Third Notice | | 4/27/2013 | 6/3/2013 | | DONE |
|
|
|
mailed to McMillan Building
|
Second Notice | | 4/1/2013 | 4/22/2013 | | DONE |
Christina Prado
|
|
|
mailed 4-23-13
|
First Notice | | 2/24/2013 | 3/22/2013 | | DONE |
|
|
|
|
Permanent Occupancy | | | 2/14/2013 | | DONE |
Christina Prado
|
|
|
|
BLD-Final | 1/23/2013 | 1/24/2013 | 1/24/2013 | A | PASS |
Tony Young
|
|
|
Austin Phone #: ###-####,, ok for perm occ.
|
BLD-Final | 1/16/2013 | 1/16/2013 | 1/17/2013 | P | NR |
Dave Hannah
|
|
|
erin Phone #: ###-####
|
BLD-Final | 1/2/2013 | 1/3/2013 | 1/3/2013 | A | PART |
Dave Hannah
|
|
|
jim Phone #: ###-####ok fdor temp occ needs to lower break room sink to 34 inchs
|
FIRE-Final Inspection | 12/31/2012 | 1/2/2013 | 1/2/2013 | P | PASS |
Forrest France
|
|
|
Field verified noted correction items are complete. Life safety inspection passed.
|
BLD-Final | 12/26/2012 | 12/27/2012 | 12/28/2012 | A | FAIL |
Dave Hannah
|
|
|
dale - call 30 mins prior to meet Phone #: ###-####
|
BLD-Conference | 12/27/2012 | 12/28/2012 | 12/28/2012 | A | PASS |
Dave Hannah
|
|
|
10ish - Benjamin Phone #: ###-####
|
FIRE-Conference | 12/27/2012 | 12/27/2012 | 12/27/2012 | P | DONE |
Forrest France
|
|
|
Regarding correction notice items.
|
FIRE-Final Inspection | 12/26/2012 | 12/26/2012 | 12/27/2012 | P | FAIL |
Forrest France
|
|
|
Correction items noted include; door hardware at the restroom and pocket doors, post the fire extinguisher with a current certification tag, repair exit sign/EM light on backup power source, missing stamped plan set on site for field verification and review.
|
BLD-Framing/Rough-in | 8/27/2012 | 8/28/2012 | 8/28/2012 | A | PASS |
Dave Hannah
|
|
|
Please call 20min prior for access - Jim Phone #: ###-####
|
Permit Ready to Issue | | | 8/20/2012 | | DONE |
|
|
|
|
Telephone call | | | 8/20/2012 | | DONE |
|
|
|
LM for Jimmy permit ready fees given
|
Issue PAID IN FULL permit | | | 8/20/2012 | | DONE |
Barbara Stitt
|
|
|
|
Routing - PLAN CHECK | 8/17/2012 | | 8/17/2012 | | PASS |
Tim L. Woodard
|
|
|
Approved with comments from architect and inspector verified bearing walls.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/17/2012 | | DONE |
Tim L. Woodard
|
|
|
|
Case Summary (BLD) | | | 8/17/2012 | | DONE |
Tim L. Woodard
|
|
|
|
Print Occupancy Form | | | 8/17/2012 | | DONE |
Christina Prado
|
|
|
|
Plan assigned to (TLW) | | | 8/17/2012 | | PASS |
Tim L. Woodard
|
|
|
|
Plan resubmittals received | | | 8/16/2012 | | DONE |
Christina Prado
|
|
|
Received one response letter from architect; one response letter from engineer and two sets of plans marked E1.0. Gave letters and plans to Tim for review
|
1st review completed | | | 8/15/2012 | | DONE |
Tim L. Woodard
|
|
|
|
Routing - PLAN CHECK | 8/3/2012 | | 8/15/2012 | | FAIL |
Tim L. Woodard
|
|
|
Refer to plan review report. TLW
|
Routing - PUBLIC WORKS | 8/2/2012 | | 8/3/2012 | | PASS |
Beverly Mountain
|
|
|
|
Plan resubmittals received | | | 8/3/2012 | | DONE |
|
|
|
rec'd two copies of sheet A1.0 - taken to Tim
|
Plans ACCEPTED BY PLAN TECH | | | 8/2/2012 | | DONE |
Christina Prado
|
|
|
|
Intake Approval | | | 8/2/2012 | | |
Tim L. Woodard
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 8/2/2012 | | DONE |
Christina Prado
|
|
|
|
Routing - Addressing | 8/2/2012 | | 8/2/2012 | | PASS |
Terry Records
|
|
|
|
Temporary Occupancy | 1/2/2013 | 4/2/2013 | | | |
|
|
|
|
Application received | | 8/2/2012 | | | |
|
|
|
|