Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD12-02114
StatusFinaled
Name RAFANELLI AND NAHAS
Site Address 1504 S LOGGERS POND PL
Project NameRIVER QUARRY APT CANOPY
Customer Number 
ePlanReviewNo
Description
RIVER QUARRY APT CANOPY- (BUILDING # 25) To construct a new canopy above an elevated walk way on the third floor. This canopy will be 68 square feet in area making the building approximately 12,861 square feet. Work to include: construction of a wood framed canopy w/ 2X6 roof rafters and a 3 ½ inch by 9 ¼ inch microlam beam; roof covering shall comply with chapter 15 of the 2009 IBC. All work shall comply with the approved drawings, the plan review report, and all applicable codes. NOTE: This building is fully Fire Sprinklered. Any alterations or modifications to the buildings Fire Sprinkler system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13R as regulated by the Boise Fire Department. **SRZ**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final10/31/201211/1/201211/1/2012APASS
DetailsJim Storey
ben Phone #: ###-####
DOC - Permit Finaled11/1/201211/1/201211/1/2012PPASS
DetailsJim Storey
BLD-Final10/31/201210/31/201210/31/2012PCANC
DetailsTony Young
ben Phone #: ###-####,, wanted JS
FIRE-Final Inspection10/30/201210/30/201210/30/2012PPASS
DetailsForrest France
Life safety passed.
BLD-Framing/Rough-in10/29/201210/29/201210/29/2012PPASS
DetailsJim Storey
Ben Phone #: ###-####
Issue PAID IN FULL permit  9/11/2012 DONE
DetailsBarbara Stitt
Print Occupancy Form  9/7/2012 DONE
DetailsBarbara Stitt
Permit Ready to Issue  9/7/2012 DONE
DetailsTisha Gallop
Telephone call  9/7/2012 DONE
DetailsTisha Gallop
Called Scott and left vm permit is ready, fee and need GC.
Plan assigned to (SRZ)8/15/20128/15/20129/6/2012 PASS
DetailsSam Zahorka
1st review completed. Pending Fire to PASS.
Routing - FIRE9/4/2012 9/6/2012 PASS
DetailsScott Arellano
No comments attached.
1st review completed  9/6/2012 PASS
Routing - PLAN CHECK9/6/2012 9/6/2012 PASS
DetailsSam Zahorka
PLANS/APPL TAKEN TO FRONT DESK  9/6/2012 DONE
DetailsSam Zahorka
Routing - PLAN CHECK8/16/2012 8/31/2012 PASS
DetailsSam Zahorka
Routing - Design Review8/15/2012 8/16/2012 PASS
DetailsJosh Wilson
Josh Wilson - CZC11-00188
Pending Assignment by JCB8/13/2012 8/15/2012 DONE
DetailsJason Blais
Application received 8/13/20128/13/2012 DONE
DetailsBarbara Stitt
Plans ACCEPTED BY PLAN TECH  8/13/2012 PASS
DetailsBarbara Stitt
Intake Approval  8/13/2012 PASS
DetailsCarl Westfall
Recd Pcfee & Taken To Pln CK  8/13/2012 DONE
DetailsBarbara Stitt
First Notice11/1/201211/1/2012   
DetailsJim Storey