BLD-Other | 4/2/2013 | 4/3/2013 | 4/3/2013 | A | PASS |
Bob Archibald
|
|
|
Scott-verify for bond release- driveway and sidewalk Phone #: ###-####. Driveway and sidewalk in place. Ok for bond release.
|
DOC - C/O Approved | | | 4/3/2013 | | DONE |
Barbara Stitt
|
|
|
|
BLD-Final | 2/26/2013 | 3/1/2013 | 3/1/2013 | A | PASS |
Jim Storey
|
|
|
Access code to garage is 0813. May be bonding over on concrete driveway/walkway. Thanks Scott Phone #: ###-#### >> Inspection requested via web by Scott Zierler Bond posted on 2/28/13
|
BLD-Framing/Rough-in | 11/28/2012 | 11/29/2012 | 11/29/2012 | P | PASS |
Jim Sly
|
|
|
Reinspection. Additional documentation on site for repair. Web stiffeners are the fix from Boise Cascade. Thx. Scott Phone #: ###-#### >> Inspection requested via web by Scott Zierler
|
BLD-Framing/Rough-in | 11/26/2012 | 11/27/2012 | 11/27/2012 | P | FAIL |
Tom Arcoraci
|
|
|
Plans on top of.fireplace. Phone #: ###-#### >> Inspection requested via web by Scott Zierler correction notice on site
|
BLD-Energy code compliance | 11/26/2012 | 11/27/2012 | 11/27/2012 | P | CANC |
Tom Arcoraci
|
|
|
Thx. Phone #: ###-#### >> Inspection requested via web by Scott Zierler
|
BLD-Energy code compliance | 11/26/2012 | 11/27/2012 | 11/26/2012 | A | CANC |
Jim Storey
|
|
|
Plans above fireplace. Thx Scott Phone #: ###-#### >> Inspection requested via web by Scott Zierler Inspection cancelled from web by: Scott Zierler
|
BLD-Wall Bracing | 11/6/2012 | 11/7/2012 | 11/7/2012 | P | PASS |
Jim Storey
|
|
|
Framer will be onsite with plans. Thanks! Scott Phone #: ###-#### >> Inspection requested via web by Scott Zierler
|
BLD-Foundation | 9/25/2012 | 9/27/2012 | 9/27/2012 | A | PASS |
Jim Sly
|
|
|
Phone #: 2085739589 >> Inspection requested via mobile web by Ricardo
|
BLD-Footing | 9/25/2012 | 9/26/2012 | 9/27/2012 | P | PART |
Dave Hannah
|
|
|
Phone #: 2085739589 >> Inspection requested via mobile web by Ricardo crew on site setting forms set backs and soil ok
|
Issue PAID IN FULL permit | | | 9/21/2012 | | DONE |
Barbara Stitt
|
|
|
|
OVERRIDE | | | 9/20/2012 | | |
|
|
|
|
Plan assigned to (CDM) | 8/21/2012 | 8/21/2012 | 9/20/2012 | | PASS |
Carl D Madsen
|
|
|
|
1st review completed | | | 9/20/2012 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 9/20/2012 | | 9/20/2012 | | PASS |
Carl D Madsen
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/20/2012 | | |
|
|
|
|
Inspection Record Card- Bld | | | 9/20/2012 | | DONE |
Christina Prado
|
|
|
|
Permit Ready to Issue | | | 9/20/2012 | | DONE |
Tisha Gallop
|
|
|
|
Telephone call | | | 9/20/2012 | | DONE |
Tisha Gallop
|
|
|
called Scott/Prestige Homes and left vm permit is ready and fee.
|
Case Summary (BLD) | | | 9/17/2012 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 8/28/2012 | | 9/17/2012 | | FAIL |
Carl D Madsen
|
|
|
Wall bracing. Met with Scott with Prestige 9-17-12 CDM
|
Routing - MECHANICAL | 8/28/2012 | | 8/28/2012 | | PASS |
Troy James
|
|
|
|
Routing - MECHANICAL | 8/23/2012 | | 8/24/2012 | | FAIL |
Troy James
|
|
|
emailed correction to Ultimate heating
|
Route to Impact Fee Review | 8/21/2012 | 8/24/2012 | 8/23/2012 | | PASS |
Cindy M. Gould
|
|
|
|
Routing - PLANNING | 8/22/2012 | | 8/23/2012 | | PASS |
Susan Riggs
|
|
|
|
Routing - PUBLIC WORKS | 8/21/2012 | | 8/22/2012 | | PASS |
Connie Baumgartner
|
|
|
|
Application received | | 8/21/2012 | 8/21/2012 | | DONE |
Barbara Stitt
|
|
|
|
Routing - Addressing | 8/21/2012 | | 8/21/2012 | | PASS |
Terry Records
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 8/21/2012 | | DONE |
Barbara Stitt
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 8/21/2012 | | DONE |
Barbara Stitt
|
|
|
|
Intake Approval | | | 8/21/2012 | | PASS |
Barbara Stitt
|
|
|
|