BLD-Final | 3/7/2013 | 3/8/2013 | 3/8/2013 | A | PASS |
Jim Sly
|
|
|
Michah ###-####
|
DOC - Permit Finaled | 3/8/2013 | 3/8/2013 | 3/8/2013 | P | PASS |
Jim Sly
|
|
|
|
BLD-Final | 3/7/2013 | 3/7/2013 | 3/7/2013 | P | NR |
Jim Sly
|
|
|
micah Phone #: ###-####
|
BLD-Final | 3/5/2013 | 3/6/2013 | 3/6/2013 | A | NR |
Jim Sly
|
|
|
Micah Phone #: ###-####
|
BLD-Framing/Rough-in | 1/10/2013 | 1/11/2013 | 1/11/2013 | A | PASS |
Jim Sly
|
|
|
Micah Phone #: ###-#### Frame and energy.....OK
|
BLD-Wall Bracing | 1/4/2013 | 1/7/2013 | 1/7/2013 | A | PASS |
Jim Sly
|
|
|
micah Phone #: ###-####
|
BLD-Wall Bracing | 12/17/2012 | 12/18/2012 | 12/18/2012 | A | FAIL |
Jim Sly
|
|
|
Micah Phone #: ###-#### Need approved plan.
|
BLD-Foundation | 11/16/2012 | 11/19/2012 | 11/19/2012 | A | PASS |
Jim Sly
|
|
|
Ian Phone #: ###-####
|
BLD-Footing | 11/15/2012 | 11/15/2012 | 11/16/2012 | P | PASS |
Jim Sly
|
|
|
Ian Phone #: ###-####
|
Issue PAID IN FULL permit | | | 11/9/2012 | | DONE |
Christina Prado
|
|
|
|
OVERRIDE | | | 8/31/2012 | | |
|
|
|
|
Plan assigned to (CDM) | | 8/1/2012 | 8/31/2012 | | PASS |
Carl D Madsen
|
|
|
|
Routing - MECHANICAL | 8/31/2012 | | 8/31/2012 | | PASS |
Troy James
|
|
|
|
Routing - PLAN CHECK | 8/31/2012 | | 8/31/2012 | | PASS |
Carl D Madsen
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/31/2012 | | |
|
|
|
|
Inspection Record Card- Bld | | | 8/31/2012 | | DONE |
Tisha Gallop
|
|
|
|
Permit Ready to Issue | | | 8/31/2012 | | DONE |
Tisha Gallop
|
|
|
|
Telephone call | | | 8/31/2012 | | DONE |
Tisha Gallop
|
|
|
called Biltmore and told Angie permit is ready and fees.
|
Routing - PLAN CHECK | 8/30/2012 | | 8/30/2012 | | PASS |
Carl D Madsen
|
|
|
|
Routing - MECHANICAL | 8/30/2012 | | 8/30/2012 | | FAIL |
Troy James
|
|
|
emailed alley heating
|
Plan resubmittals received | | | 8/28/2012 | | DONE |
Tisha Gallop
|
|
|
received two copies of plan sheet A102, S101,S102, S103, S104; inserted by GC and taken back to Carl M.
|
1st review completed | | | 8/22/2012 | | FAIL |
|
|
|
|
Case Summary (BLD) | | | 8/22/2012 | | DONE |
|
|
|
|
Routing - PLANNING | 8/22/2012 | | 8/22/2012 | | PASS |
David Moser
|
|
|
|
Routing - PLAN CHECK | 8/6/2012 | | 8/22/2012 | | FAIL |
Carl D Madsen
|
|
|
Wall bracing and beam call outs. E-Mailed applicant 8-22-12 CDM
|
Routing - MECHANICAL | 8/3/2012 | | 8/6/2012 | | FAIL |
Troy James
|
|
|
emailed corrections to Alley heating
|
Plan resubmittals received | | | 8/6/2012 | | DONE |
Tisha Gallop
|
|
|
received two full size copies revised site plan and one reduced size; put with plans currently in Mechanical review.
|
Routing - PLANNING | 8/2/2012 | | 8/3/2012 | | FAIL |
David Moser
|
|
|
Failed; driveway is 38 feet wide within the front yard setback. 33 feet is the max width. Called the applicant on 8-3-12.
|
Route to Impact Fee Review | 8/1/2012 | 8/6/2012 | 8/2/2012 | | PASS |
Shauna Surgeon
|
|
|
|
Routing - Addressing | 8/1/2012 | | 8/2/2012 | | PASS |
Terry Records
|
|
|
|
Routing - PUBLIC WORKS | 8/2/2012 | | 8/2/2012 | | PASS |
Beverly Mountain
|
|
|
|
Application received | | 8/1/2012 | 8/1/2012 | | DONE |
Christina Prado
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 8/1/2012 | | DONE |
Christina Prado
|
|
|
|
Intake Approval | | | 8/1/2012 | | PASS |
Christina Prado
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 8/1/2012 | | DONE |
Christina Prado
|
|
|
|