Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD12-02349
StatusFinaled
Name MIKE SIMMONDS
Site Address 1656 S LOGGERS POND PL
Project NameRIVER QUARRY APT CANOPY
Customer Number 
ePlanReviewNo
Description
RIVER QUARRY APT CANOPY- (BUILDING # 18)Section 2 of 2-To construct a new canopy above an elevated walk way on the third floor. This canopy will be 68 square feet in area making the building approximately 9,302 square feet. Work to include: construction of a wood framed canopy w/ 2X6 roof rafters and a 3 ½ inch by 9 ¼ inch microlam beam; roof covering shall comply with chapter 15 of the 2009 IBC. All work shall comply with the approved drawings, the plan review report, and all applicable codes. NOTE: This building is fully Fire Sprinklered. Any alterations or modifications to the buildings Fire Sprinkler system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13R as regulated by the Boise Fire Department. **SRZ**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final10/31/201211/1/201211/1/2012APASS
DetailsJim Storey
ben Phone #: ###-####
DOC - Permit Finaled11/1/201211/1/201211/1/2012PPASS
DetailsJim Storey
BLD-Final10/31/201210/31/201210/31/2012PCANC
DetailsTony Young
ben Phone #: ###-####,, wanted 301
FIRE-Final Inspection10/30/201210/30/201210/30/2012PPASS
DetailsForrest France
Scope of work completed. Fire life safety passed.
Issue PAID IN FULL permit  9/11/2012 DONE
DetailsBarbara Stitt
Print Occupancy Form  9/7/2012 DONE
DetailsBarbara Stitt
Telephone call  9/7/2012 DONE
DetailsTisha Gallop
Called Scott and left vm permit is ready, fee and need GC.
Permit Ready to Issue  9/7/2012 DONE
DetailsTisha Gallop
Plan assigned to (SRZ)9/4/20129/4/20129/6/2012 PASS
DetailsSam Zahorka
1st review completed. Pending Fire to PASS.
Routing - FIRE9/4/2012 9/6/2012 PASS
DetailsScott Arellano
No comments attached.
1st review completed  9/6/2012 PASS
Routing - PLAN CHECK9/6/2012 9/6/2012 PASS
DetailsSam Zahorka
PLANS/APPL TAKEN TO FRONT DESK  9/6/2012 DONE
DetailsSam Zahorka
Application received 9/4/20129/4/2012 DONE
DetailsBarbara Stitt
Plans ACCEPTED BY PLAN TECH  9/4/2012 DONE
DetailsBarbara Stitt
Intake Approval  9/4/2012 PASS
DetailsCarl Westfall
Routing - PLAN CHECK9/4/2012 9/4/2012 PASS
DetailsSam Zahorka
First Notice11/1/201211/1/2012   
DetailsJim Storey
Pending Assignment by JCB9/4/2012    
DetailsJason Blais