Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD12-02323
StatusFinaled
Name RRC CONTRACTORS
Site Address 6945 W OVERLAND RD
Project NameD & B SUPPLY
Customer Number 
ePlanReviewNo
Description
(D & B SUPPLY) The fire sprinkler system is used for building area increase and for fire area. To remodel an existing 42,456 square foot tenant space for a new retail tenant. The 2,028 square foot back addition was constructed under permit BLD12-02418. Work is to include interior nonbearing walls, 2 restrooms accessible to the disabled, a roll-up exterior door, exterior concrete stairways and ramp, guards, handrails, suspended acoustical ceilings, display fixtures, and finishes. About 3,350 square feet of roof structure will be removed and replaced with new construction. This will allow the ceiling height to be increased by about 4 feet in that area. Structural work includes new roof beams, new roof joists, and new roof sheathing. New continuous roof insulation (R-20 minimum) and a new TPO roof membrane will be installed above the new roof deck. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Print Statement  10/3/2013 DONE
Print Statement  6/17/2013 DONE
DetailsTisha Gallop
mailed to RRC Contractors
Third Notice 3/31/20134/23/2013 DONE
mailed
Third Notice 2/24/20133/26/2013 DONE
faxed
Second Notice 2/7/20132/19/2013 DONE
faxed 2-19-13
First Notice 1/26/20131/28/2013 DONE
Permanent Occupancy  1/16/2013 DONE
DetailsBarbara Stitt
BLD-Final1/15/20131/15/20131/15/2013PPASS
DetailsTom Arcoraci
BRIAN LATE AFTERNOON IF POSSIBLE Phone #: ###-####
FIRE-Final Inspection1/7/20131/8/20131/8/2013APASS
DetailsTroy Cobbley
Life safety passed.
FIRE-Conference12/31/201212/31/201212/31/2012PDONE
DetailsTroy Cobbley
Per Romeo Gervais, with the fire alarm functional, it is ok for the owner to begin stocking the store. Public is not allowed until the fire alarm permit has been finaled and the life safety signed off.
FIRE-Hydro test above ground12/31/201212/31/201212/31/2012PCANC
DetailsTroy Cobbley
Wrong inspection type requested.
BLD-Final12/27/201212/28/201212/28/2012PPEND
DetailsTom Arcoraci
Brian Phone #: ###-#### ok to stock
FIRE-Final Inspection12/27/201212/28/201212/28/2012AFAIL
DetailsTroy Cobbley
Life safety is ok to final when the project related fire alarm permit is passed. Per Romeo it will be ok for the owner to stock if the fire alarm is inspected to verify that sprinkler and hvac monitoring is in place.
BLD-Ceiling Grid Inspection12/18/201212/18/201212/18/2012PPASS
DetailsJim Storey
Brian Phone #: ###-####
BLD-Energy code compliance11/15/201211/16/201211/16/2012APASS
DetailsTom Arcoraci
brian Phone #: ###-####
FIRE-Conference11/15/201211/15/201211/15/2012PDONE
DetailsTroy Cobbley
Per Boise Fire Dept. request I left correction notice requiring the existing FDC at the east wall to meet NFPA 13 requirements for height above access level (18" to 4'). Contractor stated that it will be no problem since a new docking is going to be constructed under it.
BLD-Framing/Rough-in11/8/201211/8/201211/8/2012PPASS
DetailsTom Arcoraci
nailing insp for roof//Derek Phone #: ###-####
Issue PAID IN FULL permit  10/22/2012 DONE
DetailsBarbara Stitt
OVERRIDE  10/19/2012  
Plan assigned to (CJW)8/30/20128/30/201210/19/2012 PASS
DetailsCarl Westfall
D & B SUPPLY (20 days - Sept 25)
Routing - PLAN CHECK10/18/2012 10/19/2012 DONE
DetailsCarl Westfall
PLANS/APPL TAKEN TO FRONT DESK  10/19/2012 DONE
Print Occupancy Form  10/19/2012 DONE
DetailsTisha Gallop
Telephone call  10/19/2012 DONE
Derek called let him know that the permit was ready fees given
Permit Ready to Issue  10/19/2012 DONE
Routing - FIRE10/12/2012 10/18/2012 PASS
DetailsScott Arellano
Attached plan review comments to plans.
Routing - PLAN CHECK10/2/2012 10/12/2012 PASS
DetailsCarl Westfall
Drawings approved after 2nd IBC plan review.
Plan resubmittals received  10/10/2012 DONE
DetailsTisha Gallop
received response to building review, response to fire review, two copies of structural calcs and plan sheets A-0.1, A-3.0, A-3.3, A-3.4, A-6.0, A-7.0, A-7.1, P-4.0, M-2.0; taken to Carl Westfall.
Route to Impact Fee Review9/28/201210/3/201210/5/2012 PASS
DetailsCindy M. Gould
Tenant improvement no impact fees
Routing - FIRE9/28/20129/28/201210/2/2012 FAIL
DetailsScott Arellano
Emailed and Faxed resubmittal items to architect.
1st review completed  10/2/2012 FAIL
Failed Plan Check and Fire.
Routing - PLAN CHECK9/6/2012 9/28/2012 FAIL
DetailsCarl Westfall
The IBC plan review was started on Sept 27 and was finished the next day. Revised drawings were required. See the plan review report.
Routing - Design Review9/6/2012 9/6/2012 PASS
DetailsAndrea Tuning
Andrea Tuning - New exterior stairs and ramp at rear of building
Routing - PLANNING Land Div9/5/2012 9/6/2012 PASS
DetailsDave Abo
This structure has had numerous building permits, zoning certificates, design reviews issued and approved by the City of Boise since 1995.
Routing - PLUMBING9/4/2012 9/5/2012 PASS
DetailsBill VanDegrift
per plans and 2003 upc
Routing - PUBLIC WORKS8/31/2012 9/4/2012 PASS
DetailsConnie Baumgartner
Routing - Erosion and Sediment9/4/2012 9/4/2012 PASS
DetailsKimberly M. Johnson
Waiver request approved per conditions. Waiver approved for phase I work only
Routing - Addressing8/30/2012 8/31/2012 PASS
DetailsTerry Records
Pending Assignment by JCB8/29/2012 8/30/2012 DONE
DetailsJason Blais
Application received 8/29/20128/29/2012 DONE
DetailsBarbara Stitt
Plans ACCEPTED BY PLAN TECH  8/29/2012 DONE
DetailsBarbara Stitt
Intake Approval  8/29/2012 PASS
DetailsTim L. Woodard
Recd Pcfee & Taken To Pln CK  8/29/2012 DONE
DetailsBarbara Stitt