Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD12-02293
StatusFinaled
Name TAHOE HOMES LLC
Site Address 2846 S TRAILWOOD WAY
Project Name 
Customer Number 
ePlanReviewYes
Description
Permit for the construction of a new 2,256 sq. ft., two story (first story 1,494 sq. ft., second story 1,032 sq. ft.) single family dwelling with 3 bedrooms, 2 1/2 bathrooms, approximately322 sq. ft. of covered patio/porch and a 823 sq. ft. attached garage per the approved plans, plan review report, any notations and the attached engineering. SP-01 zoning and setbacks per planning. CDM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Conference6/6/20136/7/20136/7/2013APASS
DetailsMike Jordan
garage code is 1979 Phone #: ###-#### >> Inspection requested via web by Clint Wall
DOC - Permit Finaled6/7/20136/7/20136/7/2013PPASS
DetailsMike Jordan
BLD-Energy code compliance4/8/20134/9/20134/9/2013APASS
DetailsDave Hannah
Phone #: ###-#### >> Inspection requested via web by Clint Wall
BLD-Framing/Rough-in4/5/20134/5/20134/8/2013PPASS
DetailsDave Hannah
clint Phone #: ###-####
BLD-Framing/Rough-in4/4/20134/5/20134/5/2013AFAIL
DetailsDave Hannah
Phone #: ###-#### >> Inspection requested via web by Clint Wall no elec rough in ,seal package plans or truss engin. no inspection done.
BLD-Wall Bracing3/15/20133/15/20133/15/2013PPASS
DetailsDave Hannah
Joey ###-####
BLD-Framing/Rough-in3/14/20133/15/20133/15/2013APASS
DetailsDave Hannah
Joey Phone #: ###-####
BLD-Foundation2/7/20132/7/20132/8/2013PPASS
DetailsDave Hannah
Phone #: ###-####
BLD-Footing2/6/20132/6/20132/6/2013PPASS
DetailsDave Hannah
Avaro Phone #: ###-####
Issue PAID IN FULL permit  10/8/2012 DONE
DetailsTisha Gallop
OVERRIDE  10/1/2012  
Plan assigned to (CDM)8/28/20128/28/201210/1/2012 PASS
DetailsCarl D Madsen
Inspection Record Card- Bld  10/1/2012 DONE
DetailsTisha Gallop
Routing - PLAN CHECK10/1/2012 10/1/2012 PASS
DetailsCarl D Madsen
PLANS/APPL TAKEN TO FRONT DESK  10/1/2012  
Permit Ready to Issue  10/1/2012 DONE
DetailsTisha Gallop
batched stamped
Routing - PLANNING9/28/2012 9/28/2012 PASS
DetailsDavid Moser
Approved as redlined; the eave shall not encroach more than 2 feet into side setback
Routing - PLANNING9/17/2012 9/17/2012 FAIL
DetailsDavid Moser
Eave still extends into side yard setback 2.5 feet. The applicant did not change the front building elevations.
Routing - PLAN CHECK  9/6/2012 FAIL
Wall bracing
1st review completed  9/6/2012 FAIL
Routing - MECHANICAL  8/30/2012 PASS
Route to Impact Fee Review8/27/20128/30/20128/29/2012 PASS
DetailsCindy M. Gould
Application received 8/27/20128/29/2012 DONE
Payment Received  8/28/2012 DONE
Payment received via Govolutions
Intake Approval  8/28/2012 PASS
Routing - Addressing8/28/2012 8/28/2012 PASS
DetailsTerry Records
Routing - PUBLIC WORKS8/28/2012 8/28/2012 PASS
DetailsConnie Baumgartner
Routing - PLANNING8/28/2012 8/28/2012 FAIL
DetailsDavid Moser
eave can not extend into side yard setback more than 2 feet