BLD-Final | 10/16/2012 | 10/16/2012 | 10/17/2012 | P | DONE |
Tony Young
|
|
|
eric Phone #: ###-####
|
BLD-Final | 10/15/2012 | 10/16/2012 | 10/16/2012 | A | PASS |
Tony Young
|
|
|
eric Phone #: ###-####,, ok per plans
|
DOC - Permit Finaled | 10/16/2012 | 10/16/2012 | 10/16/2012 | P | PASS |
Tony Young
|
|
|
signed paper work,, ok
|
BLD-Concrete | 8/16/2012 | 8/17/2012 | 8/17/2012 | A | PART |
Tony Young
|
|
|
Pouring at 2 - rebar - Eric Phone #: ###-####
|
BLD-Foundation | 8/16/2012 | 8/16/2012 | 8/16/2012 | P | PART |
Tony Young
|
|
|
Pouring at 2 - rebar - Eric Phone #: ###-####,, rebar work in progress,, 90%
|
Routing Walk-In (BLD) | 8/1/2012 | 8/1/2012 | 8/1/2012 | A | DONE |
Perry Paine
|
|
|
|
1st review completed | | | 8/1/2012 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/1/2012 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 8/1/2012 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 8/1/2012 | | |
|
|
|
|
Telephone call | | | 8/1/2012 | | |
|
|
|
8-1-12 called Eric permit ready and fee given ///dld
|
Issue PAID IN FULL permit | | | 8/1/2012 | | DONE |
|
|
|
|
Routing Walk-In (Erosion) | 7/30/2012 | 7/30/2012 | 7/31/2012 | P | PASS |
Kimberly M. Johnson
|
|
|
Approved per conditions
|
Application received | | 7/30/2012 | 7/30/2012 | | DONE |
Barbara Stitt
|
|
|
|
Routing Walk-In (PW Hillside) | 7/30/2012 | 7/30/2012 | 7/30/2012 | P | PASS |
Terry Records
|
|
|
Construction of the wall must be supervised by the design engineer and a letter written certifying that the wall was built according to the approved design.
|
Routing Walk-In (Zoning) | 7/30/2012 | 7/30/2012 | 7/30/2012 | P | PASS |
Colleen T Carroll
|
|
|
|
Routing Walk-In (BLD) | 7/30/2012 | 7/30/2012 | 7/30/2012 | P | DONE |
Perry Paine
|
|
|
|
CHANGE STATUS TO (REV) | | | 7/30/2012 | | |
|
|
|
|
Routing - FRONT DESK | 7/31/2012 | | | | |
|
|
|
|