Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD12-02032
StatusFinaled
Name MCMILLAN BUILDING & REMODELING
Site Address 1023 W MAIN ST
Project NameRADIATE MEDI SPA
Customer Number 
ePlanReviewNo
Description
(RADIATE MEDI SPA) Permit is to remodel an existing 1,202 square foot tenant space for a new spa. This space was previously submitted as a retail vanilla shell under BLD07-02684 with mostly retail and a little office area. This tenant will have mostly professional service area (B) and a little retail (M). This was reviewed as a partial change in occupancy. Work is to include: demolition of existing non-bearing partition walls, [construction of new non-bearing partition walls to create: a sales / reception area, 7 private rooms, a break room, two unisex accessible toilets, and a utility closet], new lighting, miscellaneous electrical, miscellaneous mechanical, installation of new accessible doors / hardware, new plumbing, and interior finishes. . This building is not fire sprinklered. **TLW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 4/27/20136/3/2013 DONE
mailed to McMillan Building
Second Notice 4/1/20134/22/2013 DONE
DetailsChristina Prado
mailed 4-23-13
First Notice 2/24/20133/22/2013 DONE
Permanent Occupancy  2/14/2013 DONE
DetailsChristina Prado
BLD-Final1/23/20131/24/20131/24/2013APASS
DetailsTony Young
Austin Phone #: ###-####,, ok for perm occ.
BLD-Final1/16/20131/16/20131/17/2013PNR
DetailsDave Hannah
erin Phone #: ###-####
BLD-Final1/2/20131/3/20131/3/2013APART
DetailsDave Hannah
jim Phone #: ###-####ok fdor temp occ needs to lower break room sink to 34 inchs
FIRE-Final Inspection12/31/20121/2/20131/2/2013PPASS
DetailsForrest France
Field verified noted correction items are complete. Life safety inspection passed.
BLD-Final12/26/201212/27/201212/28/2012AFAIL
DetailsDave Hannah
dale - call 30 mins prior to meet Phone #: ###-####
BLD-Conference12/27/201212/28/201212/28/2012APASS
DetailsDave Hannah
10ish - Benjamin Phone #: ###-####
FIRE-Conference12/27/201212/27/201212/27/2012PDONE
DetailsForrest France
Regarding correction notice items.
FIRE-Final Inspection12/26/201212/26/201212/27/2012PFAIL
DetailsForrest France
Correction items noted include; door hardware at the restroom and pocket doors, post the fire extinguisher with a current certification tag, repair exit sign/EM light on backup power source, missing stamped plan set on site for field verification and review.
BLD-Framing/Rough-in8/27/20128/28/20128/28/2012APASS
DetailsDave Hannah
Please call 20min prior for access - Jim Phone #: ###-####
Permit Ready to Issue  8/20/2012 DONE
Telephone call  8/20/2012 DONE
LM for Jimmy permit ready fees given
Issue PAID IN FULL permit  8/20/2012 DONE
DetailsBarbara Stitt
Routing - PLAN CHECK8/17/2012 8/17/2012 PASS
DetailsTim L. Woodard
Approved with comments from architect and inspector verified bearing walls.
PLANS/APPL TAKEN TO FRONT DESK  8/17/2012 DONE
DetailsTim L. Woodard
Case Summary (BLD)  8/17/2012 DONE
DetailsTim L. Woodard
Print Occupancy Form  8/17/2012 DONE
DetailsChristina Prado
Plan assigned to (TLW)  8/17/2012 PASS
DetailsTim L. Woodard
Plan resubmittals received  8/16/2012 DONE
DetailsChristina Prado
Received one response letter from architect; one response letter from engineer and two sets of plans marked E1.0. Gave letters and plans to Tim for review
1st review completed  8/15/2012 DONE
DetailsTim L. Woodard
Routing - PLAN CHECK8/3/2012 8/15/2012 FAIL
DetailsTim L. Woodard
Refer to plan review report. TLW
Routing - PUBLIC WORKS8/2/2012 8/3/2012 PASS
DetailsBeverly Mountain
Plan resubmittals received  8/3/2012 DONE
rec'd two copies of sheet A1.0 - taken to Tim
Plans ACCEPTED BY PLAN TECH  8/2/2012 DONE
DetailsChristina Prado
Intake Approval  8/2/2012  
DetailsTim L. Woodard
Recd Pcfee & Taken To Pln CK  8/2/2012 DONE
DetailsChristina Prado
Routing - Addressing8/2/2012 8/2/2012 PASS
DetailsTerry Records
Temporary Occupancy1/2/20134/2/2013   
Application received 8/2/2012