Information based on query as of Friday, August 16, 2024.
Permit Information
Permit NumberBLD12-02210
StatusFinaled
Name RIVER QUARRY AT PARKCENTER LLC
Site Address 412 E PARKCENTER BLVD
Project NameRiver Quarry Bldg C
Customer Number 
ePlanReviewYes
Description
(FINCH AND ASSOCIATES – River Quarry Bldg C – Ste# 210) This building is fire sprinklered for area increase. Permit is to remodel an existing 1,655 square foot office space. Work is to include: construction of new non-bearing partition wall to create: a private office, light switching, installation of new accessible doors / hardware, new plumbing, and interior finishes. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **TLW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice 10/28/201210/30/2012 DONE
First Notice 9/24/201210/18/2012 DONE
e-mailed to Scott Schoenherr.
BLD-Final9/13/20129/14/20129/14/2012APASS
DetailsJim Storey
Ben Phone #: ###-####
Permanent Occupancy  9/14/2012 DONE
CHANGE STATUS TO (FNL)  9/14/2012 DONE
DetailsDarla L Downs
FIRE-Final Inspection9/12/20129/13/20129/13/2012APASS
DetailsTroy Cobbley
life safety passed.
BLD-Framing/Rough-in8/30/20128/30/20128/30/2012PPASS
DetailsJim Storey
Ben Phone #: ###-####
Issue PAID IN FULL permit  8/27/2012 DONE
DetailsChristina Prado
Print Occupancy Form  8/27/2012 DONE
DetailsChristina Prado
Intake Approval  8/23/2012 PASS
DetailsTim L. Woodard
Plans ACCEPTED BY PLAN CHECK  8/23/2012 DONE
DetailsTim L. Woodard
Plan assigned to (TLW)8/23/2012 8/23/2012 PASS
DetailsTim L. Woodard
Routing - PLAN CHECK8/23/2012 8/23/2012 PASS
DetailsTim L. Woodard
1st review completed  8/23/2012 DONE
DetailsTim L. Woodard
PLANS/APPL TAKEN TO FRONT DESK  8/23/2012 DONE
DetailsTim L. Woodard
Permit Ready to Issue  8/23/2012 DONE
DetailsChristina Prado
Telephone call  8/22/2012 DONE
DetailsChristina Prado
Sent email to Doug advising plan review fees are due
Application received  8/20/2012 DONE
Application submitted via PDS Online on Aug 20 2012 4:08PM