BLD-Final | 2/7/2013 | 2/8/2013 | 2/8/2013 | P | PASS |
Jim Storey
|
|
|
Justin Phone #: ###-####
|
DOC - Permit Finaled | 2/8/2013 | 2/8/2013 | 2/8/2013 | P | PASS |
Jim Storey
|
|
|
|
BLD-Energy code compliance | 10/24/2012 | 10/24/2012 | 10/24/2012 | P | PASS |
Jim Storey
|
|
|
Justin Phone #: ###-####
|
BLD-Framing/Rough-in | 10/23/2012 | 10/23/2012 | 10/23/2012 | P | PASS |
Jim Storey
|
|
|
justin Phone #: ###-#### please call 30 min before going out
|
Routing Walk-In (BLD) | 9/27/2012 | 9/27/2012 | 9/27/2012 | P | PASS |
Perry Paine
|
|
|
contractor with questions on the attachment of new girder to floor trusses that will be on othere side of rim joist. he is going to speak to a neighbor that is an engineer....will resubmit details and calcs sealed.
|
BLD-Foundation | 9/13/2012 | 9/14/2012 | 9/14/2012 | A | PASS |
Jim Storey
|
|
|
Greg Phone #: ###-####
|
BLD-Footing | 9/13/2012 | 9/13/2012 | 9/13/2012 | P | PASS |
Dave Hannah
|
|
|
Justin Phone #: ###-####
|
OVERRIDE | | | 9/13/2012 | | |
|
|
|
|
Routing Walk-In (BLD) | 9/13/2012 | 9/13/2012 | 9/13/2012 | A | DONE |
Perry Paine
|
|
|
|
Plan assigned to (PEP) | 9/13/2012 | 9/13/2012 | 9/13/2012 | | PASS |
Perry Paine
|
|
|
|
Routing Walk-In (BLD) | 9/12/2012 | 9/12/2012 | 9/13/2012 | A | DONE |
Tisha Gallop
|
|
|
|
Case Summary (BLD) | | | 9/13/2012 | | |
|
|
|
|
Inspection Record Card- Bld | | | 9/13/2012 | | |
|
|
|
|
1st review completed | | | 9/13/2012 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/13/2012 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 9/13/2012 | | DONE |
Tisha Gallop
|
|
|
|
Issue PAID IN FULL permit | | | 9/13/2012 | | DONE |
Tisha Gallop
|
|
|
|
Routing Walk-In (Zoning) | 9/12/2012 | 9/12/2012 | 9/12/2012 | A | PASS |
Colleen T Carroll
|
|
|
|
Application received | | 9/12/2012 | | | |
|
|
|
|