BLD-Final | 7/15/2013 | 7/15/2013 | 7/15/2013 | P | PASS |
Tony Young
|
|
|
john Phone #: ###-####
|
DOC - Permit Finaled | 7/15/2013 | 7/15/2013 | 7/15/2013 | P | PASS |
Tony Young
|
|
|
done
|
BLD-Final | 7/10/2013 | 7/12/2013 | 7/12/2013 | P | NR |
Jim Sly
|
|
|
john Phone #: ###-#### Need to install smoke det. in every sleeping room.......Outside sleeping areas and on every floor level. Need to install Co2 Det. outside sleeping rooms and on every floor level. This is what I told homeowner to do.
|
BLD-Energy code compliance | 8/31/2012 | 8/31/2012 | 8/31/2012 | P | PASS |
Tony Young
|
|
|
John-PLease call for access information Phone #: ###-####
|
BLD-Framing/Rough-in | 8/27/2012 | 8/28/2012 | 8/28/2012 | P | PASS |
Dave Hannah
|
|
|
John Phone #: ###-####
|
BLD-Framing/Rough-in | 8/8/2012 | 8/8/2012 | 8/9/2012 | P | PART |
Dave Hannah
|
|
|
John Phone #: ###-#### ok to cover window
|
Application received | | 8/2/2012 | 8/2/2012 | | DONE |
Barbara Stitt
|
|
|
|
Routing Walk-In (Zoning) | 8/2/2012 | 8/2/2012 | 8/2/2012 | P | PASS |
Colleen T Carroll
|
|
|
|
Routing Walk-In (BLD) | 8/2/2012 | 8/2/2012 | 8/2/2012 | P | DONE |
Perry Paine
|
|
|
|
Plan assigned to (PEP) | 8/2/2012 | 8/2/2012 | 8/2/2012 | | PASS |
Perry Paine
|
|
|
|
Case Summary (BLD) | | | 8/2/2012 | | |
|
|
|
|
Inspection Record Card- Bld | | | 8/2/2012 | | |
|
|
|
|
1st review completed | | | 8/2/2012 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/2/2012 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 8/2/2012 | | DONE |
Barbara Stitt
|
|
|
|
Issue PAID IN FULL permit | | | 8/2/2012 | | DONE |
Barbara Stitt
|
|
|
|