BLD-Final | 1/10/2013 | 1/11/2013 | 1/11/2013 | A | PASS |
Mike Jordan
|
|
|
Phone #: 6088231 >> Inspection requested via mobile web by Rustin
|
DOC - Permit Finaled | 1/11/2013 | 1/11/2013 | 1/11/2013 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Final | 1/9/2013 | 1/10/2013 | 1/10/2013 | P | FAIL |
Mike Jordan
|
|
|
Phone #: 6088231 >> Inspection requested via mobile web by Rustin. Provide required energy cert and blower door test results and post. Provide a ladder at basement window well at bedroom.
|
BLD-Energy code compliance | 11/29/2012 | 11/30/2012 | 11/30/2012 | A | PASS |
Mike Jordan
|
|
|
Phone #: 6088231 >> Inspection requested via mobile web by Rustin
|
BLD-Energy code compliance | 11/28/2012 | 11/29/2012 | 11/29/2012 | P | FAIL |
Mike Jordan
|
|
|
Phone #: 6088231 >> Inspection requested via mobile web by Rustin. foam under master bedroom tub, encapsulate basement wall at crawl space, complete all fireblocking.
|
BLD-Framing/Rough-in | 11/28/2012 | 11/28/2012 | 11/28/2012 | P | PASS |
Mike Jordan
|
|
|
Phone #: 6088231 >> Inspection requested via mobile web by Rustin
|
BLD-Wall Bracing | 11/27/2012 | 11/27/2012 | 11/27/2012 | P | PASS |
Mike Jordan
|
|
|
Phone #: 6088231 >> Inspection requested via mobile web by Rustin
|
BLD-Wall Bracing | 11/26/2012 | 11/26/2012 | 11/26/2012 | P | FAIL |
Mike Jordan
|
|
|
Phone #: 6088231 >> Inspection requested via mobile web by Rustin
|
Plan resubmittals received | | | 11/23/2012 | | DONE |
|
|
|
new acca report
|
Routing - MECHANICAL | 11/23/2012 | | 11/23/2012 | | PASS |
Troy James
|
|
|
resubmitted acca report
|
BLD-Wall Bracing | 11/21/2012 | 11/21/2012 | 11/21/2012 | P | NR |
Mike Jordan
|
|
|
Phone #: 6088232 >> Inspection requested via mobile web by rustin. No approved plans on site.
|
CHANGE STATUS TO (ISS) | | | 10/24/2012 | | |
|
|
|
final by mistake per Mike Jordan put back in the issue status///dld
|
BLD-Conference | 10/18/2012 | 10/18/2012 | 10/18/2012 | P | PASS |
Mike Jordan
|
|
|
To verify setback requirements are being met
|
DOC - Permit Finaled | 10/18/2012 | 10/18/2012 | 10/18/2012 | P | PASS |
Mike Jordan
|
|
|
Retaing wall in question is ok.
|
BLD-Foundation | 10/16/2012 | 10/17/2012 | 10/17/2012 | A | PART |
Mike Jordan
|
|
|
request 10-11am inspection Phone #: ###-#### >> Inspection requested via web by Ben Sears. Basement walls and perimeter footings. Noted to concrete contractor to hold off o interior footings at interior basement wall until general contractor has either sumbitted a design mod for not backfilling at interior basement wall or will backfill at this location. Also noted that a reinspection is required.
|
BLD-Footing | 10/11/2012 | 10/12/2012 | 10/12/2012 | A | PASS |
Tom Arcoraci
|
|
|
request inspection between 11am and noon. Phone #: ###-#### >> Inspection requested via web by Ben Searswip ok
|
OVERRIDE | | | 10/8/2012 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 10/8/2012 | | DONE |
Tisha Gallop
|
|
|
|
Telephone call | | | 10/8/2012 | | DONE |
Christina Prado
|
|
|
Called Stan to advise permit is ready and gave fees due
|
Permit Ready to Issue | | | 10/8/2012 | | DONE |
Christina Prado
|
|
|
|
Plan assigned to (CDM) | 10/4/2012 | 10/4/2012 | 10/5/2012 | | PASS |
Mike Jordan
|
|
|
|
Plan assigned to (CDM) | 10/4/2012 | 10/4/2012 | 10/5/2012 | | PASS |
Mike Jordan
|
|
|
|
Plan assigned to (CDM) | | 9/18/2012 | 10/5/2012 | | PASS |
Carl D Madsen
|
|
|
|
Routing - PLAN CHECK | 9/25/2012 | | 10/5/2012 | | PASS |
Carl D Madsen
|
|
|
|
1st review completed | | | 10/5/2012 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/5/2012 | | |
|
|
|
|
Case Summary (BLD) | | | 10/5/2012 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 10/5/2012 | | DONE |
Tisha Gallop
|
|
|
|
Routing - PLANNING | 10/3/2012 | | 10/4/2012 | | PASS |
Susan Riggs
|
|
|
|
Routing - MECHANICAL | 9/27/2012 | | 9/27/2012 | | PASS |
Troy James
|
|
|
|
Route to Impact Fee Review | 9/18/2012 | 9/21/2012 | 9/25/2012 | | PASS |
Cindy M. Gould
|
|
|
THERE WAS A PRIOR PRK ON THIS LOT BUT THE SYSTEM SHOWS A REFUND OF THE AMOUNT PAID
|
Routing - MECHANICAL | 9/18/2012 | | 9/25/2012 | | FAIL |
Troy James
|
|
|
emailed corrections to Teds Heating
|
Plan resubmittals received | | | 9/24/2012 | | DONE |
Tisha Gallop
|
|
|
Received two copies full new set of plans and two reduced site plans; put with plans in mechanical review.
|
Routing - PUBLIC WORKS | | | 9/19/2012 | | PASS |
Connie Baumgartner
|
|
|
|
Application received | | 9/18/2012 | 9/18/2012 | | DONE |
Christina Prado
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 9/18/2012 | | DONE |
Christina Prado
|
|
|
|
Intake Approval | | | 9/18/2012 | | PASS |
Christina Prado
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 9/18/2012 | | DONE |
Christina Prado
|
|
|
|
Routing - Addressing | 9/18/2012 | | 9/18/2012 | | PASS |
Terry Records
|
|
|
|
Routing - PLANNING | 9/19/2012 | | 6/19/2012 | | FAIL |
Susan Riggs
|
|
|
Requires 30' rear yard setback. I called applicant Stan Ray.
|
BLD-Energy code compliance | 12/14/2012 | 11/30/2012 | | A | |
Mike Jordan
|
|
|
Phone #: 6088231 >> Inspection requested via mobile web by Rustin
|