Information based on query as of Wednesday, July 24, 2024.
Permit Information
Permit NumberBLD12-02320
StatusFinaled
Name HOFFMAN CONSTRUCTION COMPANY
Site Address 1000 W MYRTLE ST
Project NameJUMP
Customer Number 
ePlanReviewNo
Description
JUMP - Superstructure - To construct the structural frame for a new 240,445 sq. ft., six story JUMP building over an existing underground concrete parking garage and related site improvements. The building structural frame will be constructed of concrete and steel structural elements. Work under this permit shall not proceed beyond the superstructure until final approval of plans and issuance of the next phase building permit. That permit has not yet been applied for. As owner or designated agent, I acknowledge that I am performing this work at my own risk without assurance that the permit for the entire building structure will be granted, and I agree to make any modifications to the building structure work as may be required to comply with the City Codes and the final approved building plans and conditions. Grading Permit: BLD12-00940; Underground Parking Garage Permit: BLD12-01330. All construction per the approved plans. JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
CHANGE STATUS TO (FNL)  10/16/2017 DONE
DetailsChristina Prado
Per passing inspections
Letter of compliance/Occupancy  10/16/2017 DONE
BLD-Final12/22/201612/22/201612/22/2016PPASS
DetailsDave Hannah
Requesting permit be finaled and closed. Phone #: ###-#### Inspection requested via web by Joe Borelli
BLD-Other6/25/20156/26/20156/26/2015APASS
DetailsDave Hannah
Nathan// rise run compliance on pioneer stairs Phone #: ###-####
BLD-Conference6/23/20156/23/20156/23/2015PDONE
DetailsDave Hannah
Requesting a consult meeting to discuss upcoming JUMP TCO plans. Please stop by the Hoffman Office.

Thanks,
Noelle Phone #: ###-#### Inspection requested via web by Noelle Idehara
BLD-Other6/16/20156/17/20156/17/2015APASS
DetailsDave Hannah
Pioneer Stairs ONLY (lv. 2- lv. 2.5); Nathan Phone #: ###-####
BLD-Conference6/10/20156/11/20156/12/2015APASS
DetailsDave Hannah
Inspect cast-in place Pioneer stair rise/run for first stair section at Level 3. Contact Nate with MCI. ###-####. Phone #: ###-#### Inspection requested via web by Noelle Idehara
Plan resubmittals received  9/10/2014 DONE
DetailsChristina Prado
Received three sets of deferred submital sheets and calcs for Metal Column Covers
BLD-Conference8/26/20148/27/20148/27/2014APASS
DetailsDave Hannah
Requesting a consult with Dave and the special inspector. Please contact Al at ###-####. Phone #: ###-#### Inspection requested via web by Noelle Idehara
CHANGE STATUS TO (ISS)  3/6/2014 DONE
DetailsTisha Gallop
picked up approved plan mod, no fees
Expiration Notice3/5/20143/26/20143/5/2014 DONE
DetailsChristina Prado
PLANS/APPL TAKEN TO FRONT DESK  3/3/2014 DONE
Pending Assignment by JCM7/18/2013 3/3/2014 PASS
DetailsJohn Menard
Plan assigned to (JCM)3/28/2013 3/3/2014 PASS
DetailsJohn Menard
1st Review for Plan Mod completed 4/4/2013. JCM
Routing Off Site - STRUCTURAL11/27/2013 12/6/2013 PASS
Pioneer stair plan mod passed.
Routing - PLAN CHECK11/21/2013 12/6/2013 PASS
DetailsJohn Menard
Pioneer Stair Plan mod apporved.
Plan resubmittals received  11/21/2013 DONE
REceived second submittal for Pioneer stair modification. Calcs and sheet S3-03-A-R.
