Second Notice | | 5/3/2013 | 6/6/2013 | | DONE |
Christina Prado
|
|
|
complete 6-6-13
|
Print Statement | | | 6/6/2013 | | DONE |
Christina Prado
|
|
|
|
First Notice | 4/10/2013 | 4/10/2013 | 4/23/2013 | | DONE |
Jim Sly
|
|
|
|
BLD-Final | 4/9/2013 | 4/10/2013 | 4/10/2013 | A | PASS |
Jim Sly
|
|
|
Ed Anderson Phone #: ###-#### C/C issued.
|
DOC - Permit Finaled | 4/10/2013 | 4/10/2013 | 4/10/2013 | P | PASS |
Jim Sly
|
|
|
|
FIRE-Final Inspection | 4/8/2013 | 4/9/2013 | 4/9/2013 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed. Sam in plan review was going to verify that the lever/thumbturn type locks on the ADA pocket doors is code compliant prior to the building inspection.
|
Plan Reviewer's activity | | | 4/9/2013 | | DONE |
Sam Zahorka
|
|
|
All units required to be Accessible require compliant door hardware including the pocket doors. All other units required to be Type B accessible units only require the main entrance door hardware to be accessible. Call Sam Zahorka @ ###-#### for any questions concerning door hardware.
|
BLD-Final | 4/5/2013 | 4/8/2013 | 4/8/2013 | A | NR |
Jim Sly
|
|
|
ed Phone #: ###-#### Need all fire finals.
|
FIRE-Sprinkler Rough-in | 1/8/2013 | 1/10/2013 | 1/10/2013 | A | DONE |
Troy Cobbley
|
|
|
Inspection was actually for a conference for Frank Matson. We discussed sprinkler issues due to a new wall. From information provided over the phone the pendant head is not too close to the wall at 8".
|
FIRE-Sprinkler Rough-in | 1/8/2013 | 1/10/2013 | 1/10/2013 | A | CANC |
Troy Cobbley
|
|
|
Duplicate inspection
|
BLD-Framing/Rough-in | 1/7/2013 | 1/8/2013 | 1/8/2013 | A | PASS |
Jim Sly
|
|
|
Phone #: 2082496859 >> Inspection requested via mobile web by Frank Matson Advised Contractor to have fire inspector look at sprinkler head placement prior to cover.
|
Permit Ready to Issue | | | 12/14/2012 | | DONE |
Christina Prado
|
|
|
|
Inspection Record Card- Bld | | | 12/14/2012 | | DONE |
Christina Prado
|
|
|
|
Issue PAID IN FULL permit | | | 12/14/2012 | | DONE |
Christina Prado
|
|
|
|
Plan assigned to (SRZ) | 9/19/2012 | 9/19/2012 | 10/12/2012 | | PASS |
Sam Zahorka
|
|
|
ePlanReview - Springhill Suites
1st reviewe completed.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/12/2012 | | DONE |
Sam Zahorka
|
|
|
|
Routing - PLAN CHECK | 9/19/2012 | | 10/9/2012 | | PASS |
Sam Zahorka
|
|
|
|
Routing PW Sewer Rating | 10/9/2012 | | 10/9/2012 | | PASS |
Connie Baumgartner
|
|
|
|
1st review completed | | | 10/9/2012 | | PASS |
Sam Zahorka
|
|
|
|
Routing - PUBLIC WORKS | 9/19/2012 | | 10/9/2012 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - Addressing | 9/19/2012 | | 9/27/2012 | | PASS |
April Wing
|
|
|
|
Routing - FIRE | 9/19/2012 | | 9/20/2012 | | PASS |
Scott Arellano
|
|
|
Attached IFC comments to case and plans.
|
Intake Approval | | | 9/19/2012 | | PASS |
Sam Zahorka
|
|
|
|
Pending Assignment by JCB | 9/19/2012 | | 9/19/2012 | | DONE |
Jason Blais
|
|
|
|
Payment Received | | | 9/16/2012 | | DONE |
|
|
|
Payment received via Govolutions
|
Intake Approval | | | 9/14/2012 | | FAIL |
Sam Zahorka
|
|
|
Please follow the eapply instructions at the following link.
http://pds.cityofboise.org/pds-online/e-services/eplanreview/
I currently cannot open your drawings due to the file size (29.2 MB) Are the drawings bundeled together? Please either compress the drawing files or remove layers.
No submittal checklist was provided or uploaded under documents to complete the eapply intake. Please provide the submittal checklist required per the submittal instructions.
You can reach me at ###-#### if assistance is needed.
|
Application received | | | 9/12/2012 | | DONE |
|
|
|
Application submitted via PDS Online on Sep 12 2012 2:15PM
|