Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD12-02433
StatusFinaled
Name LEVEL CONSTRUCTION LLC
Site Address 1319 N 8TH ST
Project NameHOLLYWOOD MARKET YOGA DEMO
Customer Number 
ePlanReviewNo
Description
(HOLLYWOOD MARKET YOGA – INTERIOR DEMO) ****NO NEW CONSTRUCTION ALLOWED UNDER THIS PERMIT**** This permit is to perform demo work only. Scope of work includes removal of non-bearing interior partition walls, removal of existing plumbing, removal of interior finishes, removal of all existing outlets and wiring back to the box or properly terminated above ceiling line, and removal of some existing light fixtures. Do not remove ceiling unless sprinkler coverage is able to be maintained in accordance with the Boise City Fire Dept. All building sprinkler, alarm, and smoke evacuation systems must be maintained throughout the demo and after demo is completed. The Major TI has been submitted for this project under BLD12-02432. ****NO NEW CONSTRUCTION ALLOWED UNDER THIS PERMIT****
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final12/20/201212/20/201212/20/2012PPASS
DetailsJim Sly
andy Phone #: ###-####
DOC - Permit Finaled12/20/201212/20/201212/20/2012PPASS
DetailsJim Sly
Issue PAID IN FULL permit  9/18/2012 DONE
DetailsChristina Prado
Telephone call  9/17/2012 DONE
DetailsChristina Prado
Called and left message with Cathy to advise demo permit is ready to be picked up; no fees due
Permit Ready to Issue  9/17/2012 DONE
DetailsChristina Prado
Plan assigned to (TLW)9/11/2012 9/14/2012 PASS
DetailsTim L. Woodard
Routing - PLAN CHECK9/11/2012 9/14/2012 PASS
DetailsTim L. Woodard
Tim Woodard
1st review completed  9/14/2012 DONE
DetailsTim L. Woodard
PLANS/APPL TAKEN TO FRONT DESK  9/14/2012 DONE
DetailsTim L. Woodard
Case Summary (BLD)  9/14/2012 DONE
DetailsTim L. Woodard
Inspection Record Card- Bld  9/14/2012 DONE
Application received 9/11/20129/11/2012 DONE
DetailsBarbara Stitt
Plans ACCEPTED BY PLAN TECH  9/11/2012 DONE
DetailsBarbara Stitt
Intake Approval  9/11/2012 PASS
DetailsCarl D Madsen
Recd Pcfee & Taken To Pln CK  9/11/2012 DONE
DetailsBarbara Stitt
First Notice12/20/201212/20/2012   
DetailsJim Sly