Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD12-02311
StatusFinaled
Name WEYERHAEUSER NR COMPANY
Site Address 2910 E AMITY RD
Project NameTrus Joist Marketing Foundatio
Customer Number 
ePlanReviewYes
Description
(Trus Joist - Marketing Foundation) This permit is to construct a 16 ft. by 16 ft. foundation in order to model actual conditions in the field and be able to show proper installation of there product. Trus Joist manufactures and produces floor joists. When the test case is complete the floor will be removed and the foundation will sit empty until a new test case is done. TLW
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Telephone call  7/11/2019 DONE
emailed Scott.Matthews@weyerhaeuser.com the final value (first notice) because it came back for the 2nd time. No info for the parcel owner so looked at the owner info and moved the info to parcel owner
Second Notice 6/20/20197/10/2019 DONE
mailed 7-11
First Notice5/14/20195/14/20196/10/2019 DONE
DetailsJim Storey
mailed 6-11
DOC - Permit Finaled5/14/20195/14/20195/14/2019PPASS
DetailsJim Storey
BLD-Footing9/21/20129/21/20129/21/2012PPASS
DetailsTom Arcoraci
Scott Phone #: ###-####
BLD-Foundation9/21/20129/21/20129/21/2012PPASS
DetailsTom Arcoraci
Scott Phone #: ###-####
OVERRIDE  9/21/2012  
Issue PAID IN FULL permit  9/21/2012 DONE
DetailsChristina Prado
Inspection Record Card- Bld  9/21/2012 DONE
DetailsChristina Prado
Permit Ready to Issue  9/21/2012 DONE
DetailsChristina Prado
Plan assigned to (TLW)9/18/2012 9/18/2012 DONE
DetailsTim L. Woodard
Routing - PLAN CHECK9/18/2012 9/18/2012 PASS
DetailsTim L. Woodard
1st review completed  9/18/2012 DONE
DetailsTim L. Woodard
PLANS/APPL TAKEN TO FRONT DESK  9/18/2012 DONE
DetailsTim L. Woodard
Routing - Erosion and Sediment9/6/2012 9/6/2012 PASS
DetailsKimberly M. Johnson
Waiver request approved.
Payment Received  9/5/2012 DONE
Payment received via Govolutions
Telephone call  9/5/2012  
9-5-12 sent Scott email that initial fee needs to be paid before permit can move on ///dld
Intake Approval  9/5/2012 PASS
DetailsTim L. Woodard
Intake Approval  8/30/2012 FAIL
DetailsTim L. Woodard
Please reupload drawings in compliance with the #518 Minor Tenant Improvement Checklist and the Electronic Submittal Guide. I will email both items to you for your review. A few things that I identified with a quick review would be the minimum size plan sheet is not met with the drawings, no engineering for the foundation or floor was submitted, site plan cannot be reused due to copy wright provisions attached to previous architects plans, upload the #518 checklist, upload form #304 Register Design Proffessional Form, Upload plan waiver letter for Erosion Sediment Control, Provide a cross section identifying j-bolts and sill plate connection, and a new cover sheet with all the items that are on the cover sheet submitted.

Call Tim Woodard or Perry Paine with questions;
###-#### (Tim) or ###-#### (Perry)
Application received  8/28/2012 DONE
Application submitted via PDS Online on Aug 28 2012 3:58PM