BLD-Final | 12/12/2012 | 12/13/2012 | 12/13/2012 | A | PASS |
Jim Sly
|
|
|
please call 30min prior - Clint Phone #: ###-####
|
DOC - Permit Finaled | 12/13/2012 | 12/13/2012 | 12/13/2012 | P | PASS |
Jim Sly
|
|
|
|
BLD-Energy code compliance | 9/21/2012 | 9/24/2012 | 9/24/2012 | P | PASS |
Jim Sly
|
|
|
Clint Phone #: ###-####
|
BLD-Framing/Rough-in | 9/20/2012 | 9/21/2012 | 9/21/2012 | A | PASS |
Jim Sly
|
|
|
call 1/2 hr before so can meet you//Clint Phone #: ###-####
|
BLD-Energy code compliance | 9/7/2012 | 9/7/2012 | 9/7/2012 | P | PART |
Jim Sly
|
|
|
Clint Phone #: ###-#### Under floor vapor barrier and insulation......OK.
|
BLD-Footing | 9/4/2012 | 9/4/2012 | 9/4/2012 | P | PASS |
Jim Sly
|
|
|
Clint Phone #: ###-#### Pads for point loads.....Girder trusses.
|
BLD-Conference | 8/28/2012 | 8/28/2012 | 8/28/2012 | P | PASS |
Jim Storey
|
|
|
clint - call 1 hour prior to meet Phone #: ###-#### found no ft on south side of exsisting bldg will only need ft on this side// will call for insp. soon
|
Routing Walk-In (Zoning) | 8/24/2012 | 8/24/2012 | 8/24/2012 | P | PASS |
Joshua Johnson
|
|
|
|
Routing Walk-In (BLD) | 8/24/2012 | 8/24/2012 | 8/24/2012 | P | DONE |
Perry Paine
|
|
|
|
Plan assigned to (PEP) | 8/24/2012 | 8/24/2012 | 8/24/2012 | | PASS |
Perry Paine
|
|
|
|
Case Summary (BLD) | | | 8/24/2012 | | |
|
|
|
|
Inspection Record Card- Bld | | | 8/24/2012 | | |
|
|
|
|
1st review completed | | | 8/24/2012 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/24/2012 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 8/24/2012 | | DONE |
Tisha Gallop
|
|
|
|
Issue PAID IN FULL permit | | | 8/24/2012 | | DONE |
Tisha Gallop
|
|
|
|
Application received | | 8/24/2012 | | | |
|
|
|
|