BLD-Final | 1/9/2014 | 1/10/2014 | 1/16/2014 | P | DONE |
Dave Hannah
|
|
|
Bob Phone #: ###-####
|
BLD-Final | 1/14/2014 | 1/15/2014 | 1/15/2014 | A | PASS |
Dave Hannah
|
|
|
Bob Phone #: ###-####
|
DOC - Permit Finaled | 1/15/2014 | 1/15/2014 | 1/15/2014 | P | PASS |
Dave Hannah
|
|
|
|
Zoning Approval | 1/14/2014 | 1/14/2014 | 1/14/2014 | | DONE |
Matthew A Halitsky
|
|
|
|
BLD-Conference | 10/2/2013 | 10/2/2013 | 10/2/2013 | P | PASS |
Tom Arcoraci
|
|
|
bob Phone #: ###-####
|
BLD-Footing | 9/3/2013 | 9/3/2013 | 9/3/2013 | A | PASS |
Dave Hannah
|
|
|
Phone #: ###-#### >> Inspection requested via web by Ben Sears
|
BLD-Other | 7/22/2013 | 7/22/2013 | 7/23/2013 | P | PASS |
Dave Hannah
|
|
|
retaining wall --- bob Phone #: ###-####
|
BLD-Footing | 7/10/2013 | 7/10/2013 | 7/10/2013 | P | PASS |
Dave Hannah
|
|
|
Ben Phone #: ###-####
|
BLD-Energy code compliance | 5/10/2013 | 5/13/2013 | 5/13/2013 | A | PASS |
Dave Hannah
|
|
|
bob Phone #: ###-#### pool house
|
BLD-Framing/Rough-in | 4/23/2013 | 4/24/2013 | 4/24/2013 | A | PART |
Dave Hannah
|
|
|
framing for the studio//Bob Phone #: ###-#### ok to insulate but needs zoning approvals on changes be for ok to cover is given.
|
BLD-Other | 3/27/2013 | 3/27/2013 | 3/28/2013 | P | PASS |
Dave Hannah
|
|
|
block insp//Bob Phone #: ###-####
|
BLD-Other | 3/21/2013 | 3/22/2013 | 3/22/2013 | A | PART |
Jim Sly
|
|
|
late am, call first//masonary wall//Bob Phone #: ###-#### First lift of full grout pour OK pending Letter from Eng. or Architect approving #4 verts in footing at 16"oc and #4 verts in wall placed at 24" oc Per approved plan.
|
BLD-Energy code compliance | 3/15/2013 | 3/18/2013 | 3/18/2013 | A | PASS |
Dave Hannah
|
|
|
bob Phone #: ###-####
|
BLD-Footing | 3/8/2013 | 3/8/2013 | 3/12/2013 | P | PASS |
Dave Hannah
|
|
|
Ben Phone #: ###-#### retainning /landscape wall east prop line
|
BLD-Framing/Rough-in | 3/1/2013 | 3/1/2013 | 3/4/2013 | P | PART |
Dave Hannah
|
|
|
Bob-Please call prior to inspection Phone #: ###-#### ok to insulate new section of house needs to pickup pointloads and fire blocking
|
BLD-Energy code compliance | 2/21/2013 | 2/21/2013 | 2/22/2013 | P | PART |
Dave Hannah
|
|
|
Bob Phone #: ###-#### ok to cover first and second floor of org house and second floor over garage.
|
BLD-Foundation | 2/15/2013 | 2/15/2013 | 2/19/2013 | P | PASS |
Dave Hannah
|
|
|
Ben Phone #: ###-####
|
BLD-Footing | 2/14/2013 | 2/14/2013 | 2/15/2013 | P | PASS |
Dave Hannah
|
|
|
Bob Phone #: ###-#### small pool house in back
|
BLD-Framing/Rough-in | 2/14/2013 | 2/14/2013 | 2/14/2013 | A | PART |
Dave Hannah
|
|
|
org house and garage ok to insulate
|
BLD-Framing/Rough-in | 2/12/2013 | 2/13/2013 | 2/14/2013 | A | PASS |
Dave Hannah
|
|
|
Shear inspection--Bob Phone #: ###-#### done by jim storey jim and I walked project with contractor ext ok but needs to add one hd3 hold down.
