Print Statement | | | 6/12/2013 | | DONE |
|
|
|
|
First Notice | | 5/23/2013 | 6/4/2013 | | DONE |
Christina Prado
|
|
|
mailed 6-4-13/// completed 6-12-13
|
FIRE-Final Inspection | 5/10/2013 | 5/13/2013 | 5/13/2013 | A | PASS |
Troy Cobbley
|
|
|
life safety passed
|
Permanent Occupancy | | | 5/13/2013 | | DONE |
|
|
|
|
Permanent Occupancy | | | 5/13/2013 | | DONE |
|
|
|
|
FIRE-Final Inspection | 4/26/2013 | 4/26/2013 | 4/26/2013 | P | CANC |
Troy Cobbley
|
|
|
Dillon Phone #: ###-#### -- cancelled per Dillon 4/26/13 @ 12:16, I called Troy and told him insp was cancelled//leg
|
FIRE-Final Inspection | 4/23/2013 | 4/24/2013 | 4/24/2013 | A | FAIL |
Troy Cobbley
|
|
|
the remote annunciators are still not the correct ones.
|
Zoning Approval | 4/24/2013 | 4/24/2013 | 4/24/2013 | | DONE |
Joshua Johnson
|
|
|
|
BLD-Final | 4/22/2013 | 4/23/2013 | 4/23/2013 | P | PASS |
Tom Arcoraci
|
|
|
dillon Phone #: ###-####
|
FIRE-Final Inspection | 4/22/2013 | 4/23/2013 | 4/23/2013 | A | PART |
Troy Cobbley
|
|
|
A temporary occupancy is being given with Romeo's permission until the audible alarms are installed for the remote duct detector annunciators.
|
Temporary Occupancy | 4/23/2013 | 7/22/2013 | 4/23/2013 | | DONE |
Christina Prado
|
|
|
|
BLD-Final | 4/18/2013 | 4/19/2013 | 4/19/2013 | P | NR |
Tom Arcoraci
|
|
|
Dillon Phone #: ###-####
|
FIRE-Final Inspection | 4/16/2013 | 4/19/2013 | 4/19/2013 | A | FAIL |
Troy Cobbley
|
|
|
Provide occupant load sign for "75" and mount at the main exit, provide building address of min. 4" of a contrasting color, relocate the ABC fire extinguisher to 75' of all points of the building, repair the emergency lighting in the kitchen area, provide correct remote annunciator for the duct smoke detectors per IMC 606.4.1 ex #2 (did not have audible and visible alarm), hood suppression system did not function.
|
BLD-Ceiling Grid Inspection | 4/16/2013 | 4/17/2013 | 4/17/2013 | A | PASS |
Tom Arcoraci
|
|
|
dillan Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 4/10/2013 | 4/11/2013 | 4/11/2013 | A | PASS |
Tom Arcoraci
|
|
|
dillon Phone #: ###-####
|
BLD-Energy code compliance | 3/8/2013 | 3/11/2013 | 3/11/2013 | A | PASS |
Tom Arcoraci
|
|
|
Dillon Phone #: ###-####
|
DOC - Permit Finaled | 3/11/2013 | 3/11/2013 | 3/11/2013 | P | PASS |
Tom Arcoraci
|
|
|
(This activity was added in error so we have changed the case status back to Issued.)
|
BLD-Framing/Rough-in | 3/4/2013 | 3/4/2013 | 3/4/2013 | P | PASS |
Tom Arcoraci
|
|
|
Dylan Phone #: ###-####
|
BLD-Framing/Rough-in | 2/14/2013 | 2/14/2013 | 2/14/2013 | P | PASS |
Tom Arcoraci
|
|
|
Fire blocking - Dillon Phone #: ###-####
|
BLD-Framing/Rough-in | 2/5/2013 | 2/6/2013 | 2/6/2013 | P | PASS |
Tom Arcoraci
|
|
|
Shear inspection please-Dillon Phone #: ###-####
|
(F) Reprint permit | | | 12/4/2012 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 12/4/2012 | | DONE |
|
|
|
|
Plan assigned to (JCM) | 11/28/2012 | 11/28/2012 | 12/3/2012 | | PASS |
John Menard
|
|
|
|
Routing - PLAN CHECK | 11/28/2012 | | 12/3/2012 | | PASS |
John Menard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/3/2012 | | DONE |
John Menard
|
|
|
|
Print Occupancy Form | | | 12/3/2012 | | DONE |
Christina Prado
|
|
|
|
Telephone call | | | 12/3/2012 | | DONE |
|
|
|
emailed richard permit ready fees due
|
Override - Parcel Holds | | | 12/3/2012 | | |
|
|
|
|
Permit Ready to Issue | | | 12/3/2012 | | DONE |
|
|
|
|
Routing Off Site - STRUCTURAL | 11/28/2012 | | 11/30/2012 | | PASS |
John Menard
|
|
|
called Action Couriers for pick up /plan mod - Received letter approving plan modification. JCM
|
Plan Modification Accepted | | | 11/28/2012 | | DONE |
|
|
|
Plan Mod rec'd to modify roof framing - sheets s2.00; s4.00; s5.00; s5.01
|
Issue PAID IN FULL permit | | | 10/29/2012 | | DONE |
Tisha Gallop
|
|
|
|
Plan assigned to (JCM) | 8/17/2012 | | 10/26/2012 | | PASS |
John Menard
|
|
|
|
Routing - PLAN CHECK | 10/25/2012 | | 10/26/2012 | | PASS |
John Menard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/26/2012 | | DONE |
John Menard
|
|
|
|
Print Occupancy Form | | | 10/26/2012 | | DONE |
Christina Prado
|
|
|
|
Telephone call | | | 10/26/2012 | | DONE |
|
|
|
LM permit ready fees given, need ACHD, GC form
|
Permit Ready to Issue | | | 10/26/2012 | | |
|
|
|
|
Routing - PLAN CHECK | 9/24/2012 | | 10/25/2012 | | |
John Menard
|
|
|
|
Routing - PLANNING | 10/25/2012 | | 10/25/2012 | | PASS |
Josh Wilson
|
|
|
Recorded License Agreement for NMID easement received
|
Plan resubmittals received | | | 10/4/2012 | | |
|
|
|
Received a letter to Jason Blais from Richard Honsinger dated 10-4-12 along with addendum to license agreement, Nampa & Meridian Irrigation District2 pg letter dated 9-10-12-given to Jason Blais
|
Route to Impact Fee Review | 9/19/2012 | 9/24/2012 | 9/25/2012 | | PASS |
Cindy M. Gould
|
|
|
|
Plan Reviewer's activity | | | 9/25/2012 | | PASS |
John Menard
|
|
|
Reviewed and approved structural and nonstructural plan revisions. JCM
|
Routing - FIRE | 9/19/2012 | 9/19/2012 | 9/24/2012 | | PASS |
Scott Arellano
|
|
|
Attached IFC comments to plans.
