BLD-Final | 10/29/2012 | 10/30/2012 | 10/30/2012 | A | PASS |
Jim Sly
|
|
|
Robert Phone #: ###-####
|
DOC - Permit Finaled | 10/30/2012 | 10/30/2012 | 10/30/2012 | P | PASS |
Jim Sly
|
|
|
|
BLD-Energy code compliance | 10/2/2012 | 10/3/2012 | 10/3/2012 | A | PASS |
Jim Sly
|
|
|
robert Phone #: ###-####
|
BLD-Framing/Rough-in | 10/2/2012 | 10/3/2012 | 10/3/2012 | A | PASS |
Jim Sly
|
|
|
robert Phone #: ###-####
|
Routing Walk-In (BLD) | 9/28/2012 | 9/28/2012 | 9/28/2012 | P | PASS |
Perry Paine
|
|
|
Contractor had questions about the requirements for recepticle placement. Wall with pocket door and door opened against that 12-18" wall. Said electrician required to put in a floor recep. I gage him info to speak to electrical inspector. pep
|
BLD-Framing/Rough-in | 9/19/2012 | 9/19/2012 | 9/19/2012 | P | PART |
Jim Sly
|
|
|
Robert ###-#### Shear only......OK.
|
BLD-Framing/Rough-in | 9/18/2012 | 9/19/2012 | 9/19/2012 | A | CANC |
Jim Sly
|
|
|
robert Phone #: ###-#### Re-sched........PM
|
BLD-Footing | 9/10/2012 | 9/10/2012 | 9/10/2012 | P | PASS |
Jim Sly
|
|
|
Robert Phone #: ###-####
|
Routing Walk-In (Zoning) | 8/9/2012 | 8/9/2012 | 8/9/2012 | P | PASS |
Bruce Eggleston
|
|
|
|
Routing Walk-In (BLD) | 8/9/2012 | 8/9/2012 | 8/9/2012 | P | PASS |
Carl D Madsen
|
|
|
|
1st review completed | | | 8/9/2012 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 8/9/2012 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 8/9/2012 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/9/2012 | | |
|
|
|
|
Permit Ready to Issue | | | 8/9/2012 | | DONE |
Barbara Stitt
|
|
|
|
Issue PAID IN FULL permit | | | 8/9/2012 | | DONE |
Barbara Stitt
|
|
|
|
Application received | | 8/9/2012 | | | |
|
|
|
|