BLD-Final | 6/12/2014 | 6/12/2014 | 6/12/2014 | A | NR |
Mike Jordan
|
|
|
debbie Phone #: ###-####. Needs trades final and modify scope of work to delete master suite additon.
|
BLD-Conference | 5/14/2014 | 5/15/2014 | 5/15/2014 | A | PEND |
Tony Young
|
|
|
status?
|
BLD-Framing/Rough-in | 6/21/2013 | 6/21/2013 | 6/21/2013 | P | PASS |
Tony Young
|
|
|
fire rated soffit Phone #: ###-####,, fire rated plywood and caulked joints,, ok
|
BLD-Energy code compliance | 5/31/2013 | 5/31/2013 | 5/31/2013 | P | PASS |
Tony Young
|
|
|
Christopher Phone #: ###-####
|
BLD-Framing/Rough-in | 5/28/2013 | 5/29/2013 | 5/29/2013 | P | PASS |
Tony Young
|
|
|
eric Phone #: ###-####,, ok to insulate
|
Routing Walk-In (BLD) | 5/21/2013 | 5/21/2013 | 5/21/2013 | A | PASS |
Perry Paine
|
|
|
correction notice questions
called 316 to verify
|
BLD-Framing/Rough-in | 5/20/2013 | 5/20/2013 | 5/20/2013 | P | FAIL |
Jim Sly
|
|
|
Eric Phone #: ###-#### Misc. Corrections......Posted.
|
Routing - MECHANICAL | 5/16/2013 | | 5/16/2013 | | PASS |
Troy James
|
|
|
manual j report, duct blast and air balance not required.
|
BLD-Framing/Rough-in | 4/16/2013 | 4/17/2013 | 4/17/2013 | A | NR |
Tony Young
|
|
|
request after 10:30//Debbie Spoja Phone #: ###-####,, walk through only
|
BLD-Foundation | 10/9/2012 | 10/10/2012 | 10/10/2012 | A | PART |
Tony Young
|
|
|
cody Phone #: ###-####,, w . in progress
|
BLD-Footing | 10/4/2012 | 10/4/2012 | 10/4/2012 | P | PASS |
Tony Young
|
|
|
Phone #: ###-####,, ok now
|
Routing PW Grading-Hillside | 10/3/2012 | | 10/3/2012 | | PASS |
Jim Wyllie
|
|
|
Received inspection report for footing subgrade soils. Okay to schedule a footing inspection. Placement of footings shall conform to recomendations contained in the inspection report by MTI. Jim Wyllie (###-####)
|
BLD-Footing | 9/28/2012 | 9/28/2012 | 10/1/2012 | P | NR |
Tony Young
|
|
|
cody Phone #: ###-####
|
BLD-Footing | 9/27/2012 | 9/27/2012 | 9/28/2012 | P | PEND |
Tony Young
|
|
|
cody Phone #: ###-####
|
BLD-Footing | 9/26/2012 | 9/27/2012 | 9/27/2012 | A | PEND |
Tony Young
|
|
|
cody Phone #: ###-####,, need soils/hillside
|
BLD-Footing | 9/25/2012 | 9/26/2012 | 9/26/2012 | A | NR |
Tony Young
|
|
|
cody Phone #: ###-####,, needs soils report
|
BLD-Footing | 9/24/2012 | 9/25/2012 | 9/25/2012 | P | PEND |
Tony Young
|
|
|
cody Phone #: ###-####,,, needs soil report for hillside 1st
|
Routing Walk-In (BLD) | 9/5/2012 | 9/5/2012 | 9/5/2012 | P | PASS |
Perry Paine
|
|
|
attach plans to permit for ADA county
|
Permit Ready to Issue | | | 8/30/2012 | | |
|
|
|
|
Telephone call | | | 8/30/2012 | | |
|
|
|
8-30-12 called Debbie permit ready and fee given ///dld
|
Issue PAID IN FULL permit | | | 8/30/2012 | | DONE |
Tisha Gallop
|
|
|
|
Routing - Erosion and Sediment | 8/28/2012 | | 8/29/2012 | | PASS |
Kimberly M. Johnson
|
|
|
Approved per conditions
|
Plan resubmittals received | | | 8/28/2012 | | DONE |
Christina Prado
|
|
|
Received two sets of ESC plan sheet ESC-1 as well as two sets ESC Control Plan documents. Routed to Kim for review
|
Plan assigned to (PEP) | 8/22/2012 | 8/22/2012 | 8/22/2012 | | PASS |
Perry Paine
|
|
|
|
Routing Walk-In (BLD) | 8/21/2012 | 8/21/2012 | 8/22/2012 | P | DONE |
Perry Paine
|
|
|
|
Case Summary (BLD) | | | 8/22/2012 | | |
|
|
|
|
Inspection Record Card- Bld | | | 8/22/2012 | | |
|
|
|
|
1st review completed | | | 8/22/2012 | | DONE |
|
|
|
|
CHANGE STATUS TO (REV) | | | 8/22/2012 | | |
|
|
|
|
Routing - Erosion and Sediment | 8/22/2012 | | 8/22/2012 | | FAIL |
Kimberly M. Johnson
|
|
|
Waiver request denied on grounds that project exceeds 600 sq ft remodel and is on a hillside. Left message for contact provided on waiver request letter. Spoke with homeowner/applicant via telephone to notify.
|
Routing Walk-In (Zoning) | 8/21/2012 | 8/21/2012 | 8/21/2012 | P | PASS |
Colleen T Carroll
|
|
|
Revised plans submitted. No Hillside review needed per T.R.
|
Routing Walk-In (BLD) | 8/20/2012 | 8/20/2012 | 8/21/2012 | A | DONE |
Colleen T Carroll
|
|
|
Jim W determined that this will require a Hillside I Application
|
Routing Walk-In (PW Hillside) | | | 8/20/2012 | A | PASS |
|
|
|
footing subgrade must be approved by the applicants geotechnical engineer prior to scheduling footing inspection
|
Application received | | 8/20/2012 | | | |
|
|
|
|