Print Statement | | | 10/18/2013 | | DONE |
Christina Prado
|
|
|
|
First Notice | 7/29/2013 | 7/29/2013 | 10/2/2013 | | DONE |
Jim Storey
|
|
|
mailed 10-3-13
|
BLD-Final | 7/29/2013 | 7/29/2013 | 7/29/2013 | P | PASS |
Jim Storey
|
|
|
|
DOC - Permit Finaled | 7/29/2013 | 7/29/2013 | 7/29/2013 | P | PASS |
Jim Storey
|
|
|
|
BLD-Final | 3/26/2013 | 3/27/2013 | 3/27/2013 | A | PART |
Jim Storey
|
|
|
Please call 15 mins prior to meet at site - Justin Phone #: ###-#### need ele and p&z
|
FIRE-Final Inspection | 3/26/2013 | 3/26/2013 | 3/27/2013 | P | PASS |
Forrest France
|
|
|
Scope of work completed. Life safety passed, no signature card available on site.
|
Zoning Approval | 3/27/2013 | 3/27/2013 | 3/27/2013 | | DONE |
Andrea Tuning
|
|
|
|
BLD-Final | 11/19/2012 | 11/19/2012 | 11/19/2012 | P | NR |
Jim Storey
|
|
|
BEN Phone #: ###-####
|
BLD-Framing/Rough-in | 11/19/2012 | 11/19/2012 | 11/19/2012 | P | PASS |
Jim Storey
|
|
|
BEN Phone #: ###-####
|
BLD-Foundation | 11/19/2012 | 11/19/2012 | 11/19/2012 | P | PASS |
Jim Storey
|
|
|
BEN Phone #: ###-####
|
Issue PAID IN FULL permit | | | 9/27/2012 | | DONE |
Christina Prado
|
|
|
|
Inspection Record Card- Bld | | | 9/27/2012 | | DONE |
Christina Prado
|
|
|
|
OVERRIDE | | | 9/24/2012 | | |
|
|
|
|
Permit Ready to Issue | | | 9/24/2012 | | DONE |
Tisha Gallop
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/19/2012 | | DONE |
John Menard
|
|
|
|
1st review completed | | | 9/19/2012 | | DONE |
John Menard
|
|
|
|
Plan assigned to (JCM) | 9/7/2012 | | 9/19/2012 | | PASS |
John Menard
|
|
|
|
Routing - PLAN CHECK | 9/7/2012 | | 9/19/2012 | | PASS |
John Menard
|
|
|
|
Routing - FIRE | 9/10/2012 | | 9/12/2012 | | PASS |
Scott Arellano
|
|
|
No comments attached.
|
Routing - Erosion and Sediment | 9/7/2012 | | 9/10/2012 | | PASS |
Kimberly M. Johnson
|
|
|
|
Routing - PLANNING | 9/7/2012 | | 9/10/2012 | | PASS |
Andrea Tuning
|
|
|
|
Payment Received | | | 9/7/2012 | | DONE |
|
|
|
Payment received via Govolutions
|
Pending Assignment by JCM | 9/7/2012 | | 9/7/2012 | | DONE |
John Menard
|
|
|
|
Routing - PLANNING Land Div | 9/7/2012 | | 9/7/2012 | | PASS |
Dave Abo
|
|
|
Parcel over 5 acres in size.
|
Telephone call | | | 9/7/2012 | | DONE |
Christina Prado
|
|
|
Set Mike S and email advising plan review fees are due
|
Intake Approval | | | 8/20/2012 | | FAIL |
John Menard
|
|
|
1-Please have the Registered Design Professional stamp and sign the plans.
2-Please revise plan sheets G-001 and A-101 to provide the required space in the lower right hand corner,
for City stamps.
3-Please submit structural calculations for wind and snow loads. Please provide structural design loads and structural material specifications.
4-Please submit a completed Erosion and Sediment Control application, as well as, an ESC plan and narrative or waiver request letter.
5-Please submit lighting compliance and lighting schedule information.
|
Intake Approval | | | 8/13/2012 | | FAIL |
John Menard
|
|
|
The submittal was not complete enough to do a pre-screen for this project.
Please fill out and submit a completed Plan Submittal Checklist.
Please submit all applicable required items from the checklist.
Please resubmit all plan sheets oriented horizontally.
There should be a space provided, in the lower right hand corner,
for City stamps.
|
Application received | | | 8/10/2012 | | DONE |
|
|
|
Application submitted via PDS Online on Aug 10 2012 11:18AM
|