BLD-Framing/Rough-in | 5/10/2017 | 5/12/2017 | 5/12/2017 | A | PART |
Tony Young
|
|
|
First thing if possible // Angie Phone #: ###-####,, basement ok to cover pending electrical pass
|
CHANGE STATUS TO (ISS) | | | 1/6/2017 | | DONE |
|
|
|
|
(F) Reprint permit | | | 1/6/2017 | | DONE |
|
|
|
|
OVERRIDE | | | 1/3/2017 | | |
|
|
|
|
Telephone call | | | 1/3/2017 | | DONE |
|
|
|
called Corey to let know plan mod is ready and how much is owed-left messge on his machine
|
Plan Modification Accepted | | | 1/3/2017 | | DONE |
David Ferguson
|
|
|
|
Routing - PLAN CHECK | 1/3/2017 | | 1/3/2017 | | PASS |
David Ferguson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/3/2017 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 1/3/2017 | | DONE |
David Ferguson
|
|
|
|
Permit Ready to Issue | | | 1/3/2017 | | DONE |
|
|
|
Plan Mod-please do on re-issue
|
BLD-Energy code compliance | 9/25/2014 | 9/26/2014 | 9/26/2014 | A | PASS |
Jim Sly
|
|
|
early am // Angie Read Phone #: ###-####
|
BLD-Framing/Rough-in | 9/22/2014 | 9/24/2014 | 9/24/2014 | P | PART |
Tony Young
|
|
|
Before 11:30 please - Angie Phone #: ###-####,, ok pending mech r/in
|
Telephone call | | | 9/10/2013 | | DONE |
|
|
|
spoke to owner about plumbing vents (refferred to Daryl and fire blocking, referred to Tony.
E-mail to inspection div.
|
BLD-Wall Bracing | 6/4/2013 | 6/5/2013 | 6/5/2013 | A | PASS |
Tony Young
|
|
|
Angie Read Phone #: ###-####
|
BLD-Conference | 2/7/2013 | 2/7/2013 | 2/7/2013 | P | PART |
Tony Young
|
|
|
angie Phone #: ###-####,, roof frame ?s
|
BLD-Conference | 2/4/2013 | 2/4/2013 | 2/4/2013 | P | PART |
Tony Young
|
|
|
Angie Phone #: ###-####,, roof?s
|
BLD-Conference | 2/1/2013 | 2/4/2013 | 2/4/2013 | A | PART |
Tony Young
|
|
|
angie Phone #: ###-####,, frame ?s,, roof trusses... work in progress,, ok
|
OVERRIDE | | | 12/19/2012 | | |
|
|
|
|
BLD-Footing | 10/11/2012 | 10/12/2012 | 10/12/2012 | A | PASS |
Tony Young
|
|
|
angie- 11am if possible Phone #: ###-####
|
BLD-Footing | 10/11/2012 | 10/11/2012 | 10/11/2012 | P | PART |
Tony Young
|
|
|
angie- late if possible Phone #: ###-####,, rebar not in place yet,, forms ok
|
BLD-Footing | 10/10/2012 | 10/11/2012 | 10/11/2012 | A | NR |
Tony Young
|
|
|
angie- late if possible Phone #: ###-####
|
BLD-Footing | 10/5/2012 | 10/8/2012 | 10/8/2012 | A | CANC |
Tony Young
|
|
|
angie Phone #: ###-#### ///cancelled per Andie Reed, called inspector 8:15 am 10/8 --leg
|
Routing Walk-In (BLD) | 9/27/2012 | 9/27/2012 | 9/27/2012 | A | DONE |
Perry Paine
|
|
|
|
Plan assigned to (PEP) | 9/17/2012 | 9/17/2012 | 9/27/2012 | | PASS |
Perry Paine
|
|
|
|
Case Summary (BLD) | | | 9/27/2012 | | |
|
|
|
|
Inspection Record Card- Bld | | | 9/27/2012 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/27/2012 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 9/27/2012 | | DONE |
Barbara Stitt
|
|
|
|
Permit Ready to Issue | | | 9/27/2012 | | DONE |
Barbara Stitt
|
|
|
|
CHANGE STATUS TO (ISS) | | | 9/27/2012 | | DONE |
|
|
|
|
Routing Walk-In (BLD) | 9/17/2012 | 9/17/2012 | 9/19/2012 | P | FAIL |
Perry Paine
|
|
|
need engineering ESreport and floor plan of existing.;
|
1st review completed | | | 9/19/2012 | | FAIL |
|
|
|
|
Routing Walk-In (Zoning) | 9/17/2012 | 9/17/2012 | 9/17/2012 | P | PASS |
Colleen T Carroll
|
|
|
|
Application received | | 9/17/2012 | | | |
|
|
|
|