|
1st review completed | | | 9/24/2012 | | FAIL |
|
|
|
Failed Planning, Public Works & Structural Review.
|
Plan resubmittals received | | | 9/21/2012 | | |
|
|
|
9-21-12 received 3 structural calcs and 3 copies of sheets S5.01,S5.00,S4.00,S2.00,S3.00 installed by Karie form MCClendon Eng
|
Plan resubmittals received | | | 9/20/2012 | | |
|
|
|
Received 1 plan review response comments letter dated 9-20-12 to JOhn Menard from Richard Honsinger, 1 copy of manufacturers specs on Kool Star Walk, 2 copies of sheets A101, A301, A302, A303, A501, A601 all inserted by Architects office and taken back to fire where I borrowed them from to insert into//BAS
|
Plan resubmittals requested | | | 9/19/2012 | | DONE |
John Menard
|
|
|
E-mailed the architect a copy of the plan review requesting revisions. JCM
|
Routing - PLAN CHECK | 9/12/2012 | | 9/19/2012 | | FAIL |
John Menard
|
|
|
|
Plan resubmittals requested | | | 9/17/2012 | | DONE |
John Menard
|
|
|
E-mailed the architect a copy of the structural review requesting revisions. JCM
|
Routing - PUBLIC WORKS | 9/12/2012 | | 9/12/2012 | | PASS |
Connie Baumgartner
|
|
|
|
Routing PW Drainage | 9/12/2012 | | 9/12/2012 | | PASS |
Brian Murphy
|
|
|
|
Routing - PLAN CHECK | 8/29/2012 | | 9/12/2012 | | |
John Menard
|
|
|
|
Plan resubmittals received | | | 9/7/2012 | | |
|
|
|
9-7-12 received 2 copies of sheets C1.0,C2.0,C3.0 & 3 copies of sheets C1.0,C2.0,C3.0 & C4.0 inserted by Lance Warnick from Aspen Eng sent to John M.
|
Routing Off Site - STRUCTURAL | 8/17/2012 | | 8/31/2012 | | FAIL |
John Menard
|
|
|
Received comment list from consulting engineer requesting revisions. JCM
|
Routing - PLANNING | 8/28/2012 | | 8/29/2012 | | FAIL |
Josh Wilson
|
|
|
DRH12-00164 JGW-FAIL, CUP12-00032 JEJ- FAIL- Applicant has not submitted an executed license agreement with NMID allowing the encroachments into the irrigation easement. Applicant contacted 8/29.
|
Routing - PLUMBING | 8/27/2012 | | 8/28/2012 | | PASS |
Daryl Spivey
|
|
|
Per plans and 2003 UPC.
|
Routing - Erosion and Sediment | 8/24/2012 | | 8/27/2012 | | PASS |
Kimberly M. Johnson
|
|
|
Approved per conditions
|
Routing - PUBLIC WORKS | 8/20/2012 | | 8/24/2012 | | FAIL |
Connie Baumgartner
|
|
|
Failed by Brian Murphy
|
Routing PW Solid Waste | | | 8/24/2012 | | PASS |
Peter J. McCullough
|
|
|
|
Routing PW Drainage | 8/22/2012 | | 8/23/2012 | | FAIL |
Brian Murphy
|
|
|
catch basin in small wash area may need to go to sewer
|
Routing PW Sewer Rating | 8/21/2012 | | 8/22/2012 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - Addressing | 8/21/2012 | | 8/21/2012 | | PASS |
April Wing
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 8/20/2012 | | DONE |
|
|
|
|
Routing - PLANNING Land Div | 8/20/2012 | | 8/20/2012 | | PASS |
Todd Tucker
|
|
|
|
Application received | | 8/17/2012 | 8/17/2012 | | DONE |
|
|
|
|
Pending Assignment by JCM | 8/17/2012 | | 8/17/2012 | | DONE |
John Menard
|
|
|
|