/20136/24/20136/24/2013PPASS
DetailsTom Arcoraci
Wall cover for Phase 2A. Jim Martin ###-####.
Phone #: ###-#### >> Inspection requested via web by Brad Turk
BLD-Foundation5/6/20135/6/20135/6/2013PPASS
DetailsTom Arcoraci
We would like to have a 1:30 inspection. St Al''s ED Expansion.
Jim Martin. ###-#### Phone #: ###-#### >> Inspection requested via web by Brad Turk si on site
FIRE-Conference3/18/20133/18/20133/18/2013PDONE
DetailsTroy Cobbley
Brad and I went over fire alarm in phase two waiting area.
FIRE-Final Inspection3/8/20133/8/20133/8/2013APART
DetailsTroy Cobbley
Phase one life safety passed.
BLD-Final3/6/20133/7/20133/7/2013PPART
DetailsTom Arcoraci
Jim Martin ###-#### >> Inspection requested via web by Brad Turk phase one ok for final
FIRE-Final Inspection3/6/20133/7/20133/7/2013AFAIL
DetailsTroy Cobbley
Inspection was for a conference not a final inspection. Building confrence on fire life satety Phase 1.
Jim Martin ###-#### >> Inspection requested via web by Brad Turk
FIRE-Final Inspection3/6/20133/7/20133/6/2013PCANC
DetailsTroy Cobbley
Building confrence for phasing structure of building permit and Life Safety.
Contact Jim Martin ###-####
>> Inspection requested via web by Brad Turk Inspection cancelled from web by: Brad Turk
BLD-Conference2/25/20132/25/20132/25/2013PPASS
DetailsTom Arcoraci
If we could have you come out at 12:45 or 1:00 today, we would like to do a walk through of existing corridor and new addition. Please contact Jim Martin. ###-####. Phone #: ###-#### >> Inspection requested via web by Brad Turk
BLD-Wall cover1/24/20131/25/20131/25/2013PPASS
DetailsTom Arcoraci
This will be for the North side of St.Al''s ED expansion. Friday at 1:00pm would work great.
Thanks Jim Martin ###-#### Phone #: ###-#### >> Inspection requested via web by Brad Turk
BLD-Framing/Rough-in1/9/20131/10/20131/10/2013APASS
DetailsTom Arcoraci
Please contact Jim Martin with question or concerns: ###-#### Phone #: ###-#### >> Inspection requested via web by Brad Turk wip ok for cover
BLD-Framing/Rough-in1/4/20131/4/20131/4/2013PCANC
DetailsTom Arcoraci
BLD-Framing/Rough-in1/2/20131/2/20131/2/2013APART
DetailsTom Arcoraci
Jim Martin Phone #: ###-#### >> Inspection requested via web by Brad Turk wip ok
BLD-Conference12/14/201212/17/201212/24/2012APASS
DetailsTony Young
We would like this to be around 11:00am if possible. This will be a walk through of the project as to where we are at and direction we are going.
Thanks Jim Martin ###-#### Phone #: ###-#### >> Inspection requested via web by Brad Turk
upper areas on walls ok to cover,, ok to put on 2nd layers in other areas as needed
BLD-Concrete11/15/201211/16/201211/16/2012PPASS
DetailsTom Arcoraci
Pouring at 2 Rebar - Micah Phone #: ###-####
BLD-Conference10/26/201210/26/201210/26/2012PPASS
DetailsTom Arcoraci
BLD-Wall cover10/24/201210/25/201210/25/2012APASS
DetailsTom Arcoraci
Phone #: 2085735147 >> Inspection requested via mobile web by Jim Martin 2 hr wall wip ok
Issue PAID IN FULL permit  10/15/2012 DONE
DetailsTisha Gallop
Print Occupancy Form  10/15/2012 DONE
DetailsTisha Gallop
Permit Ready to Issue  10/2/2012 DONE
DetailsBarbara Stitt
PLANS/APPL TAKEN TO FRONT DESK  10/1/2012 DONE
Routing Off Site - STRUCTURAL9/24/2012 10/1/2012 PASS
DetailsCarl Westfall
Consultant Structural Engineer
Plan assigned to (CJW)7/27/2012 10/1/2012 PASS
DetailsCarl Westfall
ST ALPHONSUS EMERGENCY DEPARTMENT RENOVATION AND EXPANSION (20 days - Aug. 21) ePlanReview
Routing - PLAN CHECK9/24/2012 10/1/2012 PASS
DetailsCarl Westfall
All other agencies have approved.
Route to Impact Fee Review9/24/20129/27/20129/28/2012 PASS
DetailsCindy M. Gould
Routing - PLUMBING9/24/2012 9/27/2012 PASS
DetailsBill VanDegrift
Routing - Erosion and Sediment9/24/2012 9/26/2012 PASS
DetailsKimberly M. Johnson
Routing PW Sewer Rating9/24/2012 9/25/2012 PASS
Details
Drinking fountains provided
Routing - PLAN CHECK9/14/2012 9/24/2012 PASS
DetailsCarl Westfall
Took more than 10 hours to do the resubmittal review. Several new sheets had to be renamed so that they would "version" properly. Several sheets had to be re-oriented so that they could be compared with earlier versions. This had to be done before routing to other agencies so that they could view and compare the sheets properly. Did not want to risk other agencies adding notes to sheets that were not oritented properly. CJW
Routing PW Environmental9/24/2012 9/24/2012 PASS
DetailsWalt Baumgartner
Decon station routes to underground 1500 blind vault for containment. St Als sanitary sewer serviced by Bench Sewer District.
Plan resubmittals received  9/14/2012 DONE
1st review completed  8/29/2012 FAIL
Did not pass Building, structural, ESC, and plumbing
Routing - PLAN CHECK7/27/2012 8/29/2012 FAIL
DetailsCarl Westfall
The IBC plan review was started on Aug 18 and was finished on Aug 29. Revised drawings were required. See the plan review report.
Routing Off Site - STRUCTURAL7/27/2012 8/8/2012 FAIL
Jan Welch
Routing - FIRE7/27/2012 8/7/2012 PASS
DetailsScott Arellano
Attached review comments to plans.
Telephone call  8/7/2012 DONE
DetailsKimberly M. Johnson
Spoke with PD about resubmittal requirements
Routing - PLUMBING7/27/2012 8/6/2012 FAIL
DetailsBill VanDegrift
1)show loading on the medical gas and vacuum system, existing and new
2)additional cross connection protection may be required.
Routing - Erosion and Sediment7/27/2012 7/30/2012 FAIL
DetailsKimberly M. Johnson
Narrative redlines. Requested updates to ESC drawings via E-Plan review
Routing PW Sewer Rating7/27/2012 7/30/2012 PASS
DetailsBeverly Mountain
Routing PW Drainage7/27/2012 7/30/2012 PASS
DetailsBrian Murphy
Routing - PUBLIC WORKS7/30/2012 7/30/2012 PASS
DetailsBeverly Mountain
Routing - Addressing7/27/2012 7/27/2012 PASS
DetailsApril Wing
Plan Reviewer's activity  7/27/2012 DONE
Assigned reviewers. Starte routing in ePlan.
Routing - Design Review7/27/2012 7/27/2012 PASS
DetailsAndrea Tuning
Intake Approval  7/25/2012 PASS
Application received  7/19/2012 DONE
Application submitted via PDS Online on Jul 19 2012 2:32PM