Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberBLD12-02262
StatusFinaled
Name ALPINE CONSTRUCTION INC
Site Address 755 W FRONT ST
Project NameBODO BLDG #7
Customer Number 
ePlanReviewYes
Description
(BODO BLDG #7 – Elevator Equipment Closet – Shell and Core North Side of Bulding) This building is fire sprinklered for area increase. Permit is to add an elevator equipment closet to the core area to serve the existing elevators. The new equipment is electrical control panels not new hoisting equipment. Work is to include: construction of 1 hour rated fire barriers to a new one hour rated floor ceiling assembly, miscellaneous electrical, miscellaneous mechanical, installation of new accessible 90 min doors / hardware, and interior finishes. . This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **TLW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice 2/7/20131/30/2013 DONE
DetailsChristina Prado
complete 01-30
First Notice1/11/20131/11/20131/28/2013 DONE
DetailsDave Hannah
mailed 1/29/13
Letter of compliance/Occupancy  1/28/2013 DONE
DetailsBarbara Stitt
FIRE-Final Inspection1/11/20131/11/20131/14/2013PPASS
DetailsForrest France
Fire life safety passed.
BLD-Final1/11/20131/11/20131/11/2013PPASS
DetailsDave Hannah
Mel Phone #: ###-####
DOC - Permit Finaled1/11/20131/11/20131/11/2013PPASS
DetailsDave Hannah
BLD-Final10/9/201210/10/201210/10/2012ACANC
DetailsDave Hannah
call 20 min before//Mel Phone #: ###-####
FIRE-Final Inspection10/9/201210/9/201210/9/2012PCANC
DetailsForrest France
call 20 min before//Mel Phone #: ###-####
BLD-Framing/Rough-in9/18/20129/19/20129/19/2012APASS
DetailsDave Hannah
mel please call 30 min before going out Phone #: ###-####
Inspection Record Card- Bld  9/18/2012 DONE
DetailsChristina Prado
Permit Ready to Issue  9/18/2012 DONE
DetailsChristina Prado
Issue PAID IN FULL permit  9/18/2012 DONE
DetailsChristina Prado
1st review completed  9/14/2012 DONE
DetailsTim L. Woodard
PLANS/APPL TAKEN TO FRONT DESK  9/14/2012 DONE
DetailsTim L. Woodard
Plan assigned to (TLW)8/30/2012 9/14/2012 PASS
DetailsTim L. Woodard
Routing - PLAN CHECK8/30/2012 9/14/2012 PASS
DetailsTim L. Woodard
Routing - FIRE8/30/2012 8/31/2012 PASS
DetailsScott Arellano
No separate review comments attached. A separate fire sprinkler permit will be required.
Intake Approval  8/30/2012 PASS
DetailsTim L. Woodard
Intake Approval  8/24/2012 FAIL
DetailsTim L. Woodard
Provide penatration details for new equipments electical and mechanical penatrations. Revise certificate of value to reflect new equipment costs.

Contact Tim Woodard
###-#### with any questions.
Application received  8/23/2012 DONE
Application submitted via PDS Online on Aug 23 2012 4:43PM