BLD-Framing/Rough-in | 6/5/2013 | 6/6/2013 | 6/6/2013 | A | PASS |
Mike Jordan
|
|
|
Nivi (said talked to you so between 8-9) Phone #: ###-####
|
DOC - Permit Finaled | 6/6/2013 | 6/6/2013 | 6/6/2013 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Framing/Rough-in | 6/3/2013 | 6/4/2013 | 6/4/2013 | A | FAIL |
Mike Jordan
|
|
|
nabi Phone #: ###-####. Needs to reapir structure as per approved plans.
|
BLD-Conference | 5/31/2013 | 6/3/2013 | 6/3/2013 | P | DONE |
Mike Jordan
|
|
|
Before 4 - Nabi Phone #: ###-####. Needs to remove some exterior sheathing to expose framing members.
|
BLD-Final | 5/31/2013 | 6/3/2013 | 6/3/2013 | P | CANC |
Mike Jordan
|
|
|
Before 4 - Nabi Phone #: ###-####
|
Routing Walk-In (Zoning) | 5/31/2013 | 5/31/2013 | 5/31/2013 | A | PASS |
Colleen T Carroll
|
|
|
Received Varinace CVA12-00042
|
Routing Walk-In (BLD) | 5/31/2013 | 5/31/2013 | 5/31/2013 | A | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
Case Summary (BLD) | | | 5/31/2013 | | DONE |
Adele J Schaffeld-Griffin
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/31/2013 | | DONE |
Adele J Schaffeld-Griffin
|
|
|
|
Inspection Record Card- Bld | | | 5/31/2013 | | DONE |
Christina Prado
|
|
|
|
Permit Ready to Issue | | | 5/31/2013 | | DONE |
Christina Prado
|
|
|
|
Issue PAID IN FULL permit | | | 5/31/2013 | | DONE |
Christina Prado
|
|
|
|
Routing Walk-In (BLD) | 9/19/2012 | 9/19/2012 | 9/19/2012 | P | FAIL |
Perry Paine
|
|
|
need varience for existing non-complying patio and cover constructed with out permits
|
Routing Walk-In (Zoning) | 9/17/2012 | 9/17/2012 | 9/19/2012 | A | DONE |
Perry Paine
|
|
|
does not meet rear setback would need to apply for a variance.
|
1st review completed | | | 9/19/2012 | | DONE |
Perry Paine
|
|
|
|
Application received | | 9/17/2012 | | | |
|
|
|
|