Permanent Occupancy | | | 4/28/2014 | | DONE |
Tisha Gallop
|
|
|
|
BLD-Final | 4/2/2014 | 4/3/2014 | 4/3/2014 | A | PASS |
Jim Sly
|
|
|
OK for Perm. Occ.
|
Print Occupancy Form | | | 4/3/2014 | | DONE |
Tisha Gallop
|
|
|
|
BLD-Final | 4/1/2014 | 4/2/2014 | 4/2/2014 | A | CANC |
Jim Sly
|
|
|
Stacie phone
|
BLD-Final | 4/1/2014 | 4/1/2014 | 4/1/2014 | P | CANC |
Jim Sly
|
|
|
|
BLD-Final | 3/24/2014 | 4/1/2014 | 4/1/2014 | A | CANC |
Jim Sly
|
|
|
Check back.
|
BLD-Final | 3/27/2014 | 3/27/2014 | 3/27/2014 | P | CANC |
Tom Arcoraci
|
|
|
|
FIRE-Final Inspection | 3/26/2014 | 3/27/2014 | 3/27/2014 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
BLD-Final | 3/26/2014 | 3/27/2014 | 3/27/2014 | P | CANC |
Tom Arcoraci
|
|
|
stacie - please call 1/2 hr prior so she can meet you there Phone #: ###-####
|
BLD-Conference | 3/5/2014 | 3/24/2014 | 3/24/2014 | P | DONE |
Jim Sly
|
|
|
Check back .......See prev. insp notes. Talked to owner......WIP.
|
FIRE-Final Inspection | 3/6/2014 | 3/7/2014 | 3/7/2014 | A | FAIL |
Troy Cobbley
|
|
|
Provide the annual inspection for the fire sprinkler system. Provide additional exit sign as discussed and repair the existing exit sign. All other correction items have been addressed.
|
BLD-Final | 3/4/2014 | 3/5/2014 | 3/5/2014 | A | NR |
Jim Sly
|
|
|
Stopped by Hooligans. No one there. Left C/N. Need Cert of Occ. Complete fire corr. items. Need to see some activity on this matter by Mon. March 24.
|
BLD-Final | 3/4/2014 | 3/4/2014 | 3/4/2014 | A | CANC |
Jim Sly
|
|
|
|
FIRE-Final Inspection | 9/25/2012 | 10/2/2012 | 10/2/2012 | A | FAIL |
Troy Cobbley
|
|
|
Provide annual inspection for the fire sprinkler system, Repair the emergency light in the southwest corridor, Provide interior emergnecy lighting, Repair the exit sign at the south east exit, Provide sticker at the south east exit, Provide exit sign at the north west exits, Remove interiro door and provide panic hardware on the exterior northwest exit door, Provide sprinkler protection in the office.
|
Plan assigned to (TLW) | 9/17/2012 | | 9/25/2012 | | PASS |
Tim L. Woodard
|
|
|
|
Routing - PLAN CHECK | 9/20/2012 | | 9/25/2012 | | PASS |
Tim L. Woodard
|
|
|
|
1st review completed | | | 9/25/2012 | | DONE |
Tim L. Woodard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/25/2012 | | DONE |
Tim L. Woodard
|
|
|
|
Case Summary (BLD) | | | 9/25/2012 | | DONE |
Tim L. Woodard
|
|
|
|
Print Occupancy Form | | | 9/25/2012 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 9/25/2012 | | |
|
|
|
|
Telephone call | | | 9/25/2012 | | |
|
|
|
9-25-12 called Stacie permit ready and fee given ///dld
|
Issue PAID IN FULL permit | | | 9/25/2012 | | DONE |
Christina Prado
|
|
|
|
Routing - Addressing | 9/19/2012 | | 9/20/2012 | | PASS |
Beverly Mountain
|
|
|
|
Routing - PUBLIC WORKS | 9/19/2012 | | 9/20/2012 | | PASS |
Beverly Mountain
|
|
|
|
Routing - PLAN CHECK | 9/17/2012 | | 9/19/2012 | | PEND |
Tim L. Woodard
|
|
|
Routed to PW for review.
|
Plans ACCEPTED BY PLAN TECH | | | 9/17/2012 | | DONE |
Christina Prado
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 9/17/2012 | | DONE |
Christina Prado
|
|
|
no fees taken in until price was clear (new C O or Name Change) Fee of $157.50 will be taken in when issued
|
First Notice | | 5/8/2014 | | | |
|
|
|
|
Application received | | 9/17/2012 | | | |
|
|
|
|