BLD-Final | 10/30/2012 | 10/30/2012 | 10/31/2012 | P | PASS |
Dave Hannah
|
|
|
Christina please call before going out Phone #: ###-####
|
DOC - Permit Finaled | 10/31/2012 | 10/31/2012 | 10/31/2012 | A | PASS |
Dave Hannah
|
|
|
|
BLD-Final | 10/29/2012 | 10/29/2012 | 10/29/2012 | P | FAIL |
Dave Hannah
|
|
|
Christina please call before going out Phone #: ###-#### needs a co2 detector in basement
|
BLD-Framing/Rough-in | 9/6/2012 | 9/7/2012 | 9/7/2012 | P | PASS |
Dave Hannah
|
|
|
Christine Phone #: ###-####
|
BLD-Framing/Rough-in | 9/5/2012 | 9/6/2012 | 9/6/2012 | P | FAIL |
Jim Storey
|
|
|
Chris Phone #: ###-#### hook up vent fan duct/ provide 4x6 floor support at opening bottom of stairs to support over span joist// chalk seal top and bottom plat openings // fire blk stairs// fur out dryer vent wall 1/2 .
|
Routing Walk-In (Zoning) | 8/3/2012 | 8/3/2012 | 8/3/2012 | A | PASS |
Josh Wilson
|
|
|
Ok- all work interior and no second kitchen
|
Routing Walk-In (BLD) | 8/3/2012 | 8/3/2012 | 8/3/2012 | A | DONE |
Perry Paine
|
|
|
|
Plan assigned to (PEP) | 8/3/2012 | 8/3/2012 | 8/3/2012 | | PASS |
Perry Paine
|
|
|
|
Case Summary (BLD) | | | 8/3/2012 | | |
|
|
|
|
Inspection Record Card- Bld | | | 8/3/2012 | | |
|
|
|
|
1st review completed | | | 8/3/2012 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/3/2012 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 8/3/2012 | | DONE |
Barbara Stitt
|
|
|
|
Issue PAID IN FULL permit | | | 8/3/2012 | | DONE |
Barbara Stitt
|
|
|
|
Application received | | 8/3/2012 | | | |
|
|
|
|