First Notice | 2/22/2013 | 2/22/2013 | 3/22/2013 | | DONE |
Jim Storey
|
|
|
|
BLD-Final | 2/22/2013 | 2/22/2013 | 2/22/2013 | A | PASS |
Jim Storey
|
|
|
|
DOC - Permit Finaled | 2/22/2013 | 2/22/2013 | 2/22/2013 | P | PASS |
Jim Storey
|
|
|
|
FIRE-Final Inspection | 2/21/2013 | 2/22/2013 | 2/22/2013 | A | PASS |
Jim Storey
|
|
|
*Re-assigned by Scott Arellano due to personnel absence*
*Life Safety Phone #: ###-#### >> Inspection requested via web by john white
|
DOC - Permit Finaled | 2/22/2013 | 2/22/2013 | 2/22/2013 | P | PASS |
Jim Storey
|
|
|
|
BLD-Conference | 12/5/2012 | 12/6/2012 | 12/6/2012 | A | NH |
Jim Storey
|
|
|
Phone #: ###-#### >> Inspection requested via web by Greg Kirkes
|
Issue & PRINT to be Invoiced | | | 9/6/2012 | | DONE |
Barbara Stitt
|
|
|
|
Application received | | | 8/23/2012 | | DONE |
|
|
|
This permit was created on the web by Paul Marcolina
|
Plan assigned to (DRS) | 8/23/2012 | 8/23/2012 | 8/23/2012 | | PASS |
Dan Stuart
|
|
|
|
Routing - PLAN CHECK | 8/23/2012 | | 8/23/2012 | | PASS |
Dan Stuart
|
|
|
Plan red-lined to verify exit signage and illumination at new vestibule door that serves the TGM room and the NE basement stair enclosure exit.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/23/2012 | | PASS |
Dan Stuart
|
|
|
|
Routing - FIRE | | | 8/23/2012 | | PASS |
|
|
|
|
Plan assigned from Web | 8/23/2012 | 9/2/2012 | | | |
|
|
|
|