Third Notice | | 7/7/2013 | 7/19/2013 | | DONE |
|
|
|
|
Third Notice | | 6/8/2013 | 7/2/2013 | | DONE |
|
|
|
mailed to ESI Attn: Mike Dahlberg
|
Second Notice | | 5/10/2013 | 6/3/2013 | | DONE |
|
|
|
Faxed 6-3-13
|
First Notice | 3/25/2013 | 3/25/2013 | 4/30/2013 | | DONE |
Jim Sly
|
|
|
Faxed 4-30-13
|
BLD-Final | 3/25/2013 | 3/25/2013 | 3/25/2013 | P | PASS |
Jim Sly
|
|
|
devon Phone #: ###-#### C/C issued.
|
DOC - Permit Finaled | 3/25/2013 | 3/25/2013 | 3/25/2013 | P | PASS |
Jim Sly
|
|
|
|
BLD-Final | 3/12/2013 | 3/12/2013 | 3/12/2013 | P | NR |
Jim Sly
|
|
|
Devon Phone #: ###-#### Talked to Devon. Need Plumbing final and final letter of approval from MTI......Stamped by Engineer of record..signed and dated. Need to verify if electrical needs to be finaled.......Not check marked on required signature list.
|
BLD-Other | 2/14/2013 | 2/14/2013 | 2/14/2013 | P | PART |
Jim Sly
|
|
|
Columns - Devin Phone #: ###-#### Inspection of CMU installation above new steel columns and beams. Beam bolting connection to New CMU wall. Bolting attachment of ledger for roof support to CMU wall. OK Pending MTI inspection, report and approval.
|
BLD-Foundation | 1/3/2013 | 1/4/2013 | 1/4/2013 | A | CANC |
Jim Sly
|
|
|
Beginning masonry foundation with rebar reinforcement for new fully grouted shear- wall along grid 9, between E.5 and G. MTI will be on site for continuous inspection- grout of masonry scheduled for 12 noon. Phone #: ###-#### >> Inspection requested via web by Philip Allen OK pending MTI inspection, tests and approvals.
|
BLD-Footing | 12/27/2012 | 12/28/2012 | 12/28/2012 | A | PASS |
Jim Sly
|
|
|
Footing placement for new shearwall (20 yards)at 10:00AM. MTI will be on site for visual inspection of six (6)embedded rebar with epoxy to tie in old footing, rebar placement for reinforcement, will collect cylinders for testing @ 10:00AM Phone #: ###-#### >> Inspection requested via web by Philip Allen OK pending MTI inspection, tests and approvals.
|
BLD-Foundation | 12/19/2012 | 12/20/2012 | 12/20/2012 | A | PART |
Jim Sly
|
|
|
MTI also scheduled for inspection of rebar @ 8AM Please call for timing. Phone #: ###-#### >> Inspection requested via web by Philip Allen Front of Bldg. Footing tie into slab. OK pending MTI special insp. tests and approvals.
|
BLD-Footing | 12/6/2012 | 12/7/2012 | 12/7/2012 | P | PASS |
Jim Sly
|
|
|
Embedded rebar with Epoxy for new column footing tie in along grid 9. Special inspection has been recorded- copies of special inspections are on site. Phone #: ###-#### >> Inspection requested via web by Philip Allen OK pending MTI insp, tests and approvals.
|
BLD-Footing | 11/14/2012 | 11/15/2012 | 11/15/2012 | A | PART |
Jim Sly
|
|
|
Phone #: ###-#### >> Inspection requested via web by Philip Allen Eastern most Column footing OK pending MTI insp, tests and approvals.
|
BLD-Footing | 11/13/2012 | 11/14/2012 | 11/14/2012 | P | CANC |
Jim Sly
|
|
|
Phone #: ###-#### >> Inspection requested via web by Philip Allen Inspection cancelled from web by: Philip Allen
|
Issue PAID IN FULL permit | | | 10/31/2012 | | DONE |
|
|
|
|
OVERRIDE | | | 8/9/2012 | | |
|
|
|
|
Inspection Record Card- Bld | | | 8/9/2012 | | DONE |
Christina Prado
|
|
|
|
Telephone call | | | 8/9/2012 | | DONE |
|
|
|
LM for Kayo that permit is ready and to have GC contact us
|
Permit Ready to Issue | | | 8/9/2012 | | DONE |
|
|
|
|
Plan assigned to (TLW) | 7/25/2012 | | 8/8/2012 | | PASS |
Tim L. Woodard
|
|
|
|
Routing - PLAN CHECK | 7/30/2012 | | 8/8/2012 | | PASS |
Tim L. Woodard
|
|
|
Approved with report. TLW
|
1st review completed | | | 8/8/2012 | | DONE |
Tim L. Woodard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/8/2012 | | DONE |
Tim L. Woodard
|
|
|
|
Case Summary (BLD) | | | 8/8/2012 | | DONE |
Tim L. Woodard
|
|
|
|
Routing - Erosion and Sediment | 8/8/2012 | | 8/8/2012 | | PASS |
Tim L. Woodard
|
|
|
Waiver request approved. Applicant must comply with the attached conditions. TLW
|
Routing - PLUMBING | 7/27/2012 | | 7/30/2012 | | PASS |
Daryl Spivey
|
|
|
1. 2 inch minimum pipe size below grade.
2. Per 2003 UPC.
|
Plan resubmittals received | | | 7/27/2012 | | DONE |
Tisha Gallop
|
|
|
received esc waiver request letter via e-mail; put with plans.
|
Routing - PUBLIC WORKS | 7/27/2012 | | 7/26/2012 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - Addressing | 7/26/2012 | | 7/26/2012 | | PASS |
Terry Records
|
|
|
Changed address and parcel #
|
Routing PW Sewer Rating | 7/26/2012 | | 7/26/2012 | | PASS |
Connie Baumgartner
|
|
|
|
Routing PW Environmental | 7/26/2012 | | 7/26/2012 | | PASS |
Walt Baumgartner
|
|
|
grease interceptor will be required for key area operations like deli, meat dept etc
|
Application received | | 7/24/2012 | 7/25/2012 | | DONE |
Tisha Gallop
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 7/25/2012 | | DONE |
Tisha Gallop
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 7/24/2012 | | DONE |
Tisha Gallop
|
|
|
|