BLD-Final | 4/4/2013 | 4/5/2013 | 4/5/2013 | P | PASS |
Jim Storey
|
|
|
doug Phone #: ###-####
|
DOC - Permit Finaled | 4/5/2013 | 4/5/2013 | 4/5/2013 | P | PASS |
Jim Storey
|
|
|
|
BLD-Framing/Rough-in | 2/19/2013 | 2/20/2013 | 2/20/2013 | A | PASS |
Jim Storey
|
|
|
Doug Phone #: ###-#### c/n made ok
|
BLD-Wall Bracing | 2/19/2013 | 2/19/2013 | 2/19/2013 | A | FAIL |
Jim Storey
|
|
|
doug ###-#### blk and nail grage sheer inside 2/12
|
BLD-Framing/Rough-in | 1/29/2013 | 1/30/2013 | 1/30/2013 | A | PART |
Jim Storey
|
|
|
Doug Phone #: ###-#### ok to gyp house garage fronts pending resaloution
|
BLD-Framing/Rough-in | 12/12/2012 | 12/13/2012 | 12/13/2012 | A | FAIL |
Jim Storey
|
|
|
plans located near furnace in black tube - Doug Phone #: ###-#### insulated w/o aproval... truss t-13 missing bracing// exterior covered with out insp. missing double king studs and blk. per engineered design. have engineer field review and provid letter as to aproved or corections required.
|
BLD-Framing/Rough-in | 12/5/2012 | 12/7/2012 | 12/7/2012 | A | NR |
Jim Storey
|
|
|
doug Phone #: ###-#### no plans/ truss engineering/ mech failed/
|
BLD-Footing | 10/8/2012 | 10/8/2012 | 10/8/2012 | P | PASS |
Jim Storey
|
|
|
after 2pm//Doug Phone #: ###-####
|
Issue PAID IN FULL permit | | | 10/8/2012 | | DONE |
Tisha Gallop
|
|
|
|
OVERRIDE | | | 10/4/2012 | | |
|
|
|
|
Route to Impact Fee Review | 10/4/2012 | 10/9/2012 | 10/4/2012 | | PASS |
Shauna Surgeon
|
|
|
|
Plan assigned to (CDM) | 9/14/2012 | 9/14/2012 | 10/4/2012 | | PASS |
Carl D Madsen
|
|
|
|
Inspection Record Card- Bld | | | 10/4/2012 | | DONE |
Tisha Gallop
|
|
|
|
Telephone call | | | 10/4/2012 | | DONE |
|
|
|
LM permit ready fees due
|
Permit Ready to Issue | | | 10/4/2012 | | |
|
|
|
|
Routing - PLAN CHECK | 9/20/2012 | | 10/4/2012 | | PASS |
Carl D Madsen
|
|
|
|
1st review completed | | | 10/4/2012 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/4/2012 | | |
|
|
|
|
Case Summary (BLD) | | | 10/4/2012 | | DONE |
|
|
|
|
Plan resubmittals received | | | 10/3/2012 | | |
|
|
|
Received 2 copies of sheet A1.1 and taken to Carl Madsen
|
Routing - MECHANICAL | 9/21/2012 | | 9/21/2012 | | PASS |
Troy James
|
|
|
|
Routing - MECHANICAL | | | 9/20/2012 | | FAIL |
|
|
|
emailed correction to Alley
|
Routing - PUBLIC WORKS | | | 9/17/2012 | | PASS |
|
|
|
|
Routing - PLANNING | 9/17/2012 | | 9/17/2012 | | PASS |
Colleen T Carroll
|
|
|
See redlines on site plan SAC
|
Intake Approval | | | 9/14/2012 | | PASS |
|
|
|
|
Routing - Addressing | 9/14/2012 | | 9/14/2012 | | PASS |
Terry Records
|
|
|
|
Intake Approval | | | 9/7/2012 | | FAIL |
Christina Prado
|
|
|
See attached checklist - needs mech manuals, wall/garage seperation wall, crawl & attic access locations and elevated gas equipment notated
|
Application received | | 9/7/2012 | | | |
|
|
|
|