BLD-Concrete10/7/201310/10/201310/14/2013APEND
DetailsDave Hannah
Brian Phone #: ###-####
BLD-Concrete10/7/201310/8/201310/9/2013APEND
DetailsDave Hannah
Brian Phone #: ###-#### talked with al from strata
BLD-Concrete9/25/20139/26/20139/26/2013APART
DetailsDave Hannah
Brian Phone #: ###-#### walked project with al from strata
BLD-Foundation9/17/20139/17/20139/23/2013PPEND
DetailsDave Hannah
brian Phone #: ###-####
Routing Off Site - STRUCTURAL8/15/2013 8/30/2013 FAIL
DetailsJohn Menard
Telephone call  8/15/2013 DONE
DetailsChristina Prado
called Action Couriers for pick up
Plan resubmittals received  8/14/2013 DONE
DetailsChristina Prado
received three sets of revised structural calcs, response letter and plans marked S3-01-A, S3-03-A-R, S3-51 & S5-01; Plans inserted by arch rep and taken to John for review
BLD-Concrete7/22/20137/25/20137/25/2013APASS
DetailsDave Hannah
brian murphy Phone #: ###-####
BLD-Concrete7/22/20137/23/20137/23/2013APASS
DetailsDave Hannah
brian murphy Phone #: ###-####
OVERRIDE  7/11/2013  
BLD-Concrete7/10/20137/10/20137/11/2013PPART
DetailsDave Hannah
brian Phone #: ###-#### column placement al on site for strata doing inspection
PLANS/APPL TAKEN TO FRONT DESK  7/11/2013 DONE
DetailsJohn Menard
Inspection Record Card- Bld  7/11/2013 DONE
DetailsChristina Prado
Permit Ready to Issue  7/11/2013 DONE
DetailsTisha Gallop
Telephone call  7/11/2013 DONE
DetailsTisha Gallop
called Noelle and told her plan mod is ready and fee due.
Routing - PLAN CHECK5/7/2013 5/14/2013 PASS
DetailsJohn Menard
Deferred submittal for post tension concrete. Was reviewed and approved by consulting structural engineer without comment. JCM
Plan Reviewer's activity  5/14/2013 DONE
DetailsJohn Menard
I gave the issue copy of the deferred submittal plans, specs. and calculations for the post tension concrete to Noelle Spencer to deliver to the job site. JCM
Routing Off Site - STRUCTURAL5/7/2013 5/13/2013 PASS
DetailsJohn Menard
Received and e-mail from cosulting structural engineer approving the post-tension concrete deferred submittal without comment. JCM
Plan resubmittals received  5/7/2013  
Recieved 2 plan modification applications, 3 copies of post tension calcs, 3 copies of PT-01, PT-02, PT-03, PT-04, PT-05, PT-06, PT-07, PT-08, PT-09, PT-10, PT-11, PT-12, PT-13, PT14, PT-15, PT-16, PT-17, PT-18 and taken to John Menard as a deffered submittal
BLD-Conference5/1/20135/2/20135/6/2013ADONE
DetailsDave Hannah
joe - 10 am meeting Phone #: ###-####
Routing - PLAN CHECK3/28/2013 4/24/2013  
DetailsJohn Menard
Routing Off Site - STRUCTURAL3/28/2013 4/24/2013 FAIL
DetailsJohn Menard
called Action Couriers for plan mod pick up - Received comment list from consulting structural engineer for the plan mod. JCM
Plan resubmittals requested  4/24/2013 DONE
DetailsJohn Menard
E-mailed the applicant a copy of the structural review for the plan modification on the Pioneer stair and skylight. JCM
Plan Modification Accepted  3/28/2013 DONE
DetailsChristina Prado
Plan Mod for changes to cast-in-place Pioneer stair & Pioneer room skylight - Received three sets of structural calcs as well as plans marked S3-02-A, S3-03-A, S3-08-A, S3-51, S4-12, S5-32 & S6-21;Taken to John Menard for review
Issue PAID IN FULL permit  12/4/2012 DONE
DetailsBarbara Stitt
