Permit Information
Permit NumberBLD12-02185
StatusExpired
Name RICHARD HONSINGER
Site Address 1406 W EASTMAN ST
Project NameTRICA
Customer Number 
ePlanReviewNo
Description
(TREASURE VALLEY INSTITUTE FOR CHILDRENS ARTS)(TRICA) To remodel a 530 sq. ft. (460 sq. ft. office / 70 sq. ft. accessible restroom) area within an existing 4,886 sq. ft. main floor building (does not include lower and upper floor levels). Work includes select interior demolition within future office area; modify existing exit door, hardware, landings, stairs, guard and handrails that serve as the access egress for the proposed office area directly, for compliance with current code; add insulation to interior and exterior walls of office and restroom area; electrical & plumbing upgrades for specified areas and interior Class 'C' finishes or better. This scope of work is very limited in area to occupancy of the office and supporting restroom. When finaled, a temporary occupancy with specific, limitations to be based on the yet to be defined requirements of future Phase II scope of work, which will address all structural issues and occupancy use issues for proposed occupancy use and occupant loads. The occupancy and use of the office & restroom scope of this permit is denied until such time as a letter from the structural engineer of record is provided stating the structural safety of the building is satisfactory for the office and restroom to be occupied and any specific limitations based on the proposed use. A letter from the responsible structural engineer stating the safety and limits of occupancy is to be provided and approved by the Building Official before any occupancy will be allowed. drs
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Plan assigned to (CJW)1/3/20131/3/201312/31/2013 DONE
DetailsCarl Westfall
TRICA - Project reassigned to Carl Westfall

(12-31-13) Project expired by Inspector.
BLD-Other12/3/201312/4/201312/4/2013AFAIL
DetailsTony Young
Verify if occupied, post structure not approved for occupancy and expire permit.,, posted 2 doors,, took pictures,, lights on inside,, no answer at either door,, expired permit
DOC - Permit Expired12/4/201312/4/201312/4/2013PPASS
DetailsTony Young
Verify if occupied, post structure not approved for occupancy and expire permit.
Plan Reviewer's activity  7/17/2013 DONE
Sent an Email to Jon Swarthout explaining that he can request up to 2 extensions before the permit expires. If he does not respond by July 26, 2013, the permit will be expired. The work proposed under this permit can then be done under the future structural upgrade permit for lateral loads.
Telephone call  7/17/2013 DONE
Talked to Richard Honsinger, Architect. He said that they have a structural upgrade for lateral forces almost ready to be submitted. The submission is delayed because of funding. The work proposed under this permit could be included in the future structural upgrade permit.
Plan assigned to (DRS)8/17/20128/17/20121/3/2013 DEFR
DetailsDan Stuart
Failed 1st Review - TRICA - Project reassigned to Carl Westfall
Plan Reviewer's activity  12/5/2012 DONE
Sent e-mail to Richard Honsinger, Erstad Architects, concerning the letter of 11/28/12 from AHJ Engineers and reference to the 1997 UBC Abatement of Dangerous Buildings, Sec. 302 - Dangerous Building, conditions 4 and 16 appear to be applicable to this building in regards to engineers letter & concerns for structures ability to meet requirements for wind and seismic loads and as a dangerous building should not be occupied until engineering concerns have been adequately resolved.
Also sent copy to jason Blais, Building Official.
Plan Reviewer's activity  11/28/2012 DONE
Received letter from Craig Brasher, AHJ, describing his method of evaluation of structure and indicated the building is capable of resisting gravity loads at this time for use as an office. ASCE 31-03 was used to evaluate seimic and wind load capabilities for an existing building and determined that AHJ "cannot say that the building is capable of resisting the required wind and seismic loads." I reviewed the letter with Jason Blais, Building Official. Jason gave me a copy of the Sec. 302 - definitions of a Dangerous Building based on the 1997 UBC Abatement of Dangerous Building Code currently adopted by Boise. Sec. 302 - Dangerous Building, conditions #4 and #16 would appear to be applicable to this building based on the letter from the engineering firm and occupancy & use cannot be allowed.
A copy of the engineering letter was copied to Richard Honsinger, project architect.
Plan Reviewer's activity  11/26/2012 DONE
The roof structure upgrade of the west half of the building, BLD12- has been finaled. I talked with Craig Brasher, AHJ Engineers to see where they were on the lateral analysis for the Trica building and if he would be willing to send us a letter indicating the building was structurally safe to occupy in this limited use for the office and the restroom. Craig reviewed concerns over the buildings capability to resist earthquake or wind loads at this time and felt he could not issue a letter indicating occupancy use would be okay. I ask him to provide a letter addressing the issues and concerns.
Routing - PLAN CHECK10/12/2012 11/21/2012 PEND
DetailsDan Stuart
Structural roof upgrade and roofing permit completed. Need letter from structural engineer of record stating in his opinion it is structurally safe to allow the limited office and restroom use proposed. Copy set to Richard Honsinger, architect.
Plan resubmittals requested  11/21/2012 DONE
Copy of plan review comments emailed to Richard Honsinger @ erstad architects.
Routing - FIRE10/8/2012 10/12/2012 PASS
DetailsScott Arellano
No comments attached.
1st review completed  10/12/2012 FAIL
Failed plan check.
Routing - PLAN CHECK8/22/2012 10/8/2012 PEND
DetailsDan Stuart
Inserted plan resubmittals into plans. Issuance of permit and occupancy use of the select portion of the building for administrative office and restroom is pending a structural analysis review of the facility for floor loads and lateral loading requirements for the facility to be based on hte final determination of the occupancy use(s).
Plan resubmittals received  10/4/2012  
Received 2 copies of sheets a2.01, a3.12 and taken to Dan Stuart
Telephone call  8/22/2012 DONE
DetailsDan Stuart
Talked with Richard concerning missing data. He will resubmit modified plans.
Routing - PLANNING8/20/2012 8/22/2012 PASS
DetailsCody Riddle
Cody Riddle - CUP09-00055
Routing - Design Review  8/22/2012 PASS
DetailsMatthew A Halitsky
Matt Halitsky - DRH09-00225
Routing - PLAN CHECK8/21/2012 8/22/2012 FAIL
DetailsDan Stuart
Plan use areas incorrectly labeled, accessible restroom elevations and details not provided; door sizes not indicated and analysis, evaluation and details for structural upgrades required for building required before any occupancy use of the office area and restroom can be allowed.
The modifications to the proposed office area have been completed without permit or inspection. The field inspector will determine what if any construction needs to be removed to allow necessary inspections.
Routing - PUBLIC WORKS8/17/2012 8/20/2012 PASS
DetailsConnie Baumgartner
Routing PW Sewer Rating8/20/2012 8/20/2012 PASS
DetailsConnie Baumgartner
Routing - Addressing8/17/2012 8/17/2012 PASS
DetailsTerry Records
Plans ACCEPTED BY PLAN TECH  8/17/2012 DONE
DetailsChristina Prado
Intake Approval  8/17/2012 PASS
DetailsTim L. Woodard
Recd Pcfee & Taken To Pln CK  8/17/2012 DONE
DetailsChristina Prado
Pending Assignment by JCB8/17/2012 8/17/2012 DONE
DetailsJason Blais
Application received 8/16/2012