Permanent Occupancy | | | 12/30/2015 | | DONE |
|
|
|
|
BLD-Final | 4/13/2015 | 4/14/2015 | 4/14/2015 | A | PEND |
Jim Sly
|
|
|
C/N.....Failed to take Occ. Request card in......to receive Cert. Of Occ.
|
BLD-Final | 3/19/2014 | 3/19/2014 | 3/19/2014 | A | PEND |
Jim Sly
|
|
|
No contact phone #'s were listed in this case. Called Doug Poedy to contact his aquaintance Mark Deshambeau. Mark needs to Contact city and aquire a Cert of Occ.
|
BLD-Final | 3/18/2013 | 3/18/2013 | 3/18/2013 | P | PASS |
Jim Sly
|
|
|
OK for Perm Occ.
|
FIRE-Final Inspection | 3/14/2013 | 3/15/2013 | 3/15/2013 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
BLD-Final | 3/12/2013 | 3/13/2013 | 3/14/2013 | P | NR |
Jim Sly
|
|
|
Meet Doug P at 1 Phone #: ###-#### Need fire/life safety.
|
BLD-Framing/Rough-in | 11/15/2012 | 11/15/2012 | 11/15/2012 | P | FAIL |
Jim Sly
|
|
|
Tom Phone #: ###-#### ADA Ramp.....NR Need 2 hand rails. Need wheel guard all the way to the bottom of ramp. Hand rail to have return. Continuous handrail Not to be interrupted by make shift brackets.
|
Issue PAID IN FULL permit | | | 10/10/2012 | | DONE |
Christina Prado
|
|
|
|
OVERRIDE | | | 10/9/2012 | | |
|
|
|
|
OVERRIDE | | | 10/9/2012 | | |
|
|
|
|
OVERRIDE | | | 10/9/2012 | | |
|
|
|
|
OVERRIDE | | | 10/9/2012 | | |
|
|
|
|
OVERRIDE | | | 10/9/2012 | | |
|
|
|
|
Telephone call | | | 10/9/2012 | | DONE |
Barbara Stitt
|
|
|
Called Marc and told him that permit is ready, fees due, and need GC & RP info when he comes in on 10-9-12 @ 9:30am//BAS
|
Print Occupancy Form | | | 10/9/2012 | | DONE |
Tisha Gallop
|
|
|
|
Override - Parcel Holds | | | 10/9/2012 | | |
|
|
|
|
Permit Ready to Issue | | | 10/9/2012 | | DONE |
Barbara Stitt
|
|
|
|
Plan assigned to (CDM) | | 7/26/2012 | 10/8/2012 | | PASS |
Carl D Madsen
|
|
|
|
Routing - PLAN CHECK | 10/8/2012 | | 10/8/2012 | | PASS |
Carl D Madsen
|
|
|
|
Routing - PLANNING | 10/8/2012 | | 10/8/2012 | | PASS |
Josh Wilson
|
|
|
|
Routing - Erosion and Sediment | 10/8/2012 | | 10/8/2012 | | PASS |
Carl D Madsen
|
|
|
|
Case Summary (BLD) | | | 10/8/2012 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/8/2012 | | |
|
|
|
|
Plan resubmittals received | | | 10/4/2012 | | DONE |
Tisha Gallop
|
|
|
received two copies of plan sheet G.1, A.2, A.4, SS.2; and one ESC application; taken to Carl Madsen
|
Routing - PLAN CHECK | 9/25/2012 | | 9/25/2012 | | FAIL |
Carl D Madsen
|
|
|
|
Plan resubmittals received | | | 9/21/2012 | | DONE |
Tisha Gallop
|
|
|
received two copies of response, waiver request letter, and plan sheets G.1, AE.1 AE.2, AE.3, A.1, A.2, A.3, A.4, A.5, SS.1, SS.2, SS.3; taken to Carl Madsen
|
Routing - PLAN CHECK | 9/11/2012 | | 9/11/2012 | | FAIL |
Carl D Madsen
|
|
|
See plan review report sent to applicant and architect 9-11-12 CDM
|
Plan resubmittals received | | | 8/30/2012 | | DONE |
Tisha Gallop
|
|
|
received two coipes of plan sheets G1, A1, A2, A3, A4; taken to Carl Madsen.
|
BLD-Conference | 8/23/2012 | 8/23/2012 | 8/23/2012 | P | DONE |
Jim Sly
|
|
|
per 316 request Meeting at jobsite with Bob A. Carl Madsen. Mark Deshambeau (owner) and his Architect.
|
Override - Parcel Holds | | | 8/23/2012 | | |
|
|
|
|
BLD-Conference | 8/22/2012 | 8/22/2012 | 8/22/2012 | P | DONE |
Jim Sly
|
|
|
Stop work order posted on window. Doing work without permits.
|
Override - Parcel Holds | | | 8/22/2012 | | |
|
|
|
|
Plan resubmittals received | | | 8/21/2012 | | DONE |
Tisha Gallop
|
|
|
received two copies of arch. response, form 304, Minor TI checklist and plan sheets G.1, AE.1, AE.2, AE.3, A.1, A.2, A.3, A.4, SS.1, SS.2, SS.3; taken to Carl Madsen.
|
Routing - FIRE | 8/8/2012 | | 8/13/2012 | | PASS |
Scott Arellano
|
|
|
Attached comments to plans.
|
1st review completed | | | 8/13/2012 | | FAIL |
|
|
|
Failed Plan check.
|
Routing - PLAN CHECK | 7/27/2012 | | 8/8/2012 | | FAIL |
Carl D Madsen
|
|
|
Plans are not sufficient to complet a Review.
|
Routing - PUBLIC WORKS | 7/26/2012 | | 7/27/2012 | | PASS |
Beverly Mountain
|
|
|
|
Routing - Addressing | 7/26/2012 | | 7/26/2012 | | PASS |
Terry Records
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 7/26/2012 | | DONE |
Christina Prado
|
|
|
|
Intake Approval | | | 7/26/2012 | | PASS |
Tim L. Woodard
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 7/26/2012 | | DONE |
Christina Prado
|
|
|
|
Application received | | 7/26/2012 | | | |
|
|
|
|