DOC - Permit Finaled | | | 10/10/2012 | | DONE |
Christina Prado
|
|
|
|
Letter of compliance/Occupancy | | | 10/10/2012 | | DONE |
|
|
|
|
BLD-Final | 10/8/2012 | 10/9/2012 | 10/9/2012 | A | PASS |
Dave Hannah
|
|
|
alreay seen, just was pending fire which signed off on 10/8 -- call Rick if questions ###-#### Phone #: ###-####
|
FIRE-Final Inspection | 10/8/2012 | 10/8/2012 | 10/8/2012 | P | PASS |
Forrest France
|
|
|
Fire life safety final approved.
|
BLD-Final | 8/28/2012 | 8/29/2012 | 8/29/2012 | A | PEND |
Dave Hannah
|
|
|
ED Phone #: ###-#### ok for temp occ ok for perm occ after fire oks
|
FIRE-Final Inspection | 8/28/2012 | 8/29/2012 | 8/29/2012 | A | PART |
Troy Cobbley
|
|
|
A temporary occupancy was given until a fire alarm pemit is issued and the audible portion of the fire alarm system within the resident rooms is addressed. The apartment addressing has been fixed. All other items were ok.
|
BLD-Framing/Rough-in | 8/22/2012 | 8/22/2012 | 8/23/2012 | P | PART |
Dave Hannah
|
|
|
ED Phone #: ###-#### ok to cover beams that opens between the two condos
|
FIRE-Conference | 8/21/2012 | 8/22/2012 | 8/22/2012 | A | DONE |
Troy Cobbley
|
|
|
I met with ED and discussed fire life safety items. They stated that they knew a fire alarm permit would be required for modifications to annunciation since separate apartments are now one. It appears the sprinkler protection will remain ok. I let him know that the building sprinkler system will need to be current with its annual inspection and that I would need to have the exit sign/emergency lights in the path of egress tested.
|
Print Occupancy Form | | | 8/20/2012 | | DONE |
Christina Prado
|
|
|
|
Telephone call | | | 8/20/2012 | | DONE |
|
|
|
spoke with contractor permit ready need to sign gc form
|
Permit Ready to Issue | | | 8/20/2012 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 8/20/2012 | | DONE |
Christina Prado
|
|
|
|
Plan assigned to (CJW) | 8/17/2012 | 8/17/2012 | 8/17/2012 | | PASS |
Carl Westfall
|
|
|
|
Plan assigned to (DRS) | 8/10/2012 | 8/10/2012 | 8/17/2012 | | |
Dan Stuart
|
|
|
Reassigned to Carl Westfall
|
Routing - PLAN CHECK | 8/14/2012 | | 8/17/2012 | | PASS |
Dan Stuart
|
|
|
Drawings approved with "red lines" and attachments.
|
1st review completed | | | 8/17/2012 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/17/2012 | | |
|
|
|
|
Routing PW Sewer Rating | 8/13/2012 | | 8/14/2012 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - Addressing | 8/10/2012 | | 8/13/2012 | | PASS |
Terry Records
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 8/10/2012 | | DONE |
Barbara Stitt
|
|
|
|
Pending Assignment by JCB | 8/10/2012 | | 8/10/2012 | | DONE |
Jason Blais
|
|
|
|
Print Pending Permit.LaserJet4 | | | 8/10/2012 | | |
|
|
|
|
Application received | | 8/9/2012 | 8/9/2012 | | DONE |
Barbara Stitt
|
|
|
|
Intake Approval | | | 8/9/2012 | | PASS |
Carl D Madsen
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 8/9/2012 | | DONE |
Barbara Stitt
|
|
|
|