Plan assigned to (JCM)8/30/20128/30/201211/28/2012 PASS
DetailsJohn Menard
Routing - PLAN CHECK10/19/2012 11/28/2012 PASS
DetailsJohn Menard
PLANS/APPL TAKEN TO FRONT DESK  11/28/2012 DONE
DetailsJohn Menard
Inspection Record Card- Bld  11/28/2012 DONE
Telephone call  11/28/2012 DONE
DetailsChristina Prado
Called Noelle to advise permit is ready for pick up pending payment and GC form
Permit Ready to Issue  11/28/2012 DONE
DetailsChristina Prado
Plan resubmittals received  11/27/2012 DONE
DetailsChristina Prado
Received two copies of plans marked - S0-02, S0-03, S1-01, S1-02, S3-01-A, S3-01-B, S3-02-A, S3-02-C, S3-03-A-R, S3-03-B, S3-03-B-R, S3-03-C-R, S3-04-A-R, S3-04-B, S3-04-B-R, S3-04-C-R, S3-05-A-R, S3-05-B-R, S3-05-C-R, S3-06-A, S3-06-C, S3-07-A, S3-08-A, S4-12, S4-13, S5-01, S5-03, S5-21, S5-22, S5-25, S6-01, S6-11, S6-12 & S6-21; Sheet inserted by Noelle and given back to John for review
Routing Off Site - STRUCTURAL11/8/2012 11/20/2012 PASS
DetailsJohn Menard
Called Action Courier for pick up @ 8:45am//BAS
Received comments from consulting engineer. The two comments were minor in nature and did not require a response. JCM
Plan resubmittals received  11/7/2012 DONE
DetailsTisha Gallop
received resopnse from architect, three copies of structural calcs and three copies of plan sheets S0-02, S0-03, S1-01, S1-02, S3-01-A, S3-01-B, S3-02-A, S3-02-C, S3-03-A-R, S3-03-B, S3-03-B-R, S3-03-C-R, S3-04-A-R, S3-04-B, S3-04-B-R, S3-04-C-R, S3-05-A-R, S3-05-B-R, S3-05-C-R, S3-06-A, S3-06-C, S3-07-A, S3-08-A, S4-12, S4-13, S5-01, S5-03, S5-21, S5-22, S5-25, S6-01, S6-11, S6-12, S6-21; inserted by arch rep and taken back to John Menard.
Route to Impact Fee Review10/16/201210/19/201210/19/2012 PASS
DetailsCindy M. Gould
will put the impact fees on the shell and core permit cmg
Routing - FIRE10/15/201210/15/201210/19/2012 PASS
DetailsScott Arellano
No comments attached for this permit. Subsequent plans will have Fire Comments attached.
1st review completed  10/19/2012 FAIL
Failed Structural
Plan resubmittals requested  10/16/2012 DONE
DetailsJohn Menard
E-mailed the applicant a copy of the structural review requesting revisions. JCM
Routing Off Site - STRUCTURAL9/10/2012 10/15/2012 FAIL
DetailsJohn Menard
9-10-12 called Action Couriers for pick up - Received comment list from consulting structural engineer requesting revisions. JCM
Routing - PLAN CHECK9/5/2012 10/15/2012  
DetailsJohn Menard
John Menard
Routing - PLANNING9/4/2012 9/5/2012 PASS
DetailsSarah Schafer
Approved per DRH10-00178 and subsequent work sessions.
Routing - PUBLIC WORKS8/30/2012 9/4/2012 PASS
DetailsConnie Baumgartner
Routing - Erosion and Sediment9/4/2012 9/4/2012 PASS
DetailsKimberly M. Johnson
Refer to ESC12-00403
Routing - Addressing8/31/2012 8/31/2012 PASS
DetailsTerry Records
Routing PW Sewer Rating8/31/2012 8/31/2012 PASS
DetailsConnie Baumgartner
Routing PW Drainage8/31/2012 8/31/2012 PASS
DetailsBrian Murphy
Application received 8/29/20128/30/2012 DONE
DetailsTisha Gallop
Routing - PLANNING Land Div8/30/2012 8/30/2012 PASS
DetailsDave Abo
PARCEL "J' OF ROS #9185. Boise City ROS12-00014.
Plans ACCEPTED BY PLAN TECH  8/29/2012 DONE
DetailsTisha Gallop
Recd Pcfee & Taken To Pln CK  8/29/2012 DONE
DetailsTisha Gallop
Routing - PLAN CHECK     
DetailsJohn Menard