Print Statement | | | 10/3/2013 | | DONE |
|
|
|
|
Print Statement | | | 6/17/2013 | | DONE |
Tisha Gallop
|
|
|
mailed to RRC Contractors
|
Third Notice | | 3/31/2013 | 4/23/2013 | | DONE |
|
|
|
mailed
|
Third Notice | | 2/24/2013 | 3/26/2013 | | DONE |
|
|
|
faxed
|
Second Notice | | 2/7/2013 | 2/19/2013 | | DONE |
|
|
|
faxed 2-19-13
|
First Notice | | 1/26/2013 | 1/28/2013 | | DONE |
|
|
|
|
Permanent Occupancy | | | 1/16/2013 | | DONE |
Barbara Stitt
|
|
|
|
BLD-Final | 1/15/2013 | 1/15/2013 | 1/15/2013 | P | PASS |
Tom Arcoraci
|
|
|
BRIAN LATE AFTERNOON IF POSSIBLE Phone #: ###-####
|
FIRE-Final Inspection | 1/7/2013 | 1/8/2013 | 1/8/2013 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed.
|
FIRE-Conference | 12/31/2012 | 12/31/2012 | 12/31/2012 | P | DONE |
Troy Cobbley
|
|
|
Per Romeo Gervais, with the fire alarm functional, it is ok for the owner to begin stocking the store. Public is not allowed until the fire alarm permit has been finaled and the life safety signed off.
|
FIRE-Hydro test above ground | 12/31/2012 | 12/31/2012 | 12/31/2012 | P | CANC |
Troy Cobbley
|
|
|
Wrong inspection type requested.
|
BLD-Final | 12/27/2012 | 12/28/2012 | 12/28/2012 | P | PEND |
Tom Arcoraci
|
|
|
Brian Phone #: ###-#### ok to stock
|
FIRE-Final Inspection | 12/27/2012 | 12/28/2012 | 12/28/2012 | A | FAIL |
Troy Cobbley
|
|
|
Life safety is ok to final when the project related fire alarm permit is passed. Per Romeo it will be ok for the owner to stock if the fire alarm is inspected to verify that sprinkler and hvac monitoring is in place.
|
BLD-Ceiling Grid Inspection | 12/18/2012 | 12/18/2012 | 12/18/2012 | P | PASS |
Jim Storey
|
|
|
Brian Phone #: ###-####
|
BLD-Energy code compliance | 11/15/2012 | 11/16/2012 | 11/16/2012 | A | PASS |
Tom Arcoraci
|
|
|
brian Phone #: ###-####
|
FIRE-Conference | 11/15/2012 | 11/15/2012 | 11/15/2012 | P | DONE |
Troy Cobbley
|
|
|
Per Boise Fire Dept. request I left correction notice requiring the existing FDC at the east wall to meet NFPA 13 requirements for height above access level (18" to 4'). Contractor stated that it will be no problem since a new docking is going to be constructed under it.
|
BLD-Framing/Rough-in | 11/8/2012 | 11/8/2012 | 11/8/2012 | P | PASS |
Tom Arcoraci
|
|
|
nailing insp for roof//Derek Phone #: ###-####
|
Issue PAID IN FULL permit | | | 10/22/2012 | | DONE |
Barbara Stitt
|
|
|
|
OVERRIDE | | | 10/19/2012 | | |
|
|
|
|
Plan assigned to (CJW) | 8/30/2012 | 8/30/2012 | 10/19/2012 | | PASS |
Carl Westfall
|
|
|
D & B SUPPLY (20 days - Sept 25)
|
Routing - PLAN CHECK | 10/18/2012 | | 10/19/2012 | | DONE |
Carl Westfall
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/19/2012 | | DONE |
|
|
|
|
Print Occupancy Form | | | 10/19/2012 | | DONE |
Tisha Gallop
|
|
|
|
Telephone call | | | 10/19/2012 | | DONE |
|
|
|
Derek called let him know that the permit was ready fees given
|
Permit Ready to Issue | | | 10/19/2012 | | DONE |
|
|
|
|
Routing - FIRE | 10/12/2012 | | 10/18/2012 | | PASS |
Scott Arellano
|
|
|
Attached plan review comments to plans.
|
Routing - PLAN CHECK | 10/2/2012 | | 10/12/2012 | | PASS |
Carl Westfall
|
|
|
Drawings approved after 2nd IBC plan review.
|
Plan resubmittals received | | | 10/10/2012 | | DONE |
Tisha Gallop
|
|
|
received response to building review, response to fire review, two copies of structural calcs and plan sheets A-0.1, A-3.0, A-3.3, A-3.4, A-6.0, A-7.0, A-7.1, P-4.0, M-2.0; taken to Carl Westfall.
|
Route to Impact Fee Review | 9/28/2012 | 10/3/2012 | 10/5/2012 | | PASS |
Cindy M. Gould
|
|
|
Tenant improvement no impact fees
|
Routing - FIRE | 9/28/2012 | 9/28/2012 | 10/2/2012 | | FAIL |
Scott Arellano
|
|
|
Emailed and Faxed resubmittal items to architect.
|
1st review completed | | | 10/2/2012 | | FAIL |
|
|
|
Failed Plan Check and Fire.
|
Routing - PLAN CHECK | 9/6/2012 | | 9/28/2012 | | FAIL |
Carl Westfall
|
|
|
The IBC plan review was started on Sept 27 and was finished the next day. Revised drawings were required. See the plan review report.
|
Routing - Design Review | 9/6/2012 | | 9/6/2012 | | PASS |
Andrea Tuning
|
|
|
Andrea Tuning - New exterior stairs and ramp at rear of building
|
Routing - PLANNING Land Div | 9/5/2012 | | 9/6/2012 | | PASS |
Dave Abo
|
|
|
This structure has had numerous building permits, zoning certificates, design reviews issued and approved by the City of Boise since 1995.
|
Routing - PLUMBING | 9/4/2012 | | 9/5/2012 | | PASS |
Bill VanDegrift
|
|
|
per plans and 2003 upc
|
Routing - PUBLIC WORKS | 8/31/2012 | | 9/4/2012 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - Erosion and Sediment | 9/4/2012 | | 9/4/2012 | | PASS |
Kimberly M. Johnson
|
|
|
Waiver request approved per conditions. Waiver approved for phase I work only
|
Routing - Addressing | 8/30/2012 | | 8/31/2012 | | PASS |
Terry Records
|
|
|
|
Pending Assignment by JCB | 8/29/2012 | | 8/30/2012 | | DONE |
Jason Blais
|
|
|
|
Application received | | 8/29/2012 | 8/29/2012 | | DONE |
Barbara Stitt
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 8/29/2012 | | DONE |
Barbara Stitt
|
|
|
|
Intake Approval | | | 8/29/2012 | | PASS |
Tim L. Woodard
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 8/29/2012 | | DONE |
Barbara Stitt
|
|
|
|