BLD-Final | 11/29/2012 | 11/29/2012 | 11/29/2012 | P | PASS |
Dave Hannah
|
|
|
|
DOC - Permit Finaled | 11/29/2012 | 11/29/2012 | 11/29/2012 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Conference | 11/29/2012 | 11/29/2012 | 11/29/2012 | P | PASS |
Dave Hannah
|
|
|
Joe Phone #: ###-####
|
BLD-Framing/Rough-in | 9/14/2012 | 9/14/2012 | 9/14/2012 | A | PASS |
Dave Hannah
|
|
|
|
BLD-Energy code compliance | 9/13/2012 | 9/14/2012 | 9/14/2012 | A | PASS |
Dave Hannah
|
|
|
|
BLD-Framing/Rough-in | 9/11/2012 | 9/12/2012 | 9/13/2012 | P | PART |
Dave Hannah
|
|
|
Joe OR Diane @ ###-#### Phone #: ###-#### ok to insulate needs beam calcs and some top plate straping
|
BLD-Conference | 8/20/2012 | 8/21/2012 | 8/21/2012 | A | PASS |
Dave Hannah
|
|
|
Joe Phone #: ###-####
|
BLD-Foundation | 8/16/2012 | 8/17/2012 | 8/17/2012 | A | PASS |
Dave Hannah
|
|
|
Greg Phone #: ###-####
|
BLD-Footing | 8/16/2012 | 8/16/2012 | 8/16/2012 | P | PASS |
Dave Hannah
|
|
|
Greg Phone #: ###-####
|
OVERRIDE | | | 8/13/2012 | | |
|
|
|
|
Routing Walk-In (Zoning) | 8/13/2012 | 8/13/2012 | 8/13/2012 | A | PASS |
Josh Wilson
|
|
|
OK per DRH12-00226. Signatures recieved for waiver of appeal period. JGW 8-13-12
|
Routing Walk-In (BLD) | 8/13/2012 | 8/13/2012 | 8/13/2012 | A | DONE |
Perry Paine
|
|
|
|
Plan assigned to (PEP) | 8/13/2012 | 8/13/2012 | 8/13/2012 | | PASS |
Perry Paine
|
|
|
|
1st review completed | | | 8/13/2012 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/13/2012 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 8/13/2012 | | DONE |
Christina Prado
|
|
|
|
Case Summary (BLD) | | | 8/13/2012 | | |
|
|
|
|
Inspection Record Card- Bld | | | 8/13/2012 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 8/13/2012 | | DONE |
Christina Prado
|
|
|
|
Routing Walk-In (Zoning) | 7/30/2012 | 7/30/2012 | 8/6/2012 | P | FAIL |
Perry Paine
|
|
|
substandard lot problems
|
Application received | | 7/30/2012 | | | |
|
|
|
|