|
BLD-Framing/Rough-in | 2/11/2013 | 2/12/2013 | 2/12/2013 | A | NR |
Jim Storey
|
|
|
Shear wall inspection please-Bob Phone #: ###-####
|
BLD-Wall Bracing | 2/1/2013 | 2/1/2013 | 2/1/2013 | P | PART |
Jim Storey
|
|
|
BOB Phone #: ###-#### all but 6/g line struc steel interface not submitted/ 2nd foor post and beam calk.// foam in attic w furnce
|
BLD-Concrete | 1/7/2013 | 1/7/2013 | 1/8/2013 | P | PART |
Dave Hannah
|
|
|
Bob Phone #: ###-#### walkway over ditch ok to pour
|
(F) Reprint permit | | | 1/7/2013 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 1/7/2013 | | DONE |
|
|
|
|
BLD-Foundation | 12/26/2012 | 12/27/2012 | 12/27/2012 | A | PASS |
Dave Hannah
|
|
|
Bob - ###-####
|
Routing Walk-In (BLD) | 11/29/2012 | 11/29/2012 | 12/20/2012 | A | PASS |
Perry Paine
|
|
|
|
Routing - PLANNING | 12/18/2012 | | 12/20/2012 | | PASS |
Matthew A Halitsky
|
|
|
to Matt Halitsky Approve DRH12-00313
|
Case Summary (BLD) | | | 12/20/2012 | | |
|
|
|
|
Inspection Record Card- Bld | | | 12/20/2012 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/20/2012 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 12/20/2012 | | |
|
|
|
|
Telephone call | | | 12/20/2012 | | |
|
|
|
called Robert permit ready and fee given ///dld
|
Case Summary (BLD) | | | 12/19/2012 | | |
|
|
|
|
Plan resubmittals received | | | 12/18/2012 | | PASS |
|
|
|
Remodel / demo / repair of existing detached accessory building to create:
garden shed / bike storage / dressing room
Resubmittals approved 12-20-2012 pep
|
BLD-Foundation | 12/17/2012 | 12/17/2012 | 12/17/2012 | P | PASS |
Dave Hannah
|
|
|
ben - (per perry ok to have insp but make sure they have engineering) Phone #: ###-####
|
Routing - MECHANICAL | 11/29/2012 | | 11/29/2012 | | PASS |
Troy James
|
|
|
|
BLD-Foundation | 11/14/2012 | 11/15/2012 | 11/15/2012 | P | PASS |
Tom Arcoraci
|
|
|
will be ready for early afternoon inspection. Phone #: ###-#### >> Inspection requested via web by Ben Sears
|
BLD-Footing | 11/13/2012 | 11/13/2012 | 11/13/2012 | P | PART |
Tony Young
|
|
|
Ben Phone #: ###-####,, south side footing ok on lower section,, per plan
|
BLD-Foundation | 11/2/2012 | 11/2/2012 | 11/6/2012 | P | PART |
Dave Hannah
|
|
|
Ben Phone #: ###-#### retanning wall between houses ok to pour
|
BLD-Foundation | 10/30/2012 | 10/31/2012 | 10/31/2012 | P | PART |
Dave Hannah
|
|
|
we would like to pour about 2 pm if possible. Phone #: ###-#### >> Inspection requested via web by Ben Sears ok to place concrete for retaining wall along ditch and house/garage
|
BLD-Footing | 10/29/2012 | 10/30/2012 | 10/30/2012 | A | PART |
Dave Hannah
|
|
|
requesting an early inspection. Phone #: ###-#### >> Inspection requested via web by Ben Sears grade beam over canal on patio ok
|
BLD-Footing | 10/26/2012 | 10/26/2012 | 10/26/2012 | P | PART |
Jim Storey
|
|
|
Bob Phone #: ###-#### rebar for mat ft ok
|
BLD-Footing | 10/24/2012 | 10/25/2012 | 10/25/2012 | A | PART |
Dave Hannah
|
|
|
retaining wall - Bob Phone #: ###-#### ok to poue keyway on ditch retaining wall west end
|
BLD-Other | 9/26/2012 | 9/26/2012 | 9/27/2012 | P | CANC |
Dave Hannah
|
|
|
matt Phone #: ###-####
|
BLD-Footing | 9/24/2012 | 9/25/2012 | 9/25/2012 | P | CANC |
Dave Hannah
|
|
|
Around 3 pm - matt Phone #: ###-####
|
BLD-Foundation | 9/10/2012 | 9/10/2012 | 9/11/2012 | P | PART |
Dave Hannah
|
|
|
Matt Phone #: ###-#### new garage ftg ok
|
BLD-Footing | 9/10/2012 | 9/10/2012 | 9/10/2012 | P | PART |
Dave Hannah
|
|
|
Matt Phone #: ###-####
|
Issue PAID IN FULL permit | | | 8/31/2012 | | DONE |
Tisha Gallop
|
|
|
|
Routing Walk-In (Zoning) | 8/30/2012 | 8/30/2012 | 8/30/2012 | P | PASS |
Josh Wilson
|
|
|
Record of Survey has not been recorded. JGW 8-30-12
recorded and signed off 10-17-2012 by Todd Tucker...pep
|
Routing Walk-In (BLD) | 8/30/2012 | 8/30/2012 | 8/30/2012 | P | DONE |
Perry Paine
|
|
|
|
Plan assigned to (PEP) | 8/30/2012 | 8/30/2012 | 8/30/2012 | | PASS |
Perry Paine
|
|
|
|
Case Summary (BLD) | | | 8/30/2012 | | |
|
|
|
|
Inspection Record Card- Bld | | | 8/30/2012 | | |
|
|
|
|
1st review completed | | | 8/30/2012 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/30/2012 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 8/30/2012 | | DONE |
Barbara Stitt
|
|
|
|
Application received | | 8/30/2012 | | | |
|
|
|
|
Routing - PLAN CHECK | 11/29/2012 | | | | |
Perry Paine
|
|
|
|