Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD12-01950
StatusFinaled
Name ESI
Site Address 3305 N COLE RD
Project NameWalmart Neighborhood Market Ta
Customer Number 
ePlanReviewNo
Description
(WALMART Neighborhood Market – Cole Village Shopping Center) This building will be fire sprinklered for area increase under BLD12-01951. Permit is to remodel an existing 12,720 square foot mercantile tenant space. Work is to include: demolition of existing non-bearing partition walls, demolition of existing plumbing / electrical / mechanical, demolition of existing 2 hr. area separation wall between this tenant and adjacent, [construction of new: man door openings in west facing wall, steel post and beam construction in place of 2 hr area separation wall, and a raised floor slab (approximately 12 inches), removal of interior finishes, removal of all existing outlets and wiring back to the box or properly terminated above ceiling line, and interior finishes. This building is not fire sprinklered; however, this building is required to be sprinklered prior to any tenant occupying the building. **TLW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 7/7/20137/19/2013 DONE
Third Notice 6/8/20137/2/2013 DONE
mailed to ESI Attn: Mike Dahlberg
Second Notice 5/10/20136/3/2013 DONE
Faxed 6-3-13
First Notice3/25/20133/25/20134/30/2013 DONE
DetailsJim Sly
Faxed 4-30-13
BLD-Final3/25/20133/25/20133/25/2013PPASS
DetailsJim Sly
devon Phone #: ###-####
C/C issued.
DOC - Permit Finaled3/25/20133/25/20133/25/2013PPASS
DetailsJim Sly
BLD-Final3/12/20133/12/20133/12/2013PNR
DetailsJim Sly
Devon Phone #: ###-####
Talked to Devon. Need Plumbing final and final letter of approval from MTI......Stamped by Engineer of record..signed and dated. Need to verify if electrical needs to be finaled.......Not check marked on required signature list.
BLD-Other2/14/20132/14/20132/14/2013PPART
DetailsJim Sly
Columns - Devin Phone #: ###-####
Inspection of CMU installation above new steel columns and beams. Beam bolting connection to New CMU wall. Bolting attachment of ledger for roof support to CMU wall. OK Pending MTI inspection, report and approval.
BLD-Foundation1/3/20131/4/20131/4/2013ACANC
DetailsJim Sly
Beginning masonry foundation with rebar reinforcement for new fully grouted shear- wall along grid 9, between E.5 and G. MTI will be on site for continuous inspection- grout of masonry scheduled for 12 noon. Phone #: ###-#### >> Inspection requested via web by Philip Allen
OK pending MTI inspection, tests and approvals.
BLD-Footing12/27/201212/28/201212/28/2012APASS
DetailsJim Sly
Footing placement for new shearwall (20 yards)at 10:00AM.
MTI will be on site for visual inspection of six (6)embedded rebar with epoxy to tie in old footing, rebar placement for reinforcement, will collect cylinders for testing @ 10:00AM Phone #: ###-#### >> Inspection requested via web by Philip Allen
OK pending MTI inspection, tests and approvals.
BLD-Foundation12/19/201212/20/201212/20/2012APART
DetailsJim Sly
MTI also scheduled for inspection of rebar @ 8AM
Please call for timing. Phone #: ###-#### >> Inspection requested via web by Philip Allen
Front of Bldg. Footing tie into slab. OK pending MTI special insp. tests and approvals.
BLD-Footing12/6/201212/7/201212/7/2012PPASS
DetailsJim Sly
Embedded rebar with Epoxy for new column footing tie in along grid 9. Special inspection has been recorded- copies of special inspections are on site. Phone #: ###-#### >> Inspection requested via web by Philip Allen
OK pending MTI insp, tests and approvals.
BLD-Footing11/14/201211/15/201211/15/2012APART
DetailsJim Sly
Phone #: ###-#### >> Inspection requested via web by Philip Allen
Eastern most Column footing OK pending MTI insp, tests and approvals.
BLD-Footing11/13/201211/14/201211/14/2012PCANC
DetailsJim Sly
Phone #: ###-#### >> Inspection requested via web by Philip Allen Inspection cancelled from web by: Philip Allen
Issue PAID IN FULL permit  10/31/2012 DONE
OVERRIDE  8/9/2012  
Inspection Record Card- Bld  8/9/2012 DONE
DetailsChristina Prado
Telephone call  8/9/2012 DONE
LM for Kayo that permit is ready and to have GC contact us
Permit Ready to Issue  8/9/2012 DONE
Plan assigned to (TLW)7/25/2012 8/8/2012 PASS
DetailsTim L. Woodard
Routing - PLAN CHECK7/30/2012 8/8/2012 PASS
DetailsTim L. Woodard
Approved with report. TLW
1st review completed  8/8/2012 DONE
DetailsTim L. Woodard
PLANS/APPL TAKEN TO FRONT DESK  8/8/2012 DONE
DetailsTim L. Woodard
Case Summary (BLD)  8/8/2012 DONE
DetailsTim L. Woodard
Routing - Erosion and Sediment8/8/2012 8/8/2012 PASS
DetailsTim L. Woodard
Waiver request approved. Applicant must comply with the attached conditions. TLW
Routing - PLUMBING7/27/2012 7/30/2012 PASS
DetailsDaryl Spivey
1. 2 inch minimum pipe size below grade.
2. Per 2003 UPC.
Plan resubmittals received  7/27/2012 DONE
DetailsTisha Gallop
received esc waiver request letter via e-mail; put with plans.
Routing - PUBLIC WORKS7/27/2012 7/26/2012 PASS
DetailsConnie Baumgartner
Routing - Addressing7/26/2012 7/26/2012 PASS
DetailsTerry Records
Changed address and parcel #
Routing PW Sewer Rating7/26/2012 7/26/2012 PASS
DetailsConnie Baumgartner
Routing PW Environmental7/26/2012 7/26/2012 PASS
DetailsWalt Baumgartner
grease interceptor will be required for key area operations like deli, meat dept etc
Application received 7/24/20127/25/2012 DONE
DetailsTisha Gallop
Plans ACCEPTED BY PLAN TECH  7/25/2012 DONE
DetailsTisha Gallop
Recd Pcfee & Taken To Pln CK  7/24/2012 DONE
DetailsTisha Gallop