First Notice | | 9/24/2012 | 10/15/2012 | | DONE |
Christina Prado
|
|
|
|
BLD-Final | 9/14/2012 | 9/14/2012 | 9/14/2012 | P | PASS |
Dave Hannah
|
|
|
Trent Phone #: ###-####
|
FIRE-Final Inspection | 9/13/2012 | 9/14/2012 | 9/14/2012 | P | PASS |
Forrest France
|
|
|
Noted correction items verified for completion. Fire life safety finaled.
|
Permanent Occupancy | | | 9/14/2012 | | DONE |
|
|
|
|
FIRE-Final Inspection | 9/6/2012 | 9/7/2012 | 9/7/2012 | A | FAIL |
Troy Cobbley
|
|
|
Repair the exit discharge light, repair and lower the emergency light near the main exit, repair the exit sign that exits to the egress corridor, provide annual inspection for the fire extinguisher, replace the painted upright sprinkler head and remove the pendant in the north corner of the tenant space and provide the panic hardware on the bakery side of the door that leads back into the arcade. The nuclear exit signs appear to have a stamp stating they are good until 2020. Sprinkler system annual inspection is current.
|
FIRE-Final Inspection | 8/27/2012 | 8/28/2012 | 8/28/2012 | A | CANC |
Forrest France
|
|
|
Please call ahead for access - Trent Phone #: ###-####
|
FIRE-Conference | 8/27/2012 | 8/27/2012 | 8/27/2012 | P | DONE |
Forrest France
|
|
|
Regarding fire life safety conditions, attatched alternate approval, and field inspection schedule.
|
Issue PAID IN FULL permit | | | 8/24/2012 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 8/20/2012 | | 8/20/2012 | | PASS |
Tim L. Woodard
|
|
|
Building Official and Fire Marshall approved alternate. It is attached to this case and the plans. TLW
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/20/2012 | | DONE |
Tim L. Woodard
|
|
|
|
Case Summary (BLD) | | | 8/20/2012 | | DONE |
Tim L. Woodard
|
|
|
|
Print Occupancy Form | | | 8/20/2012 | | DONE |
Christina Prado
|
|
|
|
Permit Ready to Issue | | | 8/20/2012 | | |
|
|
|
|
Telephone call | | | 8/20/2012 | | |
|
|
|
8-20-12 called left message with Sahar permit ready and fee given ///dld
|
Plan assigned to (TLW) | | | 8/20/2012 | | PASS |
Tim L. Woodard
|
|
|
|
Additional plans submitted | | | 8/17/2012 | | DONE |
|
|
|
Approved Building Code Alternate. See attached documents.
|
Routing - PLAN CHECK | 8/6/2012 | | 8/13/2012 | | PEND |
Tim L. Woodard
|
|
|
Awaiting B O approval of alternate.
|
1st review completed | | | 8/13/2012 | | DONE |
Tim L. Woodard
|
|
|
|
Routing - PUBLIC WORKS | 8/3/2012 | | 8/6/2012 | | PASS |
Beverly Mountain
|
|
|
|
Routing - Addressing | 8/3/2012 | | 8/3/2012 | | PASS |
April Wing
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 8/3/2012 | | DONE |
Christina Prado
|
|
|
|
Intake Approval | | | 8/3/2012 | | PASS |
Tim L. Woodard
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 8/3/2012 | | DONE |
Christina Prado
|
|
|
|
Application received | | 8/3/2012 | | | |
|
|
|
|