Permanent Occupancy | | | 10/5/2012 | | DONE |
Barbara Stitt
|
|
|
|
Temporary Occupancy | 9/28/2012 | 12/27/2012 | 9/28/2012 | | DONE |
Tisha Gallop
|
|
|
pending electrical
|
BLD-Final | 9/27/2012 | 9/27/2012 | 9/27/2012 | P | PASS |
Mike Jordan
|
|
|
Temo Phone #: ###-####
|
BLD-Final | 9/25/2012 | 9/26/2012 | 9/26/2012 | P | NR |
Mike Jordan
|
|
|
Temo Phone #: ###-####. Fire/life/safety failed.
|
FIRE-Final Inspection | 9/26/2012 | 9/27/2012 | 9/26/2012 | A | PASS |
Troy Cobbley
|
|
|
life safety passed
|
FIRE-Final Inspection | 9/25/2012 | 9/26/2012 | 9/26/2012 | A | FAIL |
Troy Cobbley
|
|
|
Remove the thumbturn lock on the main exit (keyed is ok), repair the exit sign at the main exit, provide annual inspection for the fire extinguisher, provide sprinkler protection or remove the ceiling in the new closet, provide single action hardware or remove the door to the new closet, remove the thumbturn lock on the rear exit and provide single action hardware as discussed.
|
Issue PAID IN FULL permit | | | 9/19/2012 | | DONE |
|
|
|
|
Plan assigned to (TLW) | 8/27/2012 | | 8/30/2012 | | PASS |
Tim L. Woodard
|
|
|
|
Routing - PLAN CHECK | 8/27/2012 | | 8/30/2012 | | PASS |
Tim L. Woodard
|
|
|
Tim Woodard
|
1st review completed | | | 8/30/2012 | | DONE |
Tim L. Woodard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/30/2012 | | DONE |
Tim L. Woodard
|
|
|
|
Case Summary (BLD) | | | 8/30/2012 | | DONE |
Tim L. Woodard
|
|
|
|
Print Occupancy Form | | | 8/30/2012 | | DONE |
Tisha Gallop
|
|
|
|
Permit Ready to Issue | | | 8/30/2012 | | DONE |
Tisha Gallop
|
|
|
|
Telephone call | | | 8/30/2012 | | DONE |
Tisha Gallop
|
|
|
called Emily and left vm permit is ready.
|
Application received | | 8/27/2012 | 8/27/2012 | | DONE |
Barbara Stitt
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 8/27/2012 | | DONE |
Barbara Stitt
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 8/27/2012 | | DONE |
Barbara Stitt
|
|
|
|
First Notice | | 10/15/2012 | | | |
|
|